IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v116y1999i1p171-182.html
   My bibliography  Save this article

An improved part grouping model for minimizing makespan in FMS

Author

Listed:
  • Mohamed, Zubair M.
  • Kumar, Ashok
  • Motwani, Jaideep

Abstract

No abstract is available for this item.

Suggested Citation

  • Mohamed, Zubair M. & Kumar, Ashok & Motwani, Jaideep, 1999. "An improved part grouping model for minimizing makespan in FMS," European Journal of Operational Research, Elsevier, vol. 116(1), pages 171-182, July.
  • Handle: RePEc:eee:ejores:v:116:y:1999:i:1:p:171-182
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(98)00159-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Sawik, Tadeusz, 1990. "Modelling and scheduling of a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 45(2-3), pages 177-190, April.
    2. Kathryn E. Stecke, 1983. "Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems," Management Science, INFORMS, vol. 29(3), pages 273-288, March.
    3. Kulkarni, Uday R. & Kiang, Melody Y., 1995. "Dynamic grouping of parts in flexible manufacturing systems -- a self-organizing neural networks approach," European Journal of Operational Research, Elsevier, vol. 84(1), pages 192-212, July.
    4. Stecke, Kathryn E., 1992. "Planning and scheduling approaches to operate a particular FMS," European Journal of Operational Research, Elsevier, vol. 61(3), pages 273-291, September.
    5. Liang, Ming & Dutta, S. P., 1993. "An integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 67(3), pages 387-404, June.
    6. Bernardo, John J. & Mohamed, Zubair, 1992. "The measurement and use of operational flexibility in the loading of Flexible Manufacturing Systems," European Journal of Operational Research, Elsevier, vol. 60(2), pages 144-155, July.
    7. Ravi Kumar, K. & Kusiak, Andrew & Vannelli, Anthony, 1986. "Grouping of parts and components in flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 24(3), pages 387-397, March.
    8. Stecke, Kathryn E. & Toczylowski, Eugeniusz, 1992. "Profit-based FMS dynamic part type selection over time for mid-term production planning," European Journal of Operational Research, Elsevier, vol. 63(1), pages 54-65, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Das, Sidhartha R. & Canel, Cem, 2005. "An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system," International Journal of Production Economics, Elsevier, vol. 97(3), pages 247-262, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kumar, Akhilesh & Prakash & Tiwari, M.K. & Shankar, Ravi & Baveja, Alok, 2006. "Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1043-1069, December.
    2. Mohamed, Zubair M., 1996. "A flexible approach to (re)configure Flexible Manufacturing Cells," European Journal of Operational Research, Elsevier, vol. 95(3), pages 566-576, December.
    3. Mohamed, Zubair M., 1995. "Ramifications of tool magazine size on the makespan and routing flexibility of flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 87(2), pages 289-298, December.
    4. Mohamed, Zubair M. & Bernardo, John J., 1997. "Tool planning models for flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 103(3), pages 497-514, December.
    5. Liu, Jiyin & MacCarthy, B. L., 1997. "A global MILP model for FMS scheduling," European Journal of Operational Research, Elsevier, vol. 100(3), pages 441-453, August.
    6. Bokhorst, Jos A. C. & Slomp, Jannes & Suresh, Nallan C., 2002. "An integrated model for part-operation allocation and investments in CNC technology," International Journal of Production Economics, Elsevier, vol. 75(3), pages 267-285, February.
    7. Srivastava, Bharatendu & Chen, Wun-Hwa, 1996. "Batching in production planning for flexible manufacturing systems," International Journal of Production Economics, Elsevier, vol. 43(2-3), pages 127-137, June.
    8. Enrico Teich & Thorsten Claus, 2017. "Measurement of Load and Capacity Flexibility in Manufacturing," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 18(4), pages 291-302, December.
    9. Jain, Vineet & Raj, Tilak, 2016. "Modeling and analysis of FMS performance variables by ISM, SEM and GTMA approach," International Journal of Production Economics, Elsevier, vol. 171(P1), pages 84-96.
    10. Matzliach, Barouch & Tzur, Michal, 2000. "Storage management of items in two levels of availability," European Journal of Operational Research, Elsevier, vol. 121(2), pages 363-379, March.
    11. Strang, Kenneth David, 2012. "Importance of verifying queue model assumptions before planning with simulation software," European Journal of Operational Research, Elsevier, vol. 218(2), pages 493-504.
    12. Potts, C. N. & Whitehead, J. D., 2001. "Workload balancing and loop layout in the design of a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 129(2), pages 326-336, March.
    13. M. Selim Akturk & Jay B. Ghosh & Evrim D. Gunes, 2003. "Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(1), pages 15-30, February.
    14. Soares, Leonardo Cabral R. & Carvalho, Marco Antonio M., 2020. "Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 285(3), pages 955-964.
    15. Bolat, Ahmet, 1997. "Sequencing jobs for an automated manufacturing module with buffer," European Journal of Operational Research, Elsevier, vol. 96(3), pages 622-635, February.
    16. Stawowy, Adam, 2006. "Evolutionary strategy for manufacturing cell design," Omega, Elsevier, vol. 34(1), pages 1-18, January.
    17. Logendran, Rasaratnam & Talkington, Diane, 1997. "Analysis of cellular and functional manufacturing systems in the presence of machine breakdown," International Journal of Production Economics, Elsevier, vol. 53(3), pages 239-256, December.
    18. Pereira, Javier & Paulre, Bernard, 2001. "Flexibility in manufacturing systems: A relational and a dynamic approach," European Journal of Operational Research, Elsevier, vol. 130(1), pages 70-82, April.
    19. Wahab, M.I.M. & Stoyan, S.J., 2008. "A dynamic approach to measure machine and routing flexibilities of manufacturing systems," International Journal of Production Economics, Elsevier, vol. 113(2), pages 895-913, June.
    20. Atan, Tankut S. & Pandit, Ram, 1996. "Auxiliary tool allocation in flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 89(3), pages 642-659, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:116:y:1999:i:1:p:171-182. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.