Heterogeneous worker multi-functionality and efficiency in dual resource constrained manufacturing lines: an assessment by simulation
Author
Abstract
Suggested Citation
DOI: 10.1007/s12063-023-00371-2
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Sabry Shaaban & Tom McNamara, 2009. "The effects of joint operations time means and variability unbalance on production line performance," International Journal of Manufacturing Technology and Management, Inderscience Enterprises Ltd, vol. 18(1), pages 59-78.
- Gaurav Kumar Badhotiya & Gunjan Soni & Vipul Jain & Rohit Joshi & Sameer Mittal, 2022. "Assessing supply chain resilience to the outbreak of COVID-19 in Indian manufacturing firms," Operations Management Research, Springer, vol. 15(3), pages 1161-1180, December.
- Matthias Thürer & Haiwen Zhang & Mark Stevenson & Federica Costa & Lin Ma, 2020. "Worker assignment in dual resource constrained assembly job shops with worker heterogeneity: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 58(20), pages 6336-6349, October.
- Thürer, Matthias & Stevenson, Mark & Protzman, Charles W., 2015. "COBACABANA (Control of Balance by Card Based Navigation): An alternative to kanban in the pure flow shop?," International Journal of Production Economics, Elsevier, vol. 166(C), pages 143-151.
- Jing Zhang & Wanliang Wang & Xinli Xu, 2017. "A hybrid discrete particle swarm optimization for dual-resource constrained job shop scheduling with resource flexibility," Journal of Intelligent Manufacturing, Springer, vol. 28(8), pages 1961-1972, December.
- Rodrigo Romero-Silva & Sabry Shaaban, 2019. "Influence of unbalanced operation time means and uneven buffer allocation on unreliable merging assembly line efficiency," International Journal of Production Research, Taylor & Francis Journals, vol. 57(6), pages 1645-1666, March.
- Anis Assad Neto & Jessyca Sampaio & Silvana Pereira Detro & Fernando Deschamps & Eduardo Alves Portela Santos & Eduardo de Freitas Rocha Loures, 2021. "Reconciling process flexibility and standardization: a case study in the automotive industry," Operations Management Research, Springer, vol. 14(3), pages 507-524, December.
- Gerard M. Campbell, 1999. "Cross-Utilization of Workers Whose Capabilities Differ," Management Science, INFORMS, vol. 45(5), pages 722-732, May.
- Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
- Matthias Thürer & Mark Stevenson & Paolo Renna, 2019. "Workload control in dual-resource constrained high-variety shops: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 57(3), pages 931-947, February.
- Jensen, John B., 2000. "The impact of resource flexibility and staffing decisions on cellular and departmental shop performance," European Journal of Operational Research, Elsevier, vol. 127(2), pages 279-296, December.
- Frederick S. Hillier & Ronald W. Boling, 1979. "On the Optimal Allocation of Work in Symmetrically Unbalanced Production Line Systems with Variable Operation Times," Management Science, INFORMS, vol. 25(8), pages 721-728, August.
- Rajesh Pansare & Gunjan Yadav, 2022. "Repurposing production operations during COVID-19 pandemic by integrating Industry 4.0 and reconfigurable manufacturing practices: an emerging economy perspective," Operations Management Research, Springer, vol. 15(3), pages 1270-1289, December.
- Frederick S. Hillier & Ronald W. Boling, 1967. "Finite Queues in Series with Exponential or Erlang Service Times—A Numerical Approach," Operations Research, INFORMS, vol. 15(2), pages 286-303, April.
- Rosser T. Nelson, 1967. "Labor and Machine Limited Production Systems," Management Science, INFORMS, vol. 13(9), pages 648-671, May.
- Marco Ardolino & Andrea Bacchetti & Dmitry Ivanov, 2022. "Analysis of the COVID-19 pandemic’s impacts on manufacturing: a systematic literature review and future research agenda," Operations Management Research, Springer, vol. 15(1), pages 551-566, June.
- William C. Jordan & Stephen C. Graves, 1995. "Principles on the Benefits of Manufacturing Process Flexibility," Management Science, INFORMS, vol. 41(4), pages 577-594, April.
- Nina Edh Mirzaei & Per Hilletofth & Rudrajeet Pal, 2021. "Challenges to competitive manufacturing in high-cost environments: checklist and insights from Swedish manufacturing firms," Operations Management Research, Springer, vol. 14(3), pages 272-292, December.
