Cost overruns in Large-Scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Bent Flyvbjerg & Mette K. Skamris holm & Søren L. Buhl, 2003. "How common and how large are cost overruns in transport infrastructure projects?," Transport Reviews, Taylor & Francis Journals, vol. 23(1), pages 71-88, January.
- Flyvbjerg, Bent, 2005.
"Measuring inaccuracy in travel demand forecasting: methodological considerations regarding ramp up and sampling,"
Transportation Research Part A: Policy and Practice, Elsevier, vol. 39(6), pages 522-530, July.
- Bent Flyvbjerg, 2013. "Measuring Inaccuracy in Travel Demand Forecasting: Methodological Considerations Regarding Ramp Up and Sampling," Papers 1303.7401, arXiv.org.
- Mackie, Peter & Preston, John, 1998. "Twenty-one sources of error and bias in transport project appraisal," Transport Policy, Elsevier, vol. 5(1), pages 1-7, January.
- Daniel Kahneman & Amos Tversky, 2013.
"Prospect Theory: An Analysis of Decision Under Risk,"
World Scientific Book Chapters, in: Leonard C MacLean & William T Ziemba (ed.), HANDBOOK OF THE FUNDAMENTALS OF FINANCIAL DECISION MAKING Part I, chapter 6, pages 99-127,
World Scientific Publishing Co. Pte. Ltd..
- Kahneman, Daniel & Tversky, Amos, 1979. "Prospect Theory: An Analysis of Decision under Risk," Econometrica, Econometric Society, vol. 47(2), pages 263-291, March.
- Amos Tversky & Daniel Kahneman, 1979. "Prospect Theory: An Analysis of Decision under Risk," Levine's Working Paper Archive 7656, David K. Levine.
- Reichelt, Kimberly & Lyneis, James, 1999. "The dynamics of project performance: benchmarking the drivers of cost and schedule overrun," European Management Journal, Elsevier, vol. 17(2), pages 135-150, April.
- Trujillo, Lourdes & Quinet, Emile & Estache, Antonio, 2002.
"Dealing with demand forecasting games in transport privatization,"
Transport Policy, Elsevier, vol. 9(4), pages 325-334, October.
- Antonio Estache & Lourdes Trujillo & E. Quinet, 2002. "Dealing with Demand Forecasting Games in Transport Privatization," ULB Institutional Repository 2013/43981, ULB -- Universite Libre de Bruxelles.
- Arvan, Lanny & Leite, Antonio P. N., 1990. "Cost overruns in long term projects," International Journal of Industrial Organization, Elsevier, vol. 8(3), pages 443-467, September.
- Daniel Kahneman & Dan Lovallo, 1993. "Timid Choices and Bold Forecasts: A Cognitive Perspective on Risk Taking," Management Science, INFORMS, vol. 39(1), pages 17-31, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Zhang, Yijia & Cheng, Lu, 2023. "The role of transport infrastructure in economic growth: Empirical evidence in the UK," Transport Policy, Elsevier, vol. 133(C), pages 223-233.
- Joseph Sturm & Mashrur Chowdhury & Anne Dunning & Jennifer Ogle, 2011. "Analysis of cost estimation disclosure in environmental impact statements for surface transportation projects," Transportation, Springer, vol. 38(3), pages 525-544, May.
- Kirchherr, Julian & Ahrenshop, Mats-Philip & Charles, Katrina, 2019. "Resettlement lies: Suggestive evidence from 29 large dam projects," World Development, Elsevier, vol. 114(C), pages 208-219.
- Francisco Pinheiro Catalão & Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2023. "Public Sector Corruption and Accountability in Cost Deviations and Overruns of Public Projects," Public Organization Review, Springer, vol. 23(3), pages 1105-1126, September.
- Giuliano Marella & Valentina Antoniucci, 2019. "Time Overrun in Public Works—Evidence from North-East Italy," Sustainability, MDPI, vol. 11(24), pages 1-17, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Steininger, Bertram & Groth, Martin & Weber, Birgitte, 2020. "Cost overruns and delays in infrastructure projects: the case of Stuttgart 21," Working Paper Series 20/11, Royal Institute of Technology, Department of Real Estate and Construction Management & Banking and Finance.
- Petter Osmundsen & Kristin Helen Roll, 2016.
"Rig Rates and Drilling Speed: Reinforcing Effects,"
CESifo Working Paper Series
5895, CESifo.
- Osmundsen, Petter & Roll, Kristin Helen, 2016. "Rig rates and drilling speed: reinforcing effects," UiS Working Papers in Economics and Finance 2016/4, University of Stavanger.
- Øglend, Atle & Osmundsen, Petter & Lorentzen, Sindre, 2016.
"Cost Overrun at the Norwegian Continental Shelf: The element of surprise,"
UiS Working Papers in Economics and Finance
2016/3, University of Stavanger.
- Atle Oglend & Petter Osmundsen & Sindre Lorentzen, 2016. "Cost Overrun at the Norwegian Continental Shelf: The Element of Surprise," CESifo Working Paper Series 5886, CESifo.
- Salling, Kim Bang & Banister, David, 2009. "Assessment of large transport infrastructure projects: The CBA-DK model," Transportation Research Part A: Policy and Practice, Elsevier, vol. 43(9-10), pages 800-813, November.
- Barfod, Michael Bruhn & Salling, Kim Bang, 2015. "A new composite decision support framework for strategic and sustainable transport appraisals," Transportation Research Part A: Policy and Practice, Elsevier, vol. 72(C), pages 1-15.
