Asset replacement under improving operating and capital costs: a practical approach
Author
Abstract
Suggested Citation
DOI: 10.1080/00207543.2015.1135259
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Yatsenko, Yuri & Hritonenko, Natali, 2015. "Algorithms for asset replacement under limited technological forecast," International Journal of Production Economics, Elsevier, vol. 160(C), pages 26-33.
- Reindorp, Matthew J. & Fu, Michael C., 2011. "Capital renewal as a real option," European Journal of Operational Research, Elsevier, vol. 214(1), pages 109-117, October.
- Yatsenko, Yuri & Hritonenko, Natali, 2011. "Economic life replacement under improving technology," International Journal of Production Economics, Elsevier, vol. 133(2), pages 596-602, October.
- Farid Mardin & Takeshi Arai, 2012. "Capital Equipment Replacement Under Technological Change," The Engineering Economist, Taylor & Francis Journals, vol. 57(2), pages 119-129.
- Gryglewicz, Sebastian & Huisman, Kuno J.M. & Kort, Peter M., 2008.
"Finite project life and uncertainty effects on investment,"
Journal of Economic Dynamics and Control, Elsevier, vol. 32(7), pages 2191-2213, July.
- Gryglewicz, S. & Huisman, K.J.M. & Kort, P.M., 2006. "Finite Project Life and Uncertainty Effects on Investment," Other publications TiSEM 55153914-7cb5-4afc-8364-1, Tilburg University, School of Economics and Management.
- Gryglewicz, S. & Huisman, K.J.M. & Kort, P.M., 2006. "Finite Project Life and Uncertainty Effects on Investment," Discussion Paper 2006-124, Tilburg University, Center for Economic Research.
- Natali Hritonenko & Yuri Yatsenko, 2013. "Mathematical Modeling in Economics, Ecology and the Environment," Springer Optimization and Its Applications, Springer, edition 2, number 978-1-4614-9311-2, December.
- Nguyen, T.P. Khanh & Yeung, Thomas G. & Castanier, Bruno, 2013. "Optimal maintenance and replacement decisions under technological change with consideration of spare parts inventories," International Journal of Production Economics, Elsevier, vol. 143(2), pages 472-477.
- Ye, Meng-Hua, 1990. "Optimal replacement policy with stochastic maintenance and operation costs," European Journal of Operational Research, Elsevier, vol. 44(1), pages 84-94, January.
- Yatsenko, Yuri & Hritonenko, Natali, 2008.
"Technological breakthroughs and asset replacement,"
LIDAM Discussion Papers CORE
2008074, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- YATSENKO, Yuri & HRITONENKO, Natali, 2009. "Technological breakthroughs and asset replacement," LIDAM Reprints CORE 2121, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- YATSENKO, Yuri & HRITONENKO, Natali, 2008. "Discrete-continuous analysis of optimal equipment replacement," LIDAM Discussion Papers CORE 2008069, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Nejat Karabakal & Jack R. Lohmann & James C. Bean, 1994. "Parallel Replacement under Capital Rationing Constraints," Management Science, INFORMS, vol. 40(3), pages 305-319, March.
- Sampath Rajagopalan & Medini R. Singh & Thomas E. Morton, 1998. "Capacity Expansion and Replacement in Growing Markets with Uncertain Technological Breakthroughs," Management Science, INFORMS, vol. 44(1), pages 12-30, January.
- Antoine Bonleu & Gilbert Cette & Guillaume Horny, 2013.
"Capital utilization and retirement,"
Applied Economics, Taylor & Francis Journals, vol. 45(24), pages 3483-3494, August.
- Bonleu, A. & Cette, G. & Horny, G., 2011. "Capital Utilisation and Retirement," Working papers 343, Banque de France.
- Antoine Bonleu & Gilbert Cette & Guillaume Horny, 2013. "Capital utilization and retirement," Post-Print hal-01500866, HAL.
- Antoine Bonleu & Gilbert Cette & Guillaume Horny, 2011. "Capital Utilisation and Retirement," Working Papers halshs-00635477, HAL.
- Joseph C. Hartman & Chin Hon Tan, 2014. "Equipment Replacement Analysis: A Literature Review and Directions for Future Research," The Engineering Economist, Taylor & Francis Journals, vol. 59(2), pages 136-153, April.
- Suresh Sethi & Suresh Chand, 1979. "Planning Horizon Procedures for Machine Replacement Models," Management Science, INFORMS, vol. 25(2), pages 140-151, February.
- Malchow-Moller, Nikolaj & Thorsen, Bo Jellesmark, 2005. "Repeated real options: optimal investment behaviour and a good rule of thumb," Journal of Economic Dynamics and Control, Elsevier, vol. 29(6), pages 1025-1041, June.
- Mauer, David C. & Ott, Steven H., 1995. "Investment under Uncertainty: The Case of Replacement Investment Decisions," Journal of Financial and Quantitative Analysis, Cambridge University Press, vol. 30(4), pages 581-605, December.
- Richardson, Steven & Kefford, Adrian & Hodkiewicz, Melinda, 2013. "Optimised asset replacement strategy in the presence of lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 141(2), pages 659-667.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Dafydd Mali & Hyoung-Joo Lim, 2022. "Does relative (absolute) efficiency affect capital costs?," Annals of Operations Research, Springer, vol. 315(2), pages 1037-1060, August.
