IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v55y2017i13p3766-3787.html
   My bibliography  Save this article

Set-up and production planning in hybrid manufacturing–remanufacturing systems with large returns

Author

Listed:
  • Vladimir Polotski
  • Jean-Pierre Kenne
  • Ali Gharbi

Abstract

Hybrid systems that use both raw materials and returned products in the production process are considered. The system contains one facility, and undergoes set-ups each time it switches between two production modes. In particular, we address systems engaged mainly in remanufacturing and having a large percentage of return. This situation is encountered in companies with mature remanufacturing channels. The targeted application area is comprised of hybrid systems that uses leasing as a business model with manufacturing serving to attenuate return uncertainty. To evaluate the system performance, we take into account manufacturing and remanufacturing costs, holding costs in serviceable and return inventories, backlog and set-up costs. Our analysis of hybrid systems with high return levels reveals features that are peculiar to such systems and that differentiate them from systems with lower return rates. We first present analytical solutions for optimal production and set-up schedule, and determine the possible cycle shapes for reliable systems. Optimal policies contain intervals of manufacturing and remanufacturing at maximal rate, and intervals of on-demand and on-return remanufacturing. Failure-prone systems are studied next, using the formalism of stochastic dynamic programming. Optimal policies give rise to the trajectories converging to the patterns similar to the analytically calculated cycles.

