Project Management with Dynamic Scheduling
Author
Abstract
Individual chapters are listed in the "Chapters" tab
Suggested Citation
DOI: 10.1007/978-3-642-25175-7
Download full text from publisher
To our knowledge, this item is not available for download. To find whether it is available, there are three options:1. Check below whether another version of this item is available online.
2. Check on the provider's web page whether it is in fact available.
3. Perform a search for a similarly titled item that would be available.
Other versions of this item:
- Mario Vanhoucke, 2013. "Project Management with Dynamic Scheduling," Springer Books, Springer, edition 2, number 978-3-642-40438-2, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Mahmoudi, Amin & Javed, Saad Ahmed, 2022. "Performance Evaluation of Construction Sub‐contractors using Ordinal Priority Approach," Evaluation and Program Planning, Elsevier, vol. 91(C).
- P. Velumani & N. V. N. Nampoothiri & M. Urbański, 2021. "A Comparative Study of Models for the Construction Duration Prediction in Highway Road Projects of India," Sustainability, MDPI, vol. 13(8), pages 1-13, April.
- Bordley, Robert F. & Keisler, Jeffrey M. & Logan, Tom M., 2019. "Managing projects with uncertain deadlines," European Journal of Operational Research, Elsevier, vol. 274(1), pages 291-302.
- Colin, Jeroen & Vanhoucke, Mario, 2014. "Setting tolerance limits for statistical project control using earned value management," Omega, Elsevier, vol. 49(C), pages 107-122.
- Nikolai Krivulin, 2020. "Tropical optimization technique in bi-objective project scheduling under temporal constraints," Computational Management Science, Springer, vol. 17(3), pages 437-464, October.
- Hübner, Felix & Möller, Sven & Schultmann, Frank, 2018. "Entwicklung eines Expertensystems für die Planung kerntechnischer Rückbauprojekte," Working Paper Series in Production and Energy 28, Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP).
- She, Bingling & Chen, Bo & Hall, Nicholas G., 2021. "Buffer sizing in critical chain project management by network decomposition," Omega, Elsevier, vol. 102(C).
- Xuejun Hu & Jianjiang Wang & Kaijun Leng, 2019. "The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 36(03), pages 1-22, June.
- Xuejun Hu & Erik Demeulemeester & Nanfang Cui & Jianjiang Wang & Wendi Tian, 2017. "Improved critical chain buffer management framework considering resource costs and schedule stability," Flexible Services and Manufacturing Journal, Springer, vol. 29(2), pages 159-183, June.
- Gehring, Marco & Winkler, Franziska & Volk, Rebekka & Schultmann, Frank, 2021. "Projektmanagementsoftware und Scheduling: Aktuelle Bestandsaufnahme von Funktionalitäten und Identifikation von Potenzialen," Working Paper Series in Production and Energy 60, Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP).
- Nikolai Krivulin, 2017. "Tropical optimization problems with application to project scheduling with minimum makespan," Annals of Operations Research, Springer, vol. 256(1), pages 75-92, September.
- Caputo, Antonio C. & Kalemi, Bledar & Paolacci, Fabrizio & Corritore, Daniele, 2020. "Computing resilience of process plants under Na-Tech events: Methodology and application to sesmic loading scenarios," Reliability Engineering and System Safety, Elsevier, vol. 195(C).
- Kerkhove, L.-P. & Vanhoucke, M., 2017. "Optimised scheduling for weather sensitive offshore construction projects," Omega, Elsevier, vol. 66(PA), pages 58-78.
Book Chapters
The following chapters of this book are listed in IDEAS- Mario Vanhoucke, 2012. "Introduction," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 1-8, Springer.
- Mario Vanhoucke, 2012. "The PERT/CPM Technique," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 11-35, Springer.
- Mario Vanhoucke, 2012. "The Critical Path Method," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 37-56, Springer.
- Mario Vanhoucke, 2012. "The VMW Project," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 57-77, Springer.
- Mario Vanhoucke, 2012. "Schedule Risk Analysis," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 79-98, Springer.
- Mario Vanhoucke, 2012. "The Mutum-Paraná II Bridge Project (A)," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 99-104, Springer.
- Mario Vanhoucke, 2012. "Resource-Constrained Project Scheduling," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 107-137, Springer.
- Mario Vanhoucke, 2012. "Resource-Constrained Scheduling Extensions," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 139-172, Springer.
- Mario Vanhoucke, 2012. "The Westerschelde Tunnel Project," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 173-183, Springer.
- Mario Vanhoucke, 2012. "Critical Chain/Buffer Management," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 185-206, Springer.
- Mario Vanhoucke, 2012. "The Mutum-Paraná II Bridge Project (B)," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 207-211, Springer.
- Mario Vanhoucke, 2012. "Earned Value Management," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 215-238, Springer.
- Mario Vanhoucke, 2012. "Advanced Topics," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 239-258, Springer.
- Mario Vanhoucke, 2012. "The Mutum-Paraná II Bridge Project (C)," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 259-269, Springer.
- Mario Vanhoucke, 2012. "Dynamic Scheduling with ProTrack," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 273-282, Springer.
- Mario Vanhoucke, 2012. "Conclusions," Springer Books, in: Project Management with Dynamic Scheduling, edition 127, chapter 0, pages 285-293, Springer.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:sprbok:978-3-642-25175-7. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.