Production and setup policy optimization for hybrid manufacturing–remanufacturing systems
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2016.06.026
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Dobos, Imre, 2003. "Optimal production-inventory strategies for a HMMS-type reverse logistics system," International Journal of Production Economics, Elsevier, vol. 81(1), pages 351-360, January.
- Marisa P. Brito & Rommert Dekker & Simme Douwe P. Flapper, 2005.
"Reverse Logistics: A Review of Case Studies,"
Lecture Notes in Economics and Mathematical Systems, in: Bernhard Fleischmann & Andreas Klose (ed.), Distribution Logistics, pages 243-281,
Springer.
- de Brito, M.P. & Dekker, R. & Flapper, S.D.P., 2003. "Reverse Logistics - a review of case studies," ERIM Report Series Research in Management ERS-2003-012-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Jun Yang & Houmina Yan & M.I. Taksar, 2000. "Optimal Production and Setup Scheduling: A One-Machine, Two-Product System," Annals of Operations Research, Springer, vol. 98(1), pages 291-311, December.
- Nenes, George & Panagiotidou, Sofia & Dekker, Rommert, 2010. "Inventory control policies for inspection and remanufacturing of returns: A case study," International Journal of Production Economics, Elsevier, vol. 125(2), pages 300-312, June.
- Erwin van der Laan & Marc Salomon & Rommert Dekker & Luk Van Wassenhove, 1999. "Inventory Control in Hybrid Systems with Remanufacturing," Management Science, INFORMS, vol. 45(5), pages 733-747, May.
- Kenné, Jean-Pierre & Dejax, Pierre & Gharbi, Ali, 2012. "Production planning of a hybrid manufacturing–remanufacturing system under uncertainty within a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 135(1), pages 81-93.
- Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
- Flapper, Simme Douwe & Gayon, Jean-Philippe & Lim, Lâm Laurent, 2014. "On the optimal control of manufacturing and remanufacturing activities with a single shared server," European Journal of Operational Research, Elsevier, vol. 234(1), pages 86-98.
- Kiesmuller, Gudrun P. & Scherer, Carsten W., 2003. "Computational issues in a stochastic finite horizon one product recovery inventory model," European Journal of Operational Research, Elsevier, vol. 146(3), pages 553-579, May.
- Teunter, Ruud & Tang, Ou & Kaparis, Konstantinos, 2009. "Heuristics for the economic lot scheduling problem with returns," International Journal of Production Economics, Elsevier, vol. 118(1), pages 323-330, March.
- M. Assid & A. Gharbi & A. Hajji, 2015. "Joint production, setup and preventive maintenance policies of unreliable two-product manufacturing systems," International Journal of Production Research, Taylor & Francis Journals, vol. 53(15), pages 4668-4683, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Chen, Yuyu & Li, Bangyi & Zhang, Guoqing & Bai, Qingguo, 2020. "Quantity and collection decisions of the remanufacturing enterprise under both the take-back and carbon emission capacity regulations," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 141(C).
- Vladimir Polotski & Jean-Pierre Kenne & Ali Gharbi, 2017. "Set-up and production planning in hybrid manufacturing–remanufacturing systems with large returns," International Journal of Production Research, Taylor & Francis Journals, vol. 55(13), pages 3766-3787, July.
- Chen, Wenyi & Kucukyazici, Beste & Saenz, Maria Jesus, 2019. "On the joint dynamics of the economic and environmental performances for collective take-back systems," International Journal of Production Economics, Elsevier, vol. 218(C), pages 228-244.
- Yanting Huang & Zongjun Wang, 2017. "Dual-Recycling Channel Decision in a Closed-Loop Supply Chain with Cost Disruptions," Sustainability, MDPI, vol. 9(11), pages 1-28, November.
- Assid, M. & Gharbi, A. & Hajji, A., 2020. "Production control of failure-prone manufacturing-remanufacturing systems using mixed dedicated and shared facilities," International Journal of Production Economics, Elsevier, vol. 224(C).
- Scheller, Christian & Schmidt, Kerstin & Spengler, Thomas S., 2023. "Effects of network structures on the production planning in closed-loop supply chains – A case study based analysis for lithium-ion batteries in Europe," International Journal of Production Economics, Elsevier, vol. 262(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Vladimir Polotski & Jean-Pierre Kenne & Ali Gharbi, 2017. "Set-up and production planning in hybrid manufacturing–remanufacturing systems with large returns," International Journal of Production Research, Taylor & Francis Journals, vol. 55(13), pages 3766-3787, July.
- Polotski, V. & Kenne, J.-P. & Gharbi, A., 2019. "Joint production and maintenance optimization in flexible hybrid Manufacturing–Remanufacturing systems under age-dependent deterioration," International Journal of Production Economics, Elsevier, vol. 216(C), pages 239-254.
- Assid, M. & Gharbi, A. & Hajji, A., 2020. "Production control of failure-prone manufacturing-remanufacturing systems using mixed dedicated and shared facilities," International Journal of Production Economics, Elsevier, vol. 224(C).
- Gregory A. DeCroix, 2006. "Optimal Policy for a Multiechelon Inventory System with Remanufacturing," Operations Research, INFORMS, vol. 54(3), pages 532-543, June.
- Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
- Ahiska, S. Sebnem & King, Russell E., 2010. "Life cycle inventory policy characterizations for a single-product recoverable system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 51-61, March.
- Sabharwal, Srishti & Garg, Suresh, 2013. "Determining cost effectiveness index of remanufacturing: A graph theoretic approach," International Journal of Production Economics, Elsevier, vol. 144(2), pages 521-532.
- Sebnem Ahiska, S. & King, Russell E., 2010. "Inventory optimization in a one product recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 11-19, March.
- Sean X. Zhou & Zhijie Tao & Xiuli Chao, 2011. "Optimal Control of Inventory Systems with Multiple Types of Remanufacturable Products," Manufacturing & Service Operations Management, INFORMS, vol. 13(1), pages 20-34, March.
- Shuihua Han & Weina Ma & Ling Zhao & Xuelian Zhang & Ming K. Lim & Shuangyuan Yang & Stephen Leung, 2016. "A robust optimisation model for hybrid remanufacturing and manufacturing systems under uncertain return quality and market demand," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5056-5072, September.
- Kenné, Jean-Pierre & Dejax, Pierre & Gharbi, Ali, 2012. "Production planning of a hybrid manufacturing–remanufacturing system under uncertainty within a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 135(1), pages 81-93.
- Kim, Eungab & Saghafian, Soroush & Van Oyen, Mark P., 2013. "Joint control of production, remanufacturing, and disposal activities in a hybrid manufacturing–remanufacturing system," European Journal of Operational Research, Elsevier, vol. 231(2), pages 337-348.
- Liu, Wenjie & Liu, Wei & Shen, Ningning & Xu, Zhitao & Xie, Naiming & Chen, Jian & Zhou, Huiyu, 2022. "Pricing and collection decisions of a closed-loop supply chain with fuzzy demand," International Journal of Production Economics, Elsevier, vol. 245(C).
- Özceylan, Eren & Paksoy, Turan & Bektaş, Tolga, 2014. "Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 61(C), pages 142-164.
- Niknejad, A. & Petrovic, D., 2014. "Optimisation of integrated reverse logistics networks with different product recovery routes," European Journal of Operational Research, Elsevier, vol. 238(1), pages 143-154.
- Kilic, Onur A. & Tunc, Huseyin & Tarim, S. Armagan, 2018. "Heuristic policies for the stochastic economic lot sizing problem with remanufacturing under service level constraints," European Journal of Operational Research, Elsevier, vol. 267(3), pages 1102-1109.
- Inderfurth, Karl, 2004. "Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution," International Journal of Production Economics, Elsevier, vol. 90(3), pages 325-343, August.
- De Giovanni, Pietro & Zaccour, Georges, 2014. "A two-period game of a closed-loop supply chain," European Journal of Operational Research, Elsevier, vol. 232(1), pages 22-40.
- de Brito, Marisa P. & Dekker, Rommert, 2003.
"Modelling product returns in inventory control--exploring the validity of general assumptions,"
International Journal of Production Economics, Elsevier, vol. 81(1), pages 225-241, January.
- de Brito, M.P. & Dekker, R., 2001. "Modelling product returns in inventory control - exploring the validity or general assumptions," Econometric Institute Research Papers EI 2001-27, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Roland Geyer & Luk N. Van Wassenhove & Atalay Atasu, 2007. "The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles," Management Science, INFORMS, vol. 53(1), pages 88-100, January.
More about this item
Keywords
Manufacturing; Remanufacturing; Setup; Optimal scheduling; Limit cycle; Numerical methods;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:183:y:2017:i:pb:p:322-333. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.