Explaining cost overruns in infrastructure projects: a new framework with applications to Sweden

Author

Listed:
  • Hans Lind
  • Fredrik Brunes

Abstract

The aim is to both develop a new theory-based framework for analysing cost overruns, and to use this for an empirical study of cost overruns in infrastructure projects in Sweden. The conceptual part is based on a literature review and the empirical part is primarily based on a questionnaire to project managers. The framework has a descriptive part comprising two dimensions: when, during the process, the cost overrun arose and what part of the cost function was responsible: change in the product, change in quantities of the inputs and change in price of inputs. The explanatory part is a development of Flyvbjerg's theories and identifies four possible explanations: political/strategic aspects, psychological aspects, competence-related aspects and bad luck. The result from the empirical study is that most cost overruns occur in the initiation and planning stages up to the final design and are related to design changes and increases in the amount of inputs needed because of technical and administrative problems. Of the explanatory factors, there is most support for lack of competence and optimism bias.

Suggested Citation

  • Hans Lind & Fredrik Brunes, 2015. "Explaining cost overruns in infrastructure projects: a new framework with applications to Sweden," Construction Management and Economics, Taylor & Francis Journals, vol. 33(7), pages 554-568, July.
  • Handle: RePEc:taf:conmgt:v:33:y:2015:i:7:p:554-568
    DOI: 10.1080/01446193.2015.1064983
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01446193.2015.1064983
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2015.1064983?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Eliasson, Jonas, 2023. "Cost overruns in Swedish infrastructure projects," MPRA Paper 120340, University Library of Munich, Germany.
    2. Edyta Plebankiewicz, 2018. "Model of Predicting Cost Overrun in Construction Projects," Sustainability, MDPI, vol. 10(12), pages 1-14, November.
    3. Edyta Plebankiewicz & Damian Wieczorek, 2020. "Prediction of Cost Overrun Risk in Construction Projects," Sustainability, MDPI, vol. 12(22), pages 1-15, November.
    4. Zangeneh, Pouya & McCabe, Brenda, 2022. "Modelling socio-technical risks of industrial megaprojects using Bayesian Networks and reference classes," Resources Policy, Elsevier, vol. 79(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:33:y:2015:i:7:p:554-568. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.