IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v55y2017i6p1531-1548.html
   My bibliography  Save this article

Scheduling two identical parallel machines with preparation constraints

Author

Listed:
  • Wafaa Labbi
  • Mourad Boudhar
  • Ammar Oulamara

Abstract

In this paper, we consider the problem of scheduling a set of n jobs on two identical machines with preparation constraints. Each job requires before its execution a set of resources and a non-negligible preparation time. The objective is to minimise the makespan. This problem is NP-hard. We prove the NP-hardness of two specific cases where in the first case preparation times take only three values, whereas in the second case preparation times and the release dates take only two values, respectively. Then, we present some special cases and heuristic algorithms along with an experimental study.

Suggested Citation

  • Wafaa Labbi & Mourad Boudhar & Ammar Oulamara, 2017. "Scheduling two identical parallel machines with preparation constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 55(6), pages 1531-1548, March.
  • Handle: RePEc:taf:tprsxx:v:55:y:2017:i:6:p:1531-1548
    DOI: 10.1080/00207543.2014.978032
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2014.978032
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2014.978032?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Vinod K. Sahney, 1972. "Single-Server, Two-Machine Sequencing with Switching Time," Operations Research, INFORMS, vol. 20(1), pages 24-36, February.
    2. Celia A. Glass & Yakov M. Shafransky & Vitaly A. Strusevich, 2000. "Scheduling for parallel dedicated machines with a single server," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(4), pages 304-328, June.
    3. Kellerer, H. & Strusevich, V. A., 2003. "Scheduling parallel dedicated machines under a single non-shared resource," European Journal of Operational Research, Elsevier, vol. 147(2), pages 345-364, June.
    4. Kogan, Konstantin, 2006. "Optimal scheduling of parallel machines with constrained resources," European Journal of Operational Research, Elsevier, vol. 170(3), pages 771-787, May.
    5. de Werra, D., 1988. "On the two-phase method for preemptive scheduling," European Journal of Operational Research, Elsevier, vol. 37(2), pages 227-235, November.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ammar Oulamara & Djamal Rebaine & Mehdi Serairi, 2013. "Scheduling the two-machine open shop problem under resource constraints for setting the jobs," Annals of Operations Research, Springer, vol. 211(1), pages 333-356, December.
    2. Andrea Sironi & Cristiano Zazzara, 2003. "The Basel Committee proposals for a new capital accord: implications for Italian banks," Review of Financial Economics, John Wiley & Sons, vol. 12(1), pages 99-126.
    3. Baptiste, Pierre & Rebaine, Djamal & Zouba, Mohammed, 2017. "FPTAS for the two identical parallel machine problem with a single operator under the free changing mode," European Journal of Operational Research, Elsevier, vol. 256(1), pages 55-61.
    4. Edis, Emrah B. & Oguz, Ceyda & Ozkarahan, Irem, 2013. "Parallel machine scheduling with additional resources: Notation, classification, models and solution methods," European Journal of Operational Research, Elsevier, vol. 230(3), pages 449-463.
    5. Fanjul-Peyro, Luis & Perea, Federico & Ruiz, Rubén, 2017. "Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources," European Journal of Operational Research, Elsevier, vol. 260(2), pages 482-493.
    6. Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
    7. Fang, Kan & Wang, Shijin & Pinedo, Michael L. & Chen, Lin & Chu, Feng, 2021. "A combinatorial Benders decomposition algorithm for parallel machine scheduling with working-time restrictions," European Journal of Operational Research, Elsevier, vol. 291(1), pages 128-146.
    8. Rachid Benmansour & Oliver Braun & Saïd Hanafi, 2019. "The single-processor scheduling problem with time restrictions: complexity and related problems," Journal of Scheduling, Springer, vol. 22(4), pages 465-471, August.
    9. David Füßler & Stefan Fedtke & Nils Boysen, 2019. "The cafeteria problem: order sequencing and picker routing in on-the-line picking systems," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(3), pages 727-756, September.
    10. Jun-Ho Lee & Hoon Jang, 2019. "Uniform Parallel Machine Scheduling with Dedicated Machines, Job Splitting and Setup Resources," Sustainability, MDPI, vol. 11(24), pages 1-23, December.
    11. Fleszar, Krzysztof & Hindi, Khalil S., 2018. "Algorithms for the unrelated parallel machine scheduling problem with a resource constraint," European Journal of Operational Research, Elsevier, vol. 271(3), pages 839-848.
    12. Agnetis, Alessandro & Kellerer, Hans & Nicosia, Gaia & Pacifici, Andrea, 2012. "Parallel dedicated machines scheduling with chain precedence constraints," European Journal of Operational Research, Elsevier, vol. 221(2), pages 296-305.
    13. Grigoriev, A. & Sviridenko, M. & Uetz, M.J., 2004. "Unrelated parallel machine scheduling with resource dependent processing times," Research Memorandum 033, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
    14. Figielska, Ewa, 2014. "A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages," European Journal of Operational Research, Elsevier, vol. 236(2), pages 433-444.
    15. Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
    16. Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
    17. Lushchakova, Irina N. & Strusevich, Vitaly A., 2010. "Scheduling incompatible tasks on two machines," European Journal of Operational Research, Elsevier, vol. 200(2), pages 334-346, January.
    18. Drótos, Márton & Kis, Tamás, 2011. "Resource leveling in a machine environment," European Journal of Operational Research, Elsevier, vol. 212(1), pages 12-21, July.
    19. T.C.E. Cheng & Svetlana A. Kravchenko & Bertrand M. T. Lin, 2019. "Server scheduling on parallel dedicated machines with fixed job sequences," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(4), pages 321-332, June.
    20. Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:55:y:2017:i:6:p:1531-1548. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.