- Ming Liu & Zhongzheng Liu & Feng Chu & Rongfan Liu & Feifeng Zheng & Chengbin Chu, 2022. "Risk-averse assembly line worker assignment and balancing problem with limited temporary workers and moving workers," International Journal of Production Research, Taylor & Francis Journals, vol. 60(23), pages 7074-7092, December.
- Vimal K.E.K & Simon Peter Nadeem & Mahadharsan Ravichandran & Manavalan Ethirajan & Jayakrishna Kandasamy, 2022. "Resilience strategies to recover from the cascading ripple effect in a copper supply chain through project management," Operations Management Research, Springer, vol. 15(1), pages 440-460, June.
- Lei, Deming & Guo, Xiuping, 2015. "An effective neighborhood search for scheduling in dual-resource constrained interval job shop with environmental objective," International Journal of Production Economics, Elsevier, vol. 159(C), pages 296-303.
- Xu, J. & Xu, X. & Xie, S.Q., 2011. "Recent developments in Dual Resource Constrained (DRC) system research," European Journal of Operational Research, Elsevier, vol. 215(2), pages 309-318, December.
- Romero-Silva, Rodrigo & Shaaban, Sabry & Marsillac, Erika & Laarraf, Zouhair, 2021. "The impact of unequal processing time variability on reliable and unreliable merging line performance," International Journal of Production Economics, Elsevier, vol. 235(C).
- Tom Mcnamara & Sabry Shaaban & Sarah Hudson, 2016. "Fifty years of the bowl phenomenon," Post-Print hal-02010636, HAL.
- Arsalan Zahid Piprani & Noor Ismawati Jaafar & Suhana Mohezar Ali & Muhammad Shujaat Mubarik & Muhammad Shahbaz, 2022. "Multi-dimensional supply chain flexibility and supply chain resilience: the role of supply chain risks exposure," Operations Management Research, Springer, vol. 15(1), pages 307-325, June.
- Park, Paul Sungchil, 1991. "The examination of worker cross-training in a dual resource constrained job shop," European Journal of Operational Research, Elsevier, vol. 52(3), pages 291-299, June.
- Xuran Gong & Qianwang Deng & Guiliang Gong & Wei Liu & Qinghua Ren, 2018. "A memetic algorithm for multi-objective flexible job-shop problem with worker flexibility," International Journal of Production Research, Taylor & Francis Journals, vol. 56(7), pages 2506-2522, April.
- Lau, Hon-Shiang, 1992. "On balancing variances of station processing times in unpaced lines," European Journal of Operational Research, Elsevier, vol. 61(3), pages 345-356, September.
- Xiao-long Zheng & Ling Wang, 2016. "A knowledge-guided fruit fly optimization algorithm for dual resource constrained flexible job-shop scheduling problem," International Journal of Production Research, Taylor & Francis Journals, vol. 54(18), pages 5554-5566, September.
- Hoda Parvin & Mark Van Oyen & Dimitrios Pandelis & Damon Williams & Junghee Lee, 2012. "Fixed task zone chaining: worker coordination and zone design for inexpensive cross-training in serial CONWIP lines," IISE Transactions, Taylor & Francis Journals, vol. 44(10), pages 894-914.
- Sabry Shaaban & Tom Mcnamara, 2009. "The effects of joint operations time means and variability unbalance on production line performance," Post-Print hal-04072929, HAL.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Henao, César Augusto & Mercado, Yessica Andrea & González, Virginia I. & Lüer-Villagra, Armin, 2023. "Multiskilled personnel assignment with k-chaining considering the learning-forgetting phenomena," International Journal of Production Economics, Elsevier, vol. 265(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jose L. Andrade-Pineda & David Canca & Pedro L. Gonzalez-R & M. Calle, 2020. "Scheduling a dual-resource flexible job shop with makespan and due date-related criteria," Annals of Operations Research, Springer, vol. 291(1), pages 5-35, August.
- Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
- Xu, J. & Xu, X. & Xie, S.Q., 2011. "Recent developments in Dual Resource Constrained (DRC) system research," European Journal of Operational Research, Elsevier, vol. 215(2), pages 309-318, December.
- Romero-Silva, Rodrigo & Shaaban, Sabry & Marsillac, Erika & Laarraf, Zouhair, 2021. "The impact of unequal processing time variability on reliable and unreliable merging line performance," International Journal of Production Economics, Elsevier, vol. 235(C).
- Olivella, Jordi & Nembhard, David, 2016. "Calibrating cross-training to meet demand mix variation and employee absence," European Journal of Operational Research, Elsevier, vol. 248(2), pages 462-472.
- Sabry Shