IDEAS home Printed from https://ideas.repec.org/b/spr/sprbok/978-3-540-29879-3.html
   My bibliography  Save this book

Introduction to Computational Optimization Models for Production Planning in a Supply Chain

Author

Listed:
  • Stefan Voß

    (Universität Hamburg)

  • David L. Woodruff

    (UC Davis)

Abstract

No abstract is available for this item.

Individual chapters are listed in the "Chapters" tab

Suggested Citation

  • Stefan Voß & David L. Woodruff, 2006. "Introduction to Computational Optimization Models for Production Planning in a Supply Chain," Springer Books, Springer, edition 0, number 978-3-540-29879-3, June.
  • Handle: RePEc:spr:sprbok:978-3-540-29879-3
    DOI: 10.1007/3-540-29879-7
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Keshvari, Abolfazl & Kuosmanen, Timo, 2013. "Stochastic non-convex envelopment of data: Applying isotonic regression to frontier estimation," European Journal of Operational Research, Elsevier, vol. 231(2), pages 481-491.
    2. Missbauer, Hubert, 2011. "Order release planning with clearing functions: A queueing-theoretical analysis of the clearing function concept," International Journal of Production Economics, Elsevier, vol. 131(1), pages 399-406, May.
    3. de Kruijff, Joost T. & Hurkens, Cor A.J. & de Kok, Ton G., 2018. "Integer programming models for mid-term production planning for high-tech low-volume supply chains," European Journal of Operational Research, Elsevier, vol. 269(3), pages 984-997.
    4. Fan, Yingjie & Schwartz, Frank & Voß, Stefan, 2017. "Flexible supply chain planning based on variable transportation modes," International Journal of Production Economics, Elsevier, vol. 183(PC), pages 654-666.
    5. Ge, Liping & Voß, Stefan, 2009. "ERP application in China: An overview," International Journal of Production Economics, Elsevier, vol. 122(1), pages 501-507, November.
    6. Fowler, John W. & Mönch, Lars, 2022. "A survey of scheduling with parallel batch (p-batch) processing," European Journal of Operational Research, Elsevier, vol. 298(1), pages 1-24.
    7. Andrea Raiconi & Julia Pahl & Monica Gentili & Stefan Voß & Raffaele Cerulli, 2017. "Tactical Production and Lot Size Planning with Lifetime Constraints: A Comparison of Model Formulations," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(05), pages 1-24, October.
    8. Truong Hong Trinh, 2017. "The Dynamic Programming Models for Inventory Control System with Time-varying Demand," Business and Economic Research, Macrothink Institute, vol. 7(1), pages 128-138, June.
    9. Körpeoglu, Ersin & Yaman, Hande & Selim Aktürk, M., 2011. "A multi-stage stochastic programming approach in master production scheduling," European Journal of Operational Research, Elsevier, vol. 213(1), pages 166-179, August.
    10. Missbauer, Hubert, 2009. "Models of the transient behaviour of production units to optimize the aggregate material flow," International Journal of Production Economics, Elsevier, vol. 118(2), pages 387-397, April.
    11. Corominas, Albert & Lusa, Amaia & Olivella, Jordi, 2012. "A detailed workforce planning model including non-linear dependence of capacity on the size of the staff and cash management," European Journal of Operational Research, Elsevier, vol. 216(2), pages 445-458.
    12. Gopalswamy, Karthick & Uzsoy, Reha, 2021. "Conic programming models for production planning with clearing functions: Formulations and duality," European Journal of Operational Research, Elsevier, vol. 292(3), pages 953-966.
    13. Ítalo Ruan Barbosa de Aquino & Josenildo Ferreira da Silva Junior & Patricia Guarnieri & Lucio Camara e Silva, 2020. "The Proposition of a Mathematical Model for the Location of Electrical and Electronic Waste Collection Points," Sustainability, MDPI, vol. 13(1), pages 1-15, December.
    14. Staeblein, Thomas & Aoki, Katsuki, 2015. "Planning and scheduling in the automotive industry: A comparison of industrial practice at German and Japanese makers," International Journal of Production Economics, Elsevier, vol. 162(C), pages 258-272.
    15. Slama, Ilhem & Ben-Ammar, Oussama & Thevenin, Simon & Dolgui, Alexandre & Masmoudi, Faouzi, 2022. "Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1183-1198.
    16. R Fildes & B Kingsman, 2011. "Incorporating demand uncertainty and forecast error in supply chain planning models," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(3), pages 483-500, March.
    17. Alexander Biele & Lars Mönch, 2018. "Hybrid approaches to optimize mixed-model assembly lines in low-volume manufacturing," Journal of Heuristics, Springer, vol. 24(1), pages 49-81, February.
    18. Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.

    Book Chapters

    The following chapters of this book are listed in IDEAS

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:sprbok:978-3-540-29879-3. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.