Group scheduling in flexible flow shops
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Logendran, Rasaratnam & Nudtasomboon, Nudtapon, 1991. "Minimizing the makespan of a group scheduling problem: a new heuristic," International Journal of Production Economics, Elsevier, vol. 22(3), pages 217-230, December.
- Herbert G. Campbell & Richard A. Dudek & Milton L. Smith, 1970. "A Heuristic Algorithm for the n Job, m Machine Sequencing Problem," Management Science, INFORMS, vol. 16(10), pages 630-637, June.
- Tadeusz J. Sawik, 1993. "A scheduling algorithm for flexible flow lines with limited intermediate buffers," Applied Stochastic Models and Data Analysis, John Wiley & Sons, vol. 9(2), pages 127-138, June.
- Kurz, Mary E. & Askin, Ronald G., 2003. "Comparing scheduling rules for flexible flow lines," International Journal of Production Economics, Elsevier, vol. 85(3), pages 371-388, September.
- Logendran, Rasaratnam & Mai, Luen & Talkington, Diane, 1995. "Combined heuristics for bi-level group scheduling problems," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 133-145, March.
- R Logendran & V Sirikrai, 2000. "Machine duplication and part subcontracting in the presence of alternative cell locations in manufacturing cell design," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(5), pages 609-624, May.
- Sriskandarajah, C. & Sethi, S. P., 1989. "Scheduling algorithms for flexible flowshops: Worst and average case performance," European Journal of Operational Research, Elsevier, vol. 43(2), pages 143-160, November.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Taha Keshavarz & Nasser Salmasi & Mohsen Varmazyar, 2015. "Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem," Annals of Operations Research, Springer, vol. 226(1), pages 351-377, March.
- Li, Shisheng & Ng, C.T. & Yuan, Jinjiang, 2011. "Group scheduling and due date assignment on a single machine," International Journal of Production Economics, Elsevier, vol. 130(2), pages 230-235, April.
- Hamed Hendizadeh, S. & Faramarzi, Hamidreza & Mansouri, S.Afshin & Gupta, Jatinder N.D. & Y ElMekkawy, Tarek, 2008. "Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times," International Journal of Production Economics, Elsevier, vol. 111(2), pages 593-605, February.
- Min Ji & Xin Zhang & Xiaoying Tang & T.C.E. Cheng & Guiyi Wei & Yuanyuan Tan, 2016. "Group scheduling with group-dependent multiple due windows assignment," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1244-1256, February.
- Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
- Solimanpur, Maghsud & Elmi, Atabak, 2013. "A tabu search approach for cell scheduling problem with makespan criterion," International Journal of Production Economics, Elsevier, vol. 141(2), pages 639-645.
- Paul Schikora & Andrew Manikas & Michael Godfrey, 2015. "Determining Optimal Flow-Time Schedules For The Multiple-Product Batch-Flow Problem," International Journal of Management and Marketing Research, The Institute for Business and Finance Research, vol. 8(2), pages 19-35.
- Luo, Hao & Du, Bing & Huang, George Q. & Chen, Huaping & Li, Xiaolin, 2013. "Hybrid flow shop scheduling considering machine electricity consumption cost," International Journal of Production Economics, Elsevier, vol. 146(2), pages 423-439.
- Ruiz, Rubén & Vázquez-Rodríguez, José Antonio, 2010. "The hybrid flow shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 205(1), pages 1-18, August.
- Amin-Naseri, Mohammad Reza & Beheshti-Nia, Mohammad Ali, 2009. "Hybrid flow shop scheduling with parallel batching," International Journal of Production Economics, Elsevier, vol. 117(1), pages 185-196, January.
- Logendran, Rasaratnam & deSzoeke, Paula & Barnard, Faith, 2006. "Sequence-dependent group scheduling problems in flexible flow shops," International Journal of Production Economics, Elsevier, vol. 102(1), pages 66-86, July.
- Allahverdi, Ali, 2006. "Two-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times," International Journal of Production Economics, Elsevier, vol. 103(1), pages 386-400, September.
- Feng, Hanxin & Xi, Lifeng & Xiao, Lei & Xia, Tangbin & Pan, Ershun, 2018. "Imperfect preventive maintenance optimization for flexible flowshop manufacturing cells considering sequence-dependent group scheduling," Reliability Engineering and System Safety, Elsevier, vol. 176(C), pages 218-229.
- Liou, Cheng-Dar & Hsieh, Yi-Chih, 2015. "A hybrid algorithm for the multi-stage flow shop group scheduling with sequence-dependent setup and transportation times," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 258-267.