- Yatsenko, Yuri & Hritonenko, Natali, 2020. "Optimal asset replacement: Profit maximization under varying technology," International Journal of Production Economics, Elsevier, vol. 228(C).
- Yatsenko, Yuri & Hritonenko, Natali, 2017. "Machine replacement under evolving deterministic and stochastic costs," International Journal of Production Economics, Elsevier, vol. 193(C), pages 491-501.
- Liu, Xinyang & Zheng, Zhuoyuan & Büyüktahtakın, İ. Esra & Zhou, Zhi & Wang, Pingfeng, 2021. "Battery asset management with cycle life prognosis," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Yatsenko, Yuri & Hritonenko, Natali, 2017. "Machine replacement under evolving deterministic and stochastic costs," International Journal of Production Economics, Elsevier, vol. 193(C), pages 491-501.
- Stutzman, Sarah & Weiland, Brandon & Preckel, Paul & Wetzstein, Michael, 2017. "Optimal replacement policies for an uncertain rejuvenated asset," International Journal of Production Economics, Elsevier, vol. 185(C), pages 21-33.
- Yatsenko, Yuri & Hritonenko, Natali, 2015. "Algorithms for asset replacement under limited technological forecast," International Journal of Production Economics, Elsevier, vol. 160(C), pages 26-33.
- Adkins, Roger & Paxson, Dean, 2017. "Replacement decisions with multiple stochastic values and depreciation," European Journal of Operational Research, Elsevier, vol. 257(1), pages 174-184.
- Adkins, Roger & Paxson, Dean, 2013. "Deterministic models for premature and postponed replacement," Omega, Elsevier, vol. 41(6), pages 1008-1019.
- Ben Abdallah, Skander & Lasserre, Pierre, 2016.
"Asset retirement with infinitely repeated alternative replacements: Harvest age and species choice in forestry,"
Journal of Economic Dynamics and Control, Elsevier, vol. 70(C), pages 144-164.
- Skander Ben Abdallah & Pierre Lasserre, 2016. "Asset Retirement with Infinitely Repeated Alternative Replacements: Harvest Age and Species Choice in Forestry," CIRANO Working Papers 2016s-37, CIRANO.
- Yatsenko, Yuri & Hritonenko, Natali, 2020. "Optimal asset replacement: Profit maximization under varying technology," International Journal of Production Economics, Elsevier, vol. 228(C).
- Koch, Nicolas & Reuter, Wolf Heinrich & Fuss, Sabine & Grosjean, Godefroy, 2017. "Permits vs. offsets under investment uncertainty," Resource and Energy Economics, Elsevier, vol. 49(C), pages 33-47.
- Paul R. Kleindorfer & Andrei Neboian & Alain Roset & Stefan Spinler, 2012. "Fleet Renewal with Electric Vehicles at La Poste," Interfaces, INFORMS, vol. 42(5), pages 465-477, October.
- Alp, Osman & Tan, Tarkan & Udenio, Maximiliano, 2022. "Transitioning to sustainable freight transportation by integrating fleet replacement and charging infrastructure decisions," Omega, Elsevier, vol. 109(C).
- Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2015. "On the upgrading policy after the redesign of a component for reliability improvement," European Journal of Operational Research, Elsevier, vol. 244(3), pages 867-880.
- Mellal, Mohamed Arezki, 2020. "Obsolescence – A review of the literature," Technology in Society, Elsevier, vol. 63(C).
- Khanh T.P. Nguyen & Thomas Yeung & Bruno Castanier, 2017. "Acquisition of new technology information for maintenance and replacement policies," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2212-2231, April.
- Chand, Suresh & McClurg, Tim & Ward, Jim, 2000. "A model for parallel machine replacement with capacity expansion," European Journal of Operational Research, Elsevier, vol. 121(3), pages 519-531, March.
- Yatsenko, Yuri & Hritonenko, Natali, 2008. "Properties of optimal service life under technological change," International Journal of Production Economics, Elsevier, vol. 114(1), pages 230-238, July.
- Viviana Fernández, 1998. "Un Modelo de Duración Estructural para el Reemplazo de Bienes Durables," Latin American Journal of Economics-formerly Cuadernos de Economía, Instituto de Economía. Pontificia Universidad Católica de Chile., vol. 35(105), pages 237-254.
- Viviana P. Fernandez, 2000.
"Decisions To Replace Consumer Durables Goods: An Econometric Application Of Wiener And Renewal Processes,"
The Review of Economics and Statistics, MIT Press, vol. 82(3), pages 452-461, August.
- Viviana Fernandez, 2000. "Decisions to Replace Consumer Durables Goods: An Econometric Application of Wiener and Renewal Processes," Documentos de Trabajo 87, Centro de Economía Aplicada, Universidad de Chile.
- Trigeorgis, Lenos & Tsekrekos, Andrianos E., 2018. "Real Options in Operations Research: A Review," European Journal of Operational Research, Elsevier, vol. 270(1), pages 1-24.
- Yilmaz, Fatih, 2001. "Conditional investment policy under uncertainty and irreversibility," European Journal of Operational Research, Elsevier, vol. 132(3), pages 681-686, August.
- Richardson, Steven & Kefford, Adrian & Hodkiewicz, Melinda, 2013. "Optimised asset replacement strategy in the presence of lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 141(2), pages 659-667.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:54:y:2016:i:10:p:2922-2933. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.