IDEAS home Printed from https://ideas.repec.org/p/unm/umamet/1996034.html
   My bibliography  Save this paper

The approximability of tool management problems

Author

Listed:
  • Crama, Y.

    (Externe publicaties SBE)

  • van de Klundert, J.

    (Quantitative Economics)

Abstract

No abstract is available for this item.

Suggested Citation

  • Crama, Y. & van de Klundert, J., 1996. "The approximability of tool management problems," Research Memorandum 034, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
  • Handle: RePEc:unm:umamet:1996034
    DOI: 10.26481/umamet.1996034
    as

    Download full text from publisher

    File URL: https://cris.maastrichtuniversity.nl/ws/files/1102539/guid-af2c9b05-4400-42f9-bd4f-e6fd1ae374ef-ASSET1.0.pdf
    Download Restriction: no

    File URL: https://libkey.io/10.26481/umamet.1996034?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Kathryn E. Stecke, 1983. "Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems," Management Science, INFORMS, vol. 29(3), pages 273-288, March.
    2. Blazewicz, Jacek & Finke, Gerd, 1994. "Scheduling with resource management in manufacturing systems," European Journal of Operational Research, Elsevier, vol. 76(1), pages 1-14, July.
    3. Crama, Yves & Oerlemans, Alwin G., 1994. "A column generation approach to job grouping for flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 78(1), pages 58-80, October.
    4. John W. Mamer & Andrew W. Shogan, 1987. "A Constrained Capital Budgeting Problem with Applications to Repair Kit Selection," Management Science, INFORMS, vol. 33(6), pages 800-806, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Djellab, Housni & Djellab, Khaled & Gourgand, Michel, 2000. "A new heuristic based on a hypergraph representation for the tool switching problem," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 165-176, March.
    2. Knuutila, Timo & Nevalainen, Olli, 2002. "A reduction technique for weighted grouping problems," European Journal of Operational Research, Elsevier, vol. 140(3), pages 590-605, August.
    3. Crama, Yves, 1997. "Combinatorial optimization models for production scheduling in automated manufacturing systems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 136-153, May.
    4. Hirvikorpi, Mika & Salonen, Kari & Knuutila, Timo & Nevalainen, Olli S., 2006. "The general two-level storage management problem: A reconsideration of the KTNS-rule," European Journal of Operational Research, Elsevier, vol. 171(1), pages 189-207, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Crama, Yves, 1997. "Combinatorial optimization models for production scheduling in automated manufacturing systems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 136-153, May.
    2. Crama Yves & Klundert Joris van de, 1996. "The approximability of tool management problems," Research Memorandum 019, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
    3. Yves Crama & Joris van de Klundert, 1999. "Worst‐case performance of approximation algorithms for tool management problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(5), pages 445-462, August.
    4. Matzliach, Barouch & Tzur, Michal, 2000. "Storage management of items in two levels of availability," European Journal of Operational Research, Elsevier, vol. 121(2), pages 363-379, March.
    5. Renato de Matta & Vernon Ning Hsu & Timothy J. Lowe, 1999. "Capacitated selection problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(1), pages 19-37, February.
    6. Buchheim, Christoph & Crama, Yves & Rodríguez-Heck, Elisabeth, 2019. "Berge-acyclic multilinear 0–1 optimization problems," European Journal of Operational Research, Elsevier, vol. 273(1), pages 102-107.
    7. Vliegen, I.M.H. & van Houtum, G.J., 2009. "Approximate evaluation of order fill rates for an inventory system of service tools," International Journal of Production Economics, Elsevier, vol. 118(1), pages 339-351, March.
    8. Mohamed, Zubair M. & Kumar, Ashok & Motwani, Jaideep, 1999. "An improved part grouping model for minimizing makespan in FMS," European Journal of Operational Research, Elsevier, vol. 116(1), pages 171-182, July.
    9. Christoph Rippe & Gudrun P. Kiesmüller, 2023. "The added value of advance demand information for the planning of a repair kit," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 31(1), pages 311-335, March.
    10. Potts, C. N. & Whitehead, J. D., 2001. "Workload balancing and loop layout in the design of a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 129(2), pages 326-336, March.
    11. M. Selim Akturk & Jay B. Ghosh & Evrim D. Gunes, 2003. "Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(1), pages 15-30, February.
    12. Rippe, Christoph & Kiesmüller, Gudrun P., 2023. "The repair kit problem with imperfect advance demand information," European Journal of Operational Research, Elsevier, vol. 304(2), pages 558-576.
    13. Soares, Leonardo Cabral R. & Carvalho, Marco Antonio M., 2020. "Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 285(3), pages 955-964.
    14. Mohamed, Zubair M., 1996. "A flexible approach to (re)configure Flexible Manufacturing Cells," European Journal of Operational Research, Elsevier, vol. 95(3), pages 566-576, December.
    15. Konak, Abdullah & Kulturel-Konak, Sadan & Azizoglu, Meral, 2008. "Minimizing the number of tool switching instants in Flexible Manufacturing Systems," International Journal of Production Economics, Elsevier, vol. 116(2), pages 298-307, December.
    16. Atan, Tankut S. & Pandit, Ram, 1996. "Auxiliary tool allocation in flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 89(3), pages 642-659, March.
    17. Anabela Costa & José Paixão, 2010. "An approximate solution approach for a scenario-based capital budgeting model," Computational Management Science, Springer, vol. 7(3), pages 337-353, July.
    18. Mohamed, Zubair M., 1995. "Ramifications of tool magazine size on the makespan and routing flexibility of flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 87(2), pages 289-298, December.
    19. Sodhi, Manbir S. & Lamond, Bernard F. & Gautier, Antoine & Noel, Martin, 2001. "Heuristics for determining economic processing rates in a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 129(1), pages 105-115, February.
    20. Liu, Jiyin & MacCarthy, B. L., 1997. "A global MILP model for FMS scheduling," European Journal of Operational Research, Elsevier, vol. 100(3), pages 441-453, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:unm:umamet:1996034. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Andrea Willems or Leonne Portz (email available below). General contact details of provider: https://edirc.repec.org/data/meteonl.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.