IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v129y2001i2p326-336.html
   My bibliography  Save this article

Workload balancing and loop layout in the design of a flexible manufacturing system

Author

Listed:
  • Potts, C. N.
  • Whitehead, J. D.

Abstract

No abstract is available for this item.

Suggested Citation

  • Potts, C. N. & Whitehead, J. D., 2001. "Workload balancing and loop layout in the design of a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 129(2), pages 326-336, March.
  • Handle: RePEc:eee:ejores:v:129:y:2001:i:2:p:326-336
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(00)00230-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Mohammed Berrada & Kathryn E. Stecke, 1986. "A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems," Management Science, INFORMS, vol. 32(10), pages 1316-1335, October.
    2. Kathryn E. Stecke, 1983. "Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems," Management Science, INFORMS, vol. 29(3), pages 273-288, March.
    3. S. L. van de Velde, 1993. "Duality-Based Algorithms for Scheduling Unrelated Parallel Machines," INFORMS Journal on Computing, INFORMS, vol. 5(2), pages 192-205, May.
    4. Tansel, Barbaros C. & Bilen, Canan, 1998. "Move based heuristics for the unidirectional loop network layout problem," European Journal of Operational Research, Elsevier, vol. 108(1), pages 36-48, July.
    5. Kaas, R., 1981. "A branch and bound algorithm for the acyclic subgraph problem," European Journal of Operational Research, Elsevier, vol. 8(4), pages 355-362, December.
    6. Panagiotis Kouvelis & Michael W. Kim, 1992. "Unidirectional Loop Network Layout Problem in Automated Manufacturing Systems," Operations Research, INFORMS, vol. 40(3), pages 533-550, June.
    7. Leung, Janny, 1992. "A graph-theoretic heuristic for designing loop-layout manufacturing systems," European Journal of Operational Research, Elsevier, vol. 57(2), pages 243-252, March.
    8. Leung, J. & Lee, J., 1994. "More facets from fences for linear ordering and acyclic subgraph polytopes," LIDAM Reprints CORE 1087, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Öncan, Temel & AltInel, I. Kuban, 2008. "Exact solution procedures for the balanced unidirectional cyclic layout problem," European Journal of Operational Research, Elsevier, vol. 189(3), pages 609-623, September.
    2. Weckenborg, Christian & Schumacher, Patrick & Thies, Christian & Spengler, Thomas S., 2024. "Flexibility in manufacturing system design: A review of recent approaches from Operations Research," European Journal of Operational Research, Elsevier, vol. 315(2), pages 413-441.
    3. Nearchou, Andreas C., 2006. "Meta-heuristics from nature for the loop layout design problem," International Journal of Production Economics, Elsevier, vol. 101(2), pages 312-328, June.
    4. Asef-Vaziri, Ardavan & Jahandideh, Hossein & Modarres, Mohammad, 2017. "Loop-based facility layout design under flexible bay structures," International Journal of Production Economics, Elsevier, vol. 193(C), pages 713-725.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Asef-Vaziri, Ardavan & Laporte, Gilbert, 2005. "Loop based facility planning and material handling," European Journal of Operational Research, Elsevier, vol. 164(1), pages 1-11, July.
    2. Nearchou, Andreas C., 2006. "Meta-heuristics from nature for the loop layout design problem," International Journal of Production Economics, Elsevier, vol. 101(2), pages 312-328, June.
    3. Crama, Yves, 1997. "Combinatorial optimization models for production scheduling in automated manufacturing systems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 136-153, May.
    4. Yumin He & Kathryn E. Stecke & Milton L. Smith, 2016. "Robot and machine scheduling with state-dependent part input sequencing in flexible manufacturing systems," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6736-6746, November.
    5. Tansel, Barbaros C. & Bilen, Canan, 1998. "Move based heuristics for the unidirectional loop network layout problem," European Journal of Operational Research, Elsevier, vol. 108(1), pages 36-48, July.
    6. Beezão, Andreza Cristina & Cordeau, Jean-François & Laporte, Gilbert & Yanasse, Horacio Hideki, 2017. "Scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 257(3), pages 834-844.
    7. Öncan, Temel & AltInel, I. Kuban, 2008. "Exact solution procedures for the balanced unidirectional cyclic layout problem," European Journal of Operational Research, Elsevier, vol. 189(3), pages 609-623, September.
    8. Asef-Vaziri, Ardavan & Jahandideh, Hossein & Modarres, Mohammad, 2017. "Loop-based facility layout design under flexible bay structures," International Journal of Production Economics, Elsevier, vol. 193(C), pages 713-725.
    9. Soares, Leonardo Cabral R. & Carvalho, Marco Antonio M., 2020. "Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 285(3), pages 955-964.
    10. Gaalman, G. J. C. & Nawijn, W. M., 1996. "Tool sharing in parallel part production," International Journal of Production Economics, Elsevier, vol. 46(1), pages 521-533, December.
    11. Irène Charon & Olivier Hudry, 2010. "An updated survey on the linear ordering problem for weighted or unweighted tournaments," Annals of Operations Research, Springer, vol. 175(1), pages 107-158, March.
    12. Atan, Tankut S. & Pandit, Ram, 1996. "Auxiliary tool allocation in flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 89(3), pages 642-659, March.
    13. Ceberio, Josu & Mendiburu, Alexander & Lozano, Jose A., 2015. "The linear ordering problem revisited," European Journal of Operational Research, Elsevier, vol. 241(3), pages 686-696.
    14. S Bilgin & M Azizoǧlu, 2006. "Capacity and tool allocation problem in flexible manufacturing systems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(6), pages 670-681, June.
    15. Mohamed, Zubair M., 1995. "Ramifications of tool magazine size on the makespan and routing flexibility of flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 87(2), pages 289-298, December.
    16. Sodhi, Manbir S. & Lamond, Bernard F. & Gautier, Antoine & Noel, Martin, 2001. "Heuristics for determining economic processing rates in a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 129(1), pages 105-115, February.
    17. Kumar, Akhilesh & Prakash & Tiwari, M.K. & Shankar, Ravi & Baveja, Alok, 2006. "Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1043-1069, December.
    18. Mariem Besbes & Marc Zolghadri & Roberta Costa Affonso & Faouzi Masmoudi & Mohamed Haddar, 2020. "A methodology for solving facility layout problem considering barriers: genetic algorithm coupled with A* search," Journal of Intelligent Manufacturing, Springer, vol. 31(3), pages 615-640, March.
    19. Lee, Shine-Der & Chiang, Chih-Ping, 2002. "Cell formations in the uni-directional loop material handling environment," European Journal of Operational Research, Elsevier, vol. 137(2), pages 401-420, March.
    20. Chakravarty, Amiya K. & Balakrishnan, Nagraj, 1995. "Impact of job-sequence on the down-time of a deteriorating flexible machine," European Journal of Operational Research, Elsevier, vol. 87(2), pages 299-315, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:129:y:2001:i:2:p:326-336. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.