Cost overruns in Swedish infrastructure projects

Author

Listed:
  • Eliasson, Jonas

Abstract

This paper explores the accuracy of cost estimates at different planning stages for Swedish transport infrastructure projects 2004-2022. Changes in project costs are tracked between the national investment plans established in 2010, 2014, 2018 and 2022. Cost estimates tend to increase considerably during the planning stages on average, while cost estimates at start of construction do not deviate systematically from final costs. The distributions of cost escalations between subsequent investment plans are highly skewed, with modes close to zero, but means in the order of 20-30 percent for projects in the planning stages. Average cost escalations are larger for rail projects than for road projects. The paper also briefly describes the Swedish infrastructure planning and decision process, summarizes previous Swedish studies, and discusses possible causes and remedies of cost overruns.

Suggested Citation

  • Eliasson, Jonas, 2023. "Cost overruns in Swedish infrastructure projects," MPRA Paper 120340, University Library of Munich, Germany.
  • Handle: RePEc:pra:mprapa:120340
    as

    Download full text from publisher

    File URL: https://mpra.ub.uni-muenchen.de/120340/1/MPRA_paper_120340.pdf
    File Function: original version
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Hans Lind & Fredrik Brunes, 2015. "Explaining cost overruns in infrastructure projects: a new framework with applications to Sweden," Construction Management and Economics, Taylor & Francis Journals, vol. 33(7), pages 554-568, July.
    2. Nilsson, Jan-Eric, 2022. "The Weak Spot of Infrastructure BCA: Cost Overruns in Seven Road and Railway Construction Projects," Journal of Benefit-Cost Analysis, Cambridge University Press, vol. 13(2), pages 224-246, July.
    3. Morten Welde & James Odeck, 2017. "Cost escalations in the front-end of projects – empirical evidence from Norwegian road projects," Transport Reviews, Taylor & Francis Journals, vol. 37(5), pages 612-630, September.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. James Odeck, 2019. "Variation in cost overruns of transportation projects: an econometric meta-regression analysis of studies reported in the literature," Transportation, Springer, vol. 46(4), pages 1345-1368, August.
    2. Ridderstedt, Ivan & Nilsson, Jan-Eric, 2022. "Economies of scale versus the costs of bundling in the procurement of highway pavement replacement," Working Papers 2022:4, Swedish National Road & Transport Research Institute (VTI).
    3. Cavalieri, Marina & Cristaudo, Rossana & Guccio, Calogero, 2019. "On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects," Transport Policy, Elsevier, vol. 79(C), pages 21-36.
    4. Love, Peter E.D. & Sing, Michael C.P. & Ika, Lavagnon A. & Newton, Sidney, 2019. "The cost performance of transportation projects: The fallacy of the Planning Fallacy account," Transportation Research Part A: Policy and Practice, Elsevier, vol. 122(C), pages 1-20.
    5. Bardal, Kjersti Granås, 2020. "Contradictory outcomes of cost-benefit analyses – Findings from Norwegian public-investment projects," Research in Transportation Economics, Elsevier, vol. 82(C).
    6. Odeck, James & Kjerkreit, Anne, 2019. "The accuracy of benefit-cost analyses (BCAs) in transportation: An ex-post evaluation of road projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 120(C), pages 277-294.
    7. Halse, Askill Harkjerr & Fridstrøm, Lasse, 2019. "Explaining low economic return on road investments. New evidence from Norway," MPRA Paper 94389, University Library of Munich, Germany.
    8. Edyta Plebankiewicz, 2018. "Model of Predicting Cost Overrun in Construction Projects," Sustainability, MDPI, vol. 10(12), pages 1-14, November.
    9. Edyta Plebankiewicz & Damian Wieczorek, 2020. "Prediction of Cost Overrun Risk in Construction Projects," Sustainability, MDPI, vol. 12(22), pages 1-15, November.
    10. Flyvbjerg, Bent & Ansar, Atif & Budzier, Alexander & Buhl, Søren & Cantarelli, Chantal & Garbuio, Massimo & Glenting, Carsten & Holm, Mette Skamris & Lovallo, Dan & Lunn, Daniel & Molin, Eric & Rønnes, 2018. "Five things you should know about cost overrun," Transportation Research Part A: Policy and Practice, Elsevier, vol. 118(C), pages 174-190.
    11. Pyddoke, Roger, 2023. "Comparison of policies for increasing sustainable transport mode shares in Swedish cities," Working Papers 2023:9, Swedish National Road & Transport Research Institute (VTI).
    12. Love, Peter E.D. & Ika, Lavagnon A., 2021. "The ‘context’ of transport project cost performance: Insights from contract award to final construction costs," Research in Transportation Economics, Elsevier, vol. 90(C).
    13. Ridderstedt, Ivan & Nilsson, Jan-Eric, 2023. "Economies of scale versus the costs of bundling: Evidence from procurements of highway pavement replacement," Transportation Research Part A: Policy and Practice, Elsevier, vol. 173(C).
    14. Zangeneh, Pouya & McCabe, Brenda, 2022. "Modelling socio-technical risks of industrial megaprojects using Bayesian Networks and reference classes," Resources Policy, Elsevier, vol. 79(C).

    More about this item

    Keywords

    cost overruns; transport infrastructure; project management; decision processes; transport policy;
    All these keywords.

    JEL classification:

    • R42 - Urban, Rural, Regional, Real Estate, and Transportation Economics - - Transportation Economics - - - Government and Private Investment Analysis; Road Maintenance; Transportation Planning

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pra:mprapa:120340. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Joachim Winter (email available below). General contact details of provider: https://edirc.repec.org/data/vfmunde.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.