IDEAS home Printed from https://ideas.repec.org/a/taf/transr/v37y2017i5p612-630.html
   My bibliography  Save this article

Cost escalations in the front-end of projects – empirical evidence from Norwegian road projects

Author

Listed:
  • Morten Welde
  • James Odeck

Abstract

This paper investigates an issue largely ignored in the transport literature on cost overruns, namely, cost increases in the early project phase, long before the decision to build is made. This is the phase of project planning that is referred to as the front-end phase in the literature. The rationale of the study is that unless cost estimates during the front-end phase are relatively accurate, the wrong projects may be selected for further development. We first argue for why it is important to address cost escalation during the front-end phase of project planning. We then use Norwegian data to demonstrate the magnitude of cost escalations during the front-end phase of projects and in comparison to the implementation phase. We find that even in a sample of projects with relatively small cost overruns as in the case of Norway, there are substantial cost increases before the formal decision to build was made. This raises the issue of whether decisions and priorities taken at the early stages of project development are based on false information and whether this may lead to the wrong project concepts being selected.

Suggested Citation

  • Morten Welde & James Odeck, 2017. "Cost escalations in the front-end of projects – empirical evidence from Norwegian road projects," Transport Reviews, Taylor & Francis Journals, vol. 37(5), pages 612-630, September.
  • Handle: RePEc:taf:transr:v:37:y:2017:i:5:p:612-630
    DOI: 10.1080/01441647.2016.1278285
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01441647.2016.1278285
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01441647.2016.1278285?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Eliasson, Jonas, 2023. "Cost overruns in Swedish infrastructure projects," MPRA Paper 120340, University Library of Munich, Germany.
    2. Odeck, James & Kjerkreit, Anne, 2019. "The accuracy of benefit-cost analyses (BCAs) in transportation: An ex-post evaluation of road projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 120(C), pages 277-294.
    3. Cavalieri, Marina & Cristaudo, Rossana & Guccio, Calogero, 2019. "On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects," Transport Policy, Elsevier, vol. 79(C), pages 21-36.
    4. Halse, Askill Harkjerr & Fridstrøm, Lasse, 2019. "Explaining low economic return on road investments. New evidence from Norway," MPRA Paper 94389, University Library of Munich, Germany.
    5. Flyvbjerg, Bent & Ansar, Atif & Budzier, Alexander & Buhl, Søren & Cantarelli, Chantal & Garbuio, Massimo & Glenting, Carsten & Holm, Mette Skamris & Lovallo, Dan & Lunn, Daniel & Molin, Eric & Rønnes, 2018. "Five things you should know about cost overrun," Transportation Research Part A: Policy and Practice, Elsevier, vol. 118(C), pages 174-190.
    6. James Odeck, 2019. "Variation in cost overruns of transportation projects: an econometric meta-regression analysis of studies reported in the literature," Transportation, Springer, vol. 46(4), pages 1345-1368, August.
    7. Love, Peter E.D. & Sing, Michael C.P. & Ika, Lavagnon A. & Newton, Sidney, 2019. "The cost performance of transportation projects: The fallacy of the Planning Fallacy account," Transportation Research Part A: Policy and Practice, Elsevier, vol. 122(C), pages 1-20.
    8. Bardal, Kjersti Granås, 2020. "Contradictory outcomes of cost-benefit analyses – Findings from Norwegian public-investment projects," Research in Transportation Economics, Elsevier, vol. 82(C).
    9. Love, Peter E.D. & Ika, Lavagnon A., 2021. "The ‘context’ of transport project cost performance: Insights from contract award to final construction costs," Research in Transportation Economics, Elsevier, vol. 90(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:transr:v:37:y:2017:i:5:p:612-630. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TTRV20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.