Suggested Citation

  • Vladimir Polotski & Jean-Pierre Kenne & Ali Gharbi, 2017. "Set-up and production planning in hybrid manufacturing–remanufacturing systems with large returns," International Journal of Production Research, Taylor & Francis Journals, vol. 55(13), pages 3766-3787, July.
  • Handle: RePEc:taf:tprsxx:v:55:y:2017:i:13:p:3766-3787
    DOI: 10.1080/00207543.2017.1293863
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2017.1293863
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2017.1293863?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. N. Srivatsan & Yves Dallery, 1998. "Partial Characterization of Optimal Hedging Point Policies in Unreliable Two-Part-Type Manufacturing Systems," Operations Research, INFORMS, vol. 46(1), pages 36-45, February.
    2. Bulmuş, Serra Caner & Zhu, Stuart X. & Teunter, Ruud, 2013. "Capacity and production decisions under a remanufacturing strategy," International Journal of Production Economics, Elsevier, vol. 145(1), pages 359-370.
    3. Erwin van der Laan & Marc Salomon & Rommert Dekker & Luk Van Wassenhove, 1999. "Inventory Control in Hybrid Systems with Remanufacturing," Management Science, INFORMS, vol. 45(5), pages 733-747, May.
    4. Eugene Khmelnitsky & Ernst Presman & Suresh Sethi, 2011. "Optimal production control of a failure-prone machine," Annals of Operations Research, Springer, vol. 182(1), pages 67-86, January.
    5. Kenné, Jean-Pierre & Dejax, Pierre & Gharbi, Ali, 2012. "Production planning of a hybrid manufacturing–remanufacturing system under uncertainty within a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 135(1), pages 81-93.
    6. Polotski, Vladimir & Kenne, Jean-Pierre & Gharbi, Ali, 2017. "Production and setup policy optimization for hybrid manufacturing–remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 322-333.
    7. Cai, Xiaoqiang & Lai, Minghui & Li, Xiang & Li, Yongjian & Wu, Xianyi, 2014. "Optimal acquisition and production policy in a hybrid manufacturing/remanufacturing system with core acquisition at different quality levels," European Journal of Operational Research, Elsevier, vol. 233(2), pages 374-382.
    8. Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
    9. Flapper, Simme Douwe & Gayon, Jean-Philippe & Lim, Lâm Laurent, 2014. "On the optimal control of manufacturing and remanufacturing activities with a single shared server," European Journal of Operational Research, Elsevier, vol. 234(1), pages 86-98.
    10. Kiesmuller, Gudrun P. & Scherer, Carsten W., 2003. "Computational issues in a stochastic finite horizon one product recovery inventory model," European Journal of Operational Research, Elsevier, vol. 146(3), pages 553-579, May.
    11. Vercraene, Samuel & Gayon, Jean-Philippe & Flapper, Simme Douwe, 2014. "Coordination of manufacturing, remanufacturing and returns acceptance in hybrid manufacturing/remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 148(C), pages 62-70.
    12. Teunter, Ruud & Tang, Ou & Kaparis, Konstantinos, 2009. "Heuristics for the economic lot scheduling problem with returns," International Journal of Production Economics, Elsevier, vol. 118(1), pages 323-330, March.
    13. M. Assid & A. Gharbi & A. Hajji, 2015. "Joint production, setup and preventive maintenance policies of unreliable two-product manufacturing systems," International Journal of Production Research, Taylor & Francis Journals, vol. 53(15), pages 4668-4683, August.
    14. Vladimir Polotski & Jean-Pierre Kenné & Ali Gharbi, 2015. "Failure-prone manufacturing systems with setups: feasibility and optimality under various hypotheses about perturbations and setup interplay," International Journal of Mathematics in Operational Research, Inderscience Enterprises Ltd, vol. 7(6), pages 681-705.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Polotski, V. & Kenne, J.-P. & Gharbi, A., 2019. "Joint production and maintenance optimization in flexible hybrid Manufacturing–Remanufacturing systems under age-dependent deterioration," International Journal of Production Economics, Elsevier, vol. 216(C), pages 239-254.
    2. Assid, M. & Gharbi, A. & Hajji, A., 2020. "Production control of failure-prone manufacturing-remanufacturing systems using mixed dedicated and shared facilities," International Journal of Production Economics, Elsevier, vol. 224(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Polotski, Vladimir & Kenne, Jean-Pierre & Gharbi, Ali, 2017. "Production and setup policy optimization for hybrid manufacturing–remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 322-333.
    2. Assid, M. & Gharbi, A. & Hajji, A., 2020. "Production control of failure-prone manufacturing-remanufacturing systems using mixed dedicated and shared facilities," International Journal of Production Economics, Elsevier, vol. 224(C).
    3. Polotski, V. & Kenne, J.-P. & Gharbi, A., 2019. "Joint production and maintenance optimization in flexible hybrid Manufacturing–Remanufacturing systems under age-dependent deterioration," International Journal of Production Economics, Elsevier, vol. 216(C), pages 239-254.
    4. Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
    5. Shuihua Han & Weina Ma & Ling Zhao & Xuelian Zhang & Ming K. Lim & Shuangyuan Yang & Stephen Leung, 2016. "A robust optimisation model for hybrid remanufacturing and manufacturing systems under uncertain return quality and market demand," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5056-5072, September.
    6. Rafael Diaz & Erika Marsillac, 2017. "Evaluating strategic remanufacturing supply chain decisions," International Journal of Production Research, Taylor & Francis Journals, vol. 55(9), pages 2522-2539, May.
    7. Gregory A. DeCroix, 2006. "Optimal Policy for a Multiechelon Inventory System with Remanufacturing," Operations Research, INFORMS, vol. 54(3), pages 532-543, June.
    8. Liao, Haolan & Zhang, Qingyu & Shen, Neng & Nie, Yongyou & Li, Lu, 2021. "Coordination between forward and reverse production streams for maximum profitability," Omega, Elsevier, vol. 104(C).
    9. Ahiska, S. Sebnem & King, Russell E., 2010. "Life cycle inventory policy characterizations for a single-product recoverable system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 51-61, March.
    10. Sebnem Ahiska, S. & King, Russell E., 2010. "Inventory optimization in a one product recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 11-19, March.
    11. Sean X. Zhou & Zhijie Tao & Xiuli Chao, 2011. "Optimal Control of Inventory Systems with Multiple Types of Remanufacturable Products," Manufacturing & Service Operations Management, INFORMS, vol. 13(1), pages 20-34, March.
    12. Kim, Eungab & Saghafian, Soroush & Van Oyen, Mark P., 2013. "Joint control of production, remanufacturing, and disposal activities in a hybrid manufacturing–remanufacturing system," European Journal of Operational Research, Elsevier, vol. 231(2), pages 337-348.
    13. Gu, Wenjun & Chhajed, Dilip & Petruzzi, Nicholas C. & Yalabik, Baris, 2015. "Quality design and environmental implications of green consumerism in remanufacturing," International Journal of Production Economics, Elsevier, vol. 162(C), pages 55-69.
    14. Liu, Wenjie & Liu, Wei & Shen, Ningning & Xu, Zhitao & Xie, Naiming & Chen, Jian & Zhou, Huiyu, 2022. "Pricing and collection decisions of a closed-loop supply chain with fuzzy demand," International Journal of Production Economics, Elsevier, vol. 245(C).
    15. Kilic, Onur A. & Tunc, Huseyin & Tarim, S. Armagan, 2018. "Heuristic policies for the stochastic economic lot sizing problem with remanufacturing under service level constraints," European Journal of Operational Research, Elsevier, vol. 267(3), pages 1102-1109.
    16. Feng, Yan & Viswanathan, S., 2014. "Heuristics with guaranteed performance bounds for a manufacturing system with product recovery," European Journal of Operational Research, Elsevier, vol. 232(2), pages 322-329.
    17. van der Laan, Erwin, 2003. "An NPV and AC analysis of a stochastic inventory system with joint manufacturing and remanufacturing," International Journal of Production Economics, Elsevier, vol. 81(1), pages 317-331, January.
    18. repec:grz:wpsses:2013-01 is not listed on IDEAS
    19. Zhu, Xiaoxi & Wang, Miaomiao & Chen, Guofu & Chen, Xiaoshan, 2016. "The effect of implementing trade-in strategy on duopoly competition," European Journal of Operational Research, Elsevier, vol. 248(3), pages 856-868.
    20. Bulmus, Serra Caner & Zhu, Stuart X. & Teunter, Ruud, 2014. "Competition for cores in remanufacturing," European Journal of Operational Research, Elsevier, vol. 233(1), pages 105-113.
    21. Xiting Gong & Xiuli Chao, 2013. "Technical Note---Optimal Control Policy for Capacitated Inventory Systems with Remanufacturing," Operations Research, INFORMS, vol. 61(3), pages 603-611, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:55:y:2017:i:13:p:3766-3787. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.