Scheduling unrelated parallel machine problem with multi-mode processing times and batch delivery cost
Author
Abstract
Suggested Citation
DOI: 10.1007/s12597-022-00587-z
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Herrmann, Jeffrey W. & Lee, Chung-Yee, 1993. "On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date," European Journal of Operational Research, Elsevier, vol. 70(3), pages 272-288, November.
- Eva Vallada & Rubén Ruiz, 2012. "Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization," Springer Optimization and Its Applications, in: Roger Z. Ríos-Mercado & Yasmín A. Ríos-Solís (ed.), Just-in-Time Systems, chapter 0, pages 67-90, Springer.
- Ayten Turkcan & M. Akturk & Robert Storer, 2009. "Predictive/reactive scheduling with controllable processing times and earliness-tardiness penalties," IISE Transactions, Taylor & Francis Journals, vol. 41(12), pages 1080-1095.
- R. G. Vickson, 1980. "Choosing the Job Sequence and Processing Times to Minimize Total Processing Plus Flow Cost on a Single Machine," Operations Research, INFORMS, vol. 28(5), pages 1155-1167, October.
- Yang, Dar-Li & Lai, Chien-Jung & Yang, Suh-Jenq, 2014. "Scheduling problems with multiple due windows assignment and controllable processing times on a single machine," International Journal of Production Economics, Elsevier, vol. 150(C), pages 96-103.
- Fanjul-Peyro, Luis & Perea, Federico & Ruiz, Rubén, 2017. "Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources," European Journal of Operational Research, Elsevier, vol. 260(2), pages 482-493.
- Nicholas G. Hall & Wieslaw Kubiak & Suresh P. Sethi, 1991. "Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date," Operations Research, INFORMS, vol. 39(5), pages 847-856, October.
- Margaux Nattaf & Christian Artigues & Pierre Lopez & David Rivreau, 2016. "Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(2), pages 459-492, March.
- Xinyu Sun & Xin-Na Geng & Ji-Bo Wang & Feng Liu, 2019. "Convex resource allocation scheduling in the no-wait flowshop with common flow allowance and learning effect," International Journal of Production Research, Taylor & Francis Journals, vol. 57(6), pages 1873-1891, March.
- Edis, Emrah B. & Oguz, Ceyda & Ozkarahan, Irem, 2013. "Parallel machine scheduling with additional resources: Notation, classification, models and solution methods," European Journal of Operational Research, Elsevier, vol. 230(3), pages 449-463.
- Shabtay, Dvir & Zofi, Moshe, 2018. "Single machine scheduling with controllable processing times and an unavailability period to minimize the makespan," International Journal of Production Economics, Elsevier, vol. 198(C), pages 191-200.
- Nicholas G. Hall & Marc E. Posner, 1991. "Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date," Operations Research, INFORMS, vol. 39(5), pages 836-846, October.
- Fu Gao & Mengqi Liu & Jian-Jun Wang & Yuan-Yuan Lu, 2018. "No-wait two-machine permutation flow shop scheduling problem with learning effect, common due date and controllable job processing times," International Journal of Production Research, Taylor & Francis Journals, vol. 56(6), pages 2361-2369, March.
- Chun-Lai Liu & Jian-Jun Wang, 2016. "Unrelated Parallel-Machine Scheduling with Controllable Processing Times and Impact of Deteriorating Maintenance Activities under Consideration," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(01), pages 1-16, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Rafał Różycki & Joanna Józefowska & Krzysztof Kurowski & Tomasz Lemański & Tomasz Pecyna & Marek Subocz & Grzegorz Waligóra, 2022. "A Quantum Approach to the Problem of Charging Electric Cars on a Motorway," Energies, MDPI, vol. 16(1), pages 1-20, December.