- Zhuang Huang & Jianjun Yang, 2020. "Scheduling Optimization in Flowline Manufacturing Cell Considering Intercell Movement with Harmony Search Approach," Mathematics, MDPI, vol. 8(12), pages 1-21, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Logendran, Rasaratnam & deSzoeke, Paula & Barnard, Faith, 2006. "Sequence-dependent group scheduling problems in flexible flow shops," International Journal of Production Economics, Elsevier, vol. 102(1), pages 66-86, July.
- Quadt, Daniel & Kuhn, Heinrich, 2007. "A taxonomy of flexible flow line scheduling procedures," European Journal of Operational Research, Elsevier, vol. 178(3), pages 686-698, May.
- Solimanpur, M. & Vrat, Prem & Shankar, Ravi, 2004. "A heuristic to minimize makespan of cell scheduling problem," International Journal of Production Economics, Elsevier, vol. 88(3), pages 231-241, April.
- Ruiz, Rubén & Vázquez-Rodríguez, José Antonio, 2010. "The hybrid flow shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 205(1), pages 1-18, August.
- Kurz, Mary E. & Askin, Ronald G., 2004. "Scheduling flexible flow lines with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 159(1), pages 66-82, November.
- Ruiz, Ruben & Maroto, Concepcion, 2006. "A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility," European Journal of Operational Research, Elsevier, vol. 169(3), pages 781-800, March.
- Quadt, Daniel & Kuhn, Heinrich, 2007. "Batch scheduling of jobs with identical process times on flexible flow lines," International Journal of Production Economics, Elsevier, vol. 105(2), pages 385-401, February.
- Antonio Costa & Fulvio Antonio Cappadonna & Sergio Fichera, 2017. "A hybrid genetic algorithm for minimizing makespan in a flow-shop sequence-dependent group scheduling problem," Journal of Intelligent Manufacturing, Springer, vol. 28(6), pages 1269-1283, August.
- J. Behnamian, 2016. "Survey on fuzzy shop scheduling," Fuzzy Optimization and Decision Making, Springer, vol. 15(3), pages 331-366, September.
- Logendran, Rasaratnam & Mai, Luen & Talkington, Diane, 1995. "Combined heuristics for bi-level group scheduling problems," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 133-145, March.
- Brah, Shaukat A. & Loo, Luan Luan, 1999. "Heuristics for scheduling in a flow shop with multiple processors," European Journal of Operational Research, Elsevier, vol. 113(1), pages 113-122, February.
- Kurz, Mary E. & Askin, Ronald G., 2003. "Comparing scheduling rules for flexible flow lines," International Journal of Production Economics, Elsevier, vol. 85(3), pages 371-388, September.
- Sung, C.S. & Kim, Hyun Ah, 2008. "A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times," International Journal of Production Economics, Elsevier, vol. 113(2), pages 1038-1048, June.
- Lin, Hung-Tso & Liao, Ching-Jong, 2003. "A case study in a two-stage hybrid flow shop with setup time and dedicated machines," International Journal of Production Economics, Elsevier, vol. 86(2), pages 133-143, November.
- Zhen Song & Håkan Schunnesson & Mikael Rinne & John Sturgul, 2015. "Intelligent Scheduling for Underground Mobile Mining Equipment," PLOS ONE, Public Library of Science, vol. 10(6), pages 1-21, June.
- Sündüz Dağ, 2013. "An Application On Flowshop Scheduling," Alphanumeric Journal, Bahadir Fatih Yildirim, vol. 1(1), pages 47-56, December.
- Bozorgirad, Mir Abbas & Logendran, Rasaratnam, 2013. "Bi-criteria group scheduling in hybrid flowshops," International Journal of Production Economics, Elsevier, vol. 145(2), pages 599-612.
- Barry B. & Quim Castellà & Angel A. & Helena Ramalhinho Lourenco & Manuel Mateo, 2012. "ILS-ESP: An Efficient, Simple, and Parameter-Free Algorithm for Solving the Permutation Flow-Shop Problem," Working Papers 636, Barcelona School of Economics.
- Azizoglu, Meral & Cakmak, Ergin & Kondakci, Suna, 2001. "A flexible flowshop problem with total flow time minimization," European Journal of Operational Research, Elsevier, vol. 132(3), pages 528-538, August.
- Gupta, Jatinder N.D. & Koulamas, Christos & Kyparisis, George J., 2006. "Performance guarantees for flowshop heuristics to minimize makespan," European Journal of Operational Research, Elsevier, vol. 169(3), pages 865-872, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:96:y:2005:i:2:p:143-155. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.