- Bent Flyvbjerg & Eamonn Molloy, 2011. "Delusion, Deception and Corruption in Major Infrastructure Projects: Causes, Consequences and Cures," Chapters, in: Susan Rose-Ackerman & Tina Søreide (ed.), International Handbook on the Economics of Corruption, Volume Two, chapter 3, Edward Elgar Publishing.
- Huimin Liu & Canhui Jiang & Yan Liu & Marcel Hertogh & Xue Lyu, 2018. "Optimism Bias Evaluation and Decision-Making Risk Forecast on Bridge Project Cost Based on Reference Class Forecasting: Evidence from China," Sustainability, MDPI, vol. 10(11), pages 1-29, October.
- Mouter, Niek & Annema, Jan Anne & van Wee, Bert, 2013. "Ranking the substantive problems in the Dutch Cost–Benefit Analysis practice," Transportation Research Part A: Policy and Practice, Elsevier, vol. 49(C), pages 241-255.
- Daniel Fonseca Costa & Francisval Carvalho & Bruno César Moreira & José Willer Prado, 2017. "Bibliometric analysis on the association between behavioral finance and decision making with cognitive biases such as overconfidence, anchoring effect and confirmation bias," Scientometrics, Springer;Akadémiai Kiadó, vol. 111(3), pages 1775-1799, June.
- Botond Kőszegi & Matthew Rabin, 2006.
"A Model of Reference-Dependent Preferences,"
The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 121(4), pages 1133-1165.
- Botond Koszegi & Matthew Rabin, 2004. "A Model of Reference-Dependent Preferences," Method and Hist of Econ Thought 0407001, University Library of Munich, Germany.
- Koszegi, Botond & Rabin, Matthew, 2004. "A Model of Reference-Dependent Preferences," Department of Economics, Working Paper Series qt0w82b6nm, Department of Economics, Institute for Business and Economic Research, UC Berkeley.
- Botond Koszegi & Matthew Rabin, 2005. "A Model of Reference-Dependent Preferences," Levine's Bibliography 784828000000000341, UCLA Department of Economics.
- T. K. Das & Bing-Sheng Teng, 1998. "Time and Entrepreneurial Risk Behavior," Entrepreneurship Theory and Practice, , vol. 22(2), pages 69-88, January.
- Uri Gneezy & Jan Potters, 1997.
"An Experiment on Risk Taking and Evaluation Periods,"
The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 112(2), pages 631-645.
- Gneezy, U. & Potters, J.J.M., 1996. "An experiment on risk taking and evaluation periods," Other publications TiSEM e48d1f57-1bac-4a83-8772-c, Tilburg University, School of Economics and Management.
- Gneezy, U. & Potters, J.J.M., 1997. "An experiment on risk taking and evaluation periods," Other publications TiSEM da6ba1bf-e15c-41b2-ae95-c, Tilburg University, School of Economics and Management.
- Gneezy, U. & Potters, J.J.M., 1996. "An experiment on risk taking and evaluation periods," Discussion Paper 1996-61, Tilburg University, Center for Economic Research.
- Elie Matta & Jean McGuire, 2008. "Too Risky to Hold? The Effect of Downside Risk, Accumulated Equity Wealth, and Firm Performance on CEO Equity Reduction," Organization Science, INFORMS, vol. 19(4), pages 567-580, August.
- Love, Peter E.D. & Ika, Lavagnon A. & Ahiaga-Dagbui, Dominic D., 2019. "On de-bunking ‘fake news’ in a post truth era: Why does the Planning Fallacy explanation for cost overruns fall short?," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 397-408.
- Hugo Priemus & Bert van Wee (ed.), 2013. "International Handbook on Mega-Projects," Books, Edward Elgar Publishing, number 14791.
- Bent Flyvbjerg & Alexander Budzier, 2018. "Report for the Edinburgh Tram Inquiry," Papers 1805.12106, arXiv.org.
- Meissner, Philip & Wulf, Torsten, 2014. "Antecendents and effects of decision comprehensiveness: The role of decision quality and perceived uncertainty," European Management Journal, Elsevier, vol. 32(4), pages 625-635.
- Barberis, Nicholas & Huang, Ming, 2009. "Preferences with frames: A new utility specification that allows for the framing of risks," Journal of Economic Dynamics and Control, Elsevier, vol. 33(8), pages 1555-1576, August.
- Steul, Martina, 2006. "Does the framing of investment portfolios influence risk-taking behavior? Some experimental results," Journal of Economic Psychology, Elsevier, vol. 27(4), pages 557-570, August.
- Alexander K. Koch & Julia Nafziger, 2019.
"Correlates of Narrow Bracketing,"
Scandinavian Journal of Economics, Wiley Blackwell, vol. 121(4), pages 1441-1472, October.
- Alexander K. Koch & Julia Nafziger, 2016. "Correlates of Narrow Bracketing," Economics Working Papers 2016-01, Department of Economics and Business Economics, Aarhus University.
More about this item
NEP fields
This paper has been announced in the following NEP Reports:- NEP-NPS-2013-07-15 (Nonprofit and Public Sector)
- NEP-PPM-2013-07-15 (Project, Program and Portfolio Management)
- NEP-TRE-2013-07-15 (Transport Economics)
- NEP-URE-2013-07-15 (Urban and Real Estate Economics)
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:arx:papers:1307.2176. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: arXiv administrators (email available below). General contact details of provider: http://arxiv.org/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.