IDEAS home Printed from https://ideas.repec.org/p/hal/journl/hal-01997380.html
   My bibliography  Save this paper

The use of rush deliveries in periodic review assemble-to-order systems

Author

Listed:
  • Mohammed Hichame Benbitour

    (LGI - Laboratoire Génie Industriel - EA 2606 - CentraleSupélec)

  • Evren Sahin

    (LGI - Laboratoire Génie Industriel - EA 2606 - CentraleSupélec)

  • Yves Dallery

    (LGI - Laboratoire Génie Industriel - EA 2606 - CentraleSupélec)

Abstract

We calculate optimal safety stock in a periodic review (T,S) Assemble-to-Order system having multiple components and multiple finished goods. Customer orders for finished goods arrive according to independent Poisson processes, and cannot be neither backlogged nor lost. In case of potential component stock-out, the studied system uses rush deliveries from suppliers. For this setting, approximate expressions of the optimal safety stock that minimize the sum of inventory holding and rush ordering costs are developed. Exact optimal safety stocks are calculated using discrete event simulation, and compared numerically to the approximate expressions. The model is applied to a first-tier automotive supplier and yields to a significant reduction in terms of inventory holding and rush ordering costs. A sensitivity analysis on relevant system parameters such as components demand, assembly coefficients and unit rush ordering cost is conducted.

Suggested Citation

  • Mohammed Hichame Benbitour & Evren Sahin & Yves Dallery, 2019. "The use of rush deliveries in periodic review assemble-to-order systems," Post-Print hal-01997380, HAL.
  • Handle: RePEc:hal:journl:hal-01997380
    DOI: 10.1080/00207543.2018.1505059
    Note: View the original document on HAL open archive server: https://hal.science/hal-01997380
    as

