IDEAS home Printed from https://ideas.repec.org/a/wly/apsmbi/v24y2008i3p203-219.html
   My bibliography  Save this article

An optimization problem of manufacturing systems with stochastic machine breakdown and rework process

Author

Listed:
  • Singa Wang Chiu

Abstract

This paper is concerned with optimization of production run time that takes stochastic breakdown and the reworking of defective items into consideration. In a real‐life manufacturing process, production of imperfect quality items as well as random breakdowns of production equipment is inevitable. All defective items produced are assumed to be repairable through a rework process right after the regular production stops in each cycle. This research starts with derivations of the cost functions for production systems with breakdown (no‐resumption policy is considered) and without breakdown taking place, respectively. Then cost functions of both cases are integrated. Theorems on conditional convexity of the overall cost function and bounds for optimal production run time are proposed and proved. This study concludes that although the optimal run time cannot be expressed in a closed form, it falls within the range of bounds. Hence, it can be pinpointed by the use of the bisection method based on the intermediate value theorem. A numerical example is provided to demonstrate its practical usages. Copyright © 2007 John Wiley & Sons, Ltd.

Suggested Citation

  • Singa Wang Chiu, 2008. "An optimization problem of manufacturing systems with stochastic machine breakdown and rework process," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 24(3), pages 203-219, May.
  • Handle: RePEc:wly:apsmbi:v:24:y:2008:i:3:p:203-219
    DOI: 10.1002/asmb.699
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/asmb.699
    Download Restriction: no

    File URL: https://libkey.io/10.1002/asmb.699?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Mingzhou Liu & Jing Ma & Ling Lin & Maogen Ge & Qiang Wang & Conghu Liu, 2017. "Intelligent assembly system for mechanical products and key technology based on internet of things," Journal of Intelligent Manufacturing, Springer, vol. 28(2), pages 271-299, February.
    2. Chen, Tsung-Hui & Tsao, Yu-Chung, 2014. "Optimal lot-sizing integration policy under learning and rework effects in a manufacturer–retailer chain," International Journal of Production Economics, Elsevier, vol. 155(C), pages 239-248.
    3. Yuan-Shyi Peter Chiu & Chih-An Katherine Lin & Huei-Hsin Chang & Victoria Chiu, 2010. "Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance," Mathematical and Computer Modelling of Dynamical Systems, Taylor & Francis Journals, vol. 16(4), pages 373-388, July.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:apsmbi:v:24:y:2008:i:3:p:203-219. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1526-4025 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.