My bibliography
Save this item
A stochastic model for joint spare parts inventory and planned maintenance optimisation
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
- Efraim Laksman & Ann-Brith Strömberg & Michael Patriksson, 2020. "The stochastic opportunistic replacement problem, part III: improved bounding procedures," Annals of Operations Research, Springer, vol. 292(2), pages 711-733, September.
- Zhong, Chongquan & Jin, Haibo, 2014. "A novel optimal preventive maintenance policy for a cold standby system based on semi-Markov theory," European Journal of Operational Research, Elsevier, vol. 232(2), pages 405-411.
- Gu, Jingyao & Zhang, Guoqing & Li, Kevin W., 2015. "Efficient aircraft spare parts inventory management under demand uncertainty," Journal of Air Transport Management, Elsevier, vol. 42(C), pages 101-109.
- Christiane B. Haubitz & Ulrich W. Thonemann, 2021. "How to Change a Running System—Controlling the Transition to Optimized Spare Parts Inventory Policies," Production and Operations Management, Production and Operations Management Society, vol. 30(5), pages 1386-1405, May.
- Ruifeng Yang & Jianshe Kang & Qiwei Hu, 2018. "Integrated maintenance policy optimization with finite spares," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 9(5), pages 1014-1021, October.
- Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
- Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable flow in forward and after-sales supply chains considering propagated uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 409-436.
- Yazdekhasti, Amin & sharifzadeh, Shila & Ma, Junfeng, 2022. "A two-echelon two-indenture warranty distribution network development and optimization under batch-ordering inventory policy," International Journal of Production Economics, Elsevier, vol. 249(C).
- Zhang, Chen & Gao, Wei & Yang, Tao & Guo, Sheng, 2019. "Opportunistic maintenance strategy for wind turbines considering weather conditions and spare parts inventory management," Renewable Energy, Elsevier, vol. 133(C), pages 703-711.
- Panagiotidou, Sofia, 2014. "Joint optimization of spare parts ordering and maintenance policies for multiple identical items subject to silent failures," European Journal of Operational Research, Elsevier, vol. 235(1), pages 300-314.
- Yan, Tao & Lei, Yaguo & Wang, Biao & Han, Tianyu & Si, Xiaosheng & Li, Naipeng, 2020. "Joint maintenance and spare parts inventory optimization for multi-unit systems considering imperfect maintenance actions," Reliability Engineering and System Safety, Elsevier, vol. 202(C).
- Zhang, Xiaohong & Zeng, Jianchao, 2017. "Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems," European Journal of Operational Research, Elsevier, vol. 262(2), pages 479-498.
- Wang, Jingjing & Qiu, Qingan & Wang, Huanhuan, 2021. "Joint optimization of condition-based and age-based replacement policy and inventory policy for a two-unit series system," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
- Zheng, Meimei & Ye, Hongqing & Wang, Dong & Pan, Ershun, 2021. "Joint Optimization of Condition-Based Maintenance and Spare Parts Orders for Multi-Unit Systems with Dual Sourcing," Reliability Engineering and System Safety, Elsevier, vol. 210(C).
- Pinciroli, Luca & Baraldi, Piero & Zio, Enrico, 2023. "Maintenance optimization in industry 4.0," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
- Qinming Liu & Ming Dong & Wenyuan Lv & Chunming Ye, 2019. "Manufacturing system maintenance based on dynamic programming model with prognostics information," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1155-1173, March.
- Bjarnason, Erik T.S. & Taghipour, Sharareh & Banjevic, Dragan, 2014. "Joint optimal inspection and inventory for a k-out-of-n system," Reliability Engineering and System Safety, Elsevier, vol. 131(C), pages 203-215.
- Zahedi-Hosseini, Farhad & Scarf, Philip & Syntetos, Aris, 2017. "Joint optimisation of inspection maintenance and spare parts provisioning: a comparative study of inventory policies using simulation and survey data," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 306-316.
- Zhu, Mixin & Zhou, Xiaojun, 2023. "Hybrid opportunistic maintenance policy for serial-parallel multi-station manufacturing systems with spare part overlap," Reliability Engineering and System Safety, Elsevier, vol. 236(C).
- Ramez Kian & Tolga Bektaş & Djamila Ouelhadj, 2019. "Optimal spare parts management for vessel maintenance scheduling," Annals of Operations Research, Springer, vol. 272(1), pages 323-353, January.
- Jan Block & Alireza Ahmadi & Xun Xiao & Uday Kumar, 2019. "Spares provisioning strategy for periodically replaced units within the fleet retirement period," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 299-315, June.
- Boliang Lin & Jiaxi Wang & Huasheng Wang & Zhongkai Wang & Jian Li & Ruixi Lin & Jie Xiao & Jianping Wu, 2017. "Inventory-transportation integrated optimization for maintenance spare parts of high-speed trains," PLOS ONE, Public Library of Science, vol. 12(5), pages 1-18, May.
- Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable product-service supply chains for repairable products," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 95(C), pages 299-321.
- Reza Barabadi & Mohammad Ataei & Reza Khalokakaie & Ali Nouri Qarahasanlou, 2021. "Spare-part management in a heterogeneous environment," PLOS ONE, Public Library of Science, vol. 16(3), pages 1-14, March.
- Dinis, Duarte & Barbosa-Póvoa, Ana & Teixeira, Ângelo Palos, 2019. "A supporting framework for maintenance capacity planning and scheduling: Development and application in the aircraft MRO industry," International Journal of Production Economics, Elsevier, vol. 218(C), pages 1-15.
- Sleptchenko, Andrei & van der Heijden, Matthieu, 2016. "Joint optimization of redundancy level and spare part inventories," Reliability Engineering and System Safety, Elsevier, vol. 153(C), pages 64-74.
- Amin Yazdekhasti & Yahia Zare Mehrjardi, 2020. "Two-echelon three-indenture warranty distribution network: a hybrid branch and bound, Monte-Carlo approach," Operational Research, Springer, vol. 20(2), pages 1113-1158, June.
- Wang, Wenbin, 2012. "An overview of the recent advances in delay-time-based maintenance modelling," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 165-178.
- Wang, Yukun & Gao, Weizheng & Li, Xiaopeng & Liu, Yiliu, 2024. "Joint optimization of performance-based contracting, condition-based maintenance and spare parts inventory for degrading production systems," Reliability Engineering and System Safety, Elsevier, vol. 243(C).
- Xia, Tangbin & Xi, Lifeng & Zhou, Xiaojun & Lee, Jay, 2012. "Dynamic maintenance decision-making for series–parallel manufacturing system based on MAM–MTW methodology," European Journal of Operational Research, Elsevier, vol. 221(1), pages 231-240.