    Download full text from publisher

    File URL: https://hal.science/hal-01997380/document
    Download Restriction: no

    File URL: https://libkey.io/10.1080/00207543.2018.1505059?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Karaarslan, A.G. & Kiesmüller, G.P. & de Kok, A.G., 2013. "Analysis of an assemble-to-order system with different review periods," International Journal of Production Economics, Elsevier, vol. 143(2), pages 335-341.
    2. Boysen, Nils & Emde, Simon & Hoeck, Michael & Kauderer, Markus, 2015. "Part logistics in the automotive industry: Decision problems, literature review and research agenda," European Journal of Operational Research, Elsevier, vol. 242(1), pages 107-120.
    3. George Tagaras & Dimitrios Vlachos, 2001. "A Periodic Review Inventory System with Emergency Replenishments," Management Science, INFORMS, vol. 47(3), pages 415-429, March.
    4. Hamed Jalali & Inneke Van Nieuwenhuyse, 2015. "Simulation optimization in inventory replenishment: a classification," IISE Transactions, Taylor & Francis Journals, vol. 47(11), pages 1217-1235, November.
    5. Xiao, Yongbo & Chen, Jian & Lee, Chung-Yee, 2010. "Optimal decisions for assemble-to-order systems with uncertain assembly capacity," International Journal of Production Economics, Elsevier, vol. 123(1), pages 155-165, January.
    6. Vlachos, Dimitrios & Tagaras, George, 2001. "An inventory system with two supply modes and capacity constraints," International Journal of Production Economics, Elsevier, vol. 72(1), pages 41-58, June.
    7. Ehsan Mardan & Mohsen Sadegh Amalnik & Masoud Rabbani, 2015. "An integrated emergency ordering and production planning optimization model with demand and yield uncertainty," International Journal of Production Research, Taylor & Francis Journals, vol. 53(20), pages 6023-6039, October.
    8. Boysen, Nils & Emde, Simon & Hoeck, Michael & Kauderer, Markus, 2015. "Part logistics in the automotive industry: Decision problems, literature review and research agenda," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 79443, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    9. Yalçin Akçay & Susan H. Xu, 2004. "Joint Inventory Replenishment and Component Allocation Optimization in an Assemble-to-Order System," Management Science, INFORMS, vol. 50(1), pages 99-116, January.
    10. Alvarez, E.M. & van der Heijden, M.C. & Zijm, W.H.M., 2013. "The selective use of emergency shipments for service-contract differentiation," International Journal of Production Economics, Elsevier, vol. 143(2), pages 518-526.
    11. Ke Fu & Vernon N. Hsu & Chung‐Yee Lee, 2011. "Approximation methods for the analysis of a multicomponent, multiproduct assemble‐to‐order system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(7), pages 685-704, October.
    12. Mohsen Elhafsi & Li Zhi & Herve Camus & Etienne Craye, 2015. "An assemble-to-order system with product and components demand with lost sales," International Journal of Production Research, Taylor & Francis Journals, vol. 53(3), pages 718-735, February.
    13. Meimei Zheng & Yan Shu & Kan Wu, 2015. "On optimal emergency orders with updated demand forecast and limited supply," International Journal of Production Research, Taylor & Francis Journals, vol. 53(12), pages 3692-3719, June.
    14. Atan, Zümbül & Ahmadi, Taher & Stegehuis, Clara & Kok, Ton de & Adan, Ivo, 2017. "Assemble-to-order systems: A review," European Journal of Operational Research, Elsevier, vol. 261(3), pages 866-879.
    15. Zied Jemai & M. Zied Babai & Y. Dallery, 2011. "Analysis of order-up-to-level inventory systems with compound Poisson demand," Post-Print hal-01672399, HAL.
    16. Zhao, Yao, 2009. "Analysis and evaluation of an Assemble-to-Order system with batch ordering policy and compound Poisson demand," European Journal of Operational Research, Elsevier, vol. 198(3), pages 800-809, November.
    17. Saif Benjaafar & Mohsen ElHafsi, 2006. "Production and Inventory Control of a Single Product Assemble-to-Order System with Multiple Customer Classes," Management Science, INFORMS, vol. 52(12), pages 1896-1912, December.
    18. Babai, M.Z. & Jemai, Z. & Dallery, Y., 2011. "Analysis of order-up-to-level inventory systems with compound Poisson demand," European Journal of Operational Research, Elsevier, vol. 210(3), pages 552-558, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
    2. Gonçalves, João N.C. & Sameiro Carvalho, M. & Cortez, Paulo, 2020. "Operations research models and methods for safety stock determination: A review," Operations Research Perspectives, Elsevier, vol. 7(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Atan, Zümbül & Ahmadi, Taher & Stegehuis, Clara & Kok, Ton de & Adan, Ivo, 2017. "Assemble-to-order systems: A review," European Journal of Operational Research, Elsevier, vol. 261(3), pages 866-879.
    2. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    3. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
    4. Lengu, D. & Syntetos, A.A. & Babai, M.Z., 2014. "Spare parts management: Linking distributional assumptions to demand classification," European Journal of Operational Research, Elsevier, vol. 235(3), pages 624-635.
    5. Tan, Ken Seng & Wei, Pengyu & Wei, Wei & Zhuang, Sheng Chao, 2020. "Optimal dynamic reinsurance policies under a generalized Denneberg’s absolute deviation principle," European Journal of Operational Research, Elsevier, vol. 282(1), pages 345-362.
    6. Quetschlich, Mathias & Moetz, André & Otto, Boris, 2021. "Optimisation model for multi-item multi-echelon supply chains with nested multi-level products," European Journal of Operational Research, Elsevier, vol. 290(1), pages 144-158.
    7. van Jaarsveld, W.L. & Dollevoet, T.A.B., 2011. "Spare parts inventory control for an aircraft component repair shop," Econometric Institute Research Papers EI2011-24, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    8. ElHafsi, Mohsen & Fang, Jianxin & Hamouda, Essia, 2020. "A novel decomposition-based method for solving general-product structure assemble-to-order systems," European Journal of Operational Research, Elsevier, vol. 286(1), pages 233-249.
    9. Gao, Chunyan & Shen, Houcai & Cheng, T.C.E., 2010. "Order-fulfillment performance analysis of an assemble-to-order system with unreliable machines," International Journal of Production Economics, Elsevier, vol. 126(2), pages 341-349, August.
    10. Karaarslan, Gönül A. & Atan, Zümbül & de Kok, Ton & Kiesmüller, Gudrun P., 2018. "Optimal and heuristic policies for assemble-to-order systems with different review periods," European Journal of Operational Research, Elsevier, vol. 271(1), pages 80-96.
    11. Kuschel, Torben & Bock, Stefan, 2016. "The weighted uncapacitated planned maintenance problem: Complexity and polyhedral properties," European Journal of Operational Research, Elsevier, vol. 250(3), pages 773-781.
    12. Laurent Lim, Lâm & Alpan, Gülgün & Penz, Bernard, 2014. "Reconciling sales and operations management with distant suppliers in the automotive industry: A simulation approach," International Journal of Production Economics, Elsevier, vol. 151(C), pages 20-36.
    13. Lijian Lu & Jing‐Sheng Song & Hanqin Zhang, 2015. "Optimal and asymptotically optimal policies for assemble‐to‐order n‐ and W‐systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(8), pages 617-645, December.
    14. Willem van Jaarsveld & Alan Scheller-Wolf, 2015. "Optimization of Industrial-Scale Assemble-to-Order Systems," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 544-560, August.
    15. Timo Gschwind & Stefan Irnich & Simon Emde & Christian Tilk, 2018. "Branch-Cut-and-Price for the Scheduling Deliveries with Time Windows in a Direct Shipping Network," Working Papers 1805, Gutenberg School of Management and Economics, Johannes Gutenberg-Universität Mainz.
    16. Baals, Julian & Emde, Simon & Turkensteen, Marcel, 2023. "Minimizing earliness-tardiness costs in supplier networks—A just-in-time truck routing problem," European Journal of Operational Research, Elsevier, vol. 306(2), pages 707-741.
    17. Meyer, Anne & Amberg, Boris, 2018. "Transport concept selection considering supplier milk runs – An integrated model and a case study from the automotive industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 113(C), pages 147-169.
    18. Xiao, Yongbo & Chen, Jian & Lee, Chung-Yee, 2010. "Optimal decisions for assemble-to-order systems with uncertain assembly capacity," International Journal of Production Economics, Elsevier, vol. 123(1), pages 155-165, January.
    19. Simon Emde, 2017. "Scheduling the replenishment of just-in-time supermarkets in assembly plants," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 321-345, January.
    20. Masood Fathi & Victoria Rodríguez & Dalila B.M.M. Fontes & Maria Jesus Alvarez, 2016. "A modified particle swarm optimisation algorithm to solve the part feeding problem at assembly lines," International Journal of Production Research, Taylor & Francis Journals, vol. 54(3), pages 878-893, February.

    More about this item

    Keywords

    inventory control; assemble-to-order; periodic review; rush orders; optimization;
    All these keywords.

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:journl:hal-01997380. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.