- Oğuzhan Ahmet Arık, 2024. "Optimal policies for minimizing total job completion times and deviations from common due dates in unrelated parallel machine scheduling," OPSEARCH, Springer;Operational Research Society of India, vol. 61(3), pages 1654-1680, September.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Zhang, Zhe & Gong, Xue & Song, Xiaoling & Yin, Yong & Lev, Benjamin & Chen, Jie, 2022. "A column generation-based exact solution method for seru scheduling problems," Omega, Elsevier, vol. 108(C).
- Chung‐Lun Li & Edward C. Sewell & T. C. E. Cheng, 1995. "Scheduling to minimize release‐time resource consumption and tardiness penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(6), pages 949-966, September.
- Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
- Yuan, Jinjiang, 1996. "A note on the complexity of single-machine scheduling with a common due date, earliness-tardiness, and batch delivery costs," European Journal of Operational Research, Elsevier, vol. 94(1), pages 203-205, October.
- Zhi-Long Chen, 1997. "Scheduling with batch setup times and earliness-tardiness penalties," European Journal of Operational Research, Elsevier, vol. 96(3), pages 518-537, February.
- Chen, Zhi-Long, 1996. "Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs," European Journal of Operational Research, Elsevier, vol. 93(1), pages 49-60, August.
- Mosheiov, Gur, 2004. "Simultaneous minimization of total completion time and total deviation of job completion times," European Journal of Operational Research, Elsevier, vol. 157(2), pages 296-306, September.
- Gordon, Valery & Proth, Jean-Marie & Chu, Chengbin, 2002. "A survey of the state-of-the-art of common due date assignment and scheduling research," European Journal of Operational Research, Elsevier, vol. 139(1), pages 1-25, May.
- Koulamas, Christos & Kyparisis, George J., 2023. "A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems," European Journal of Operational Research, Elsevier, vol. 305(3), pages 999-1017.
- Hoogeveen, Han, 2005. "Multicriteria scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 592-623, December.
- Fleszar, Krzysztof & Hindi, Khalil S., 2018. "Algorithms for the unrelated parallel machine scheduling problem with a resource constraint," European Journal of Operational Research, Elsevier, vol. 271(3), pages 839-848.
- X. Cai & F. S. Tu, 1996. "Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early‐tardy penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(8), pages 1127-1146, December.
- Li, Y. & Ip, W. H. & Wang, D. W., 1998. "Genetic algorithm approach to earliness and tardiness production scheduling and planning problem," International Journal of Production Economics, Elsevier, vol. 54(1), pages 65-76, January.
- Philip Kaminsky & Onur Kaya, 2008. "Scheduling and due‐date quotation in a make‐to‐order supply chain," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(5), pages 444-458, August.
- Hesham K. Alfares, 2022. "Plant shutdown maintenance workforce team assignment and job scheduling," Journal of Scheduling, Springer, vol. 25(3), pages 321-338, June.
- C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
- Baals, Julian & Emde, Simon & Turkensteen, Marcel, 2023. "Minimizing earliness-tardiness costs in supplier networks—A just-in-time truck routing problem," European Journal of Operational Research, Elsevier, vol. 306(2), pages 707-741.
- Shabtay, Dvir, 2022. "Single-machine scheduling with machine unavailability periods and resource dependent processing times," European Journal of Operational Research, Elsevier, vol. 296(2), pages 423-439.
- Feifeng Zheng & E. Zhang & Yinfeng Xu & Wei-Chiang Hong, 2014. "Competitive analysis for make-to-order scheduling with reliable lead time quotation," Journal of Combinatorial Optimization, Springer, vol. 27(1), pages 182-198, January.
- Cai, X. & Lum, V. Y. S. & Chan, J. M. T., 1997. "Scheduling about a common due date with kob-dependent asymmetric earliness and tardiness penalties," European Journal of Operational Research, Elsevier, vol. 98(1), pages 154-168, April.
More about this item
Keywords
Unrelated parallel machine; Multi-mode processing time; Batch delivery; Just-in-Time; Total tardiness and total earliness;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:opsear:v:59:y:2022:i:4:d:10.1007_s12597-022-00587-z. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.