Group scheduling with group-dependent multiple due windows assignment
Author
Abstract
Suggested Citation
DOI: 10.1080/00207543.2015.1058538
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Li, Shisheng & Ng, C.T. & Yuan, Jinjiang, 2011. "Group scheduling and due date assignment on a single machine," International Journal of Production Economics, Elsevier, vol. 130(2), pages 230-235, April.
- Bernard Dickman & Yonah Wilamowsky & Sheldon Epstein, 2001. "Multiple common due dates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(4), pages 293-298, June.
- Gordon, Valery & Proth, Jean-Marie & Chu, Chengbin, 2002. "A survey of the state-of-the-art of common due date assignment and scheduling research," European Journal of Operational Research, Elsevier, vol. 139(1), pages 1-25, May.
- G Mosheiov & A Sarig, 2008. "A due-window assignment problem with position-dependent processing times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(7), pages 997-1003, July.
- S. S. Panwalkar & M. L. Smith & A. Seidmann, 1982. "Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem," Operations Research, INFORMS, vol. 30(2), pages 391-399, April.
- Yang, Dar-Li & Lai, Chien-Jung & Yang, Suh-Jenq, 2014. "Scheduling problems with multiple due windows assignment and controllable processing times on a single machine," International Journal of Production Economics, Elsevier, vol. 150(C), pages 96-103.
- Liman, Surya D. & Panwalkar, Shrikant S. & Thongmee, Sansern, 1996. "Determination of common due window location in a single machine scheduling problem," European Journal of Operational Research, Elsevier, vol. 93(1), pages 68-74, August.
- C. Ng & T. Cheng & Adam Janiak & Mikhail Kovalyov, 2005. "Group Scheduling with Controllable Setup and Processing Times: Minimizing Total Weighted Completion Time," Annals of Operations Research, Springer, vol. 133(1), pages 163-174, January.
- Cheng, T.C.E. & Yang, Suh-Jenq & Yang, Dar-Li, 2012. "Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity," International Journal of Production Economics, Elsevier, vol. 135(1), pages 154-161.
- Suresh Chand & Dilip Chhajed, 1992. "A Single Machine Model for Determination of Optimal Due Dates and Sequence," Operations Research, INFORMS, vol. 40(3), pages 596-602, June.
- Yeung, W. K. & Oguz, Ceyda & Edwin Cheng, T. C., 2004. "Two-stage flowshop earliness and tardiness machine scheduling involving a common due window," International Journal of Production Economics, Elsevier, vol. 90(3), pages 421-434, August.
- Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
- Mosheiov, Gur & Sarig, Assaf, 2010. "Scheduling identical jobs and due-window on uniform machines," European Journal of Operational Research, Elsevier, vol. 201(3), pages 712-719, March.
- Logendran, Rasaratnam & Carson, Sara & Hanson, Erik, 2005. "Group scheduling in flexible flow shops," International Journal of Production Economics, Elsevier, vol. 96(2), pages 143-155, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Jin Qian & Yu Zhan, 2022. "Single-Machine Group Scheduling Model with Position-Dependent and Job-Dependent DeJong’s Learning Effect," Mathematics, MDPI, vol. 10(14), pages 1-9, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Hui Zhu & Min Li & Zhangjin Zhou & Yun You, 2016. "Due-window assignment and scheduling with general position-dependent processing times involving a deteriorating and compressible maintenance activity," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3475-3490, June.
- Li, Shisheng & Ng, C.T. & Yuan, Jinjiang, 2011. "Group scheduling and due date assignment on a single machine," International Journal of Production Economics, Elsevier, vol. 130(2), pages 230-235, April.
- Janiak, Adam & Janiak, Władysław A. & Krysiak, Tomasz & Kwiatkowski, Tomasz, 2015. "A survey on scheduling problems with due windows," European Journal of Operational Research, Elsevier, vol. 242(2), pages 347-357.
- Yin, Yunqiang & Cheng, T.C.E. & Hsu, Chou-Jung & Wu, Chin-Chia, 2013. "Single-machine batch delivery scheduling with an assignable common due window," Omega, Elsevier, vol. 41(2), pages 216-225.
- Long Zhang & Yuzhong Zhang & Qingguo Bai, 0. "An approximation algorithm for a supply-chain scheduling problem with an assignable common due window and holding time," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-13.
- Yunqiang Yin & Du-Juan Wang & T C E Cheng & Chin-Chia Wu, 2016. "Bi-criterion single-machine scheduling and due-window assignment with common flow allowances and resource-dependent processing times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(9), pages 1169-1183, September.
- Long Zhang & Yuzhong Zhang & Qingguo Bai, 2022. "An approximation algorithm for a supply-chain scheduling problem with an assignable common due window and holding time," Journal of Combinatorial Optimization, Springer, vol. 44(4), pages 2167-2179, November.
- Leyvand, Yaron & Shabtay, Dvir & Steiner, George, 2010. "A unified approach for scheduling with convex resource consumption functions using positional penalties," European Journal of Operational Research, Elsevier, vol. 206(2), pages 301-312, October.
- Li, Gang & Wang, Xiao-Yuan & Wang, Ji-Bo & Sun, Lin-Yan, 2013. "Worst case analysis of flow shop scheduling problems with a time-dependent learning effect," International Journal of Production Economics, Elsevier, vol. 142(1), pages 98-104.
- Gerstl, Enrique & Mosheiov, Gur, 2013. "Due-window assignment with identical jobs on parallel uniform machines," European Journal of Operational Research, Elsevier, vol. 229(1), pages 41-47.
- Yang, Dar-Li & Lai, Chien-Jung & Yang, Suh-Jenq, 2014. "Scheduling problems with multiple due windows assignment and controllable processing times on a single machine," International Journal of Production Economics, Elsevier, vol. 150(C), pages 96-103.
- Baruch Mor, 2019. "Minmax scheduling problems with common due-date and completion time penalty," Journal of Combinatorial Optimization, Springer, vol. 38(1), pages 50-71, July.
- Cheng, T.C.E. & Yang, Suh-Jenq & Yang, Dar-Li, 2012. "Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity," International Journal of Production Economics, Elsevier, vol. 135(1), pages 154-161.
- Baruch Mor & Gur Mosheiov, 2021. "A note on the single machine CON and CONW problems with lot scheduling," Journal of Combinatorial Optimization, Springer, vol. 42(2), pages 327-338, August.
- G Mosheiov & A Sarig, 2008. "A due-window assignment problem with position-dependent processing times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(7), pages 997-1003, July.
- Su, Ling-Huey & Tien, Yi-Yu, 2011. "Minimizing mean absolute deviation of completion time about a common due window subject to maximum tardiness for a single machine," International Journal of Production Economics, Elsevier, vol. 134(1), pages 196-203, November.
- Philip Kaminsky & Onur Kaya, 2008. "Scheduling and due‐date quotation in a make‐to‐order supply chain," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(5), pages 444-458, August.
- Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
- Min Ji & Sai Liu & Xiaolin Zhang & Keke Cao & T. C. E. Cheng, 2017. "Sequencing Games with Slack Due Windows and Group Technology Considerations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(2), pages 121-133, February.
- Lin, Shih-Wei & Chou, Shuo-Yan & Ying, Kuo-Ching, 2007. "A sequential exchange approach for minimizing earliness-tardiness penalties of single-machine scheduling with a common due date," European Journal of Operational Research, Elsevier, vol. 177(2), pages 1294-1301, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:54:y:2016:i:4:p:1244-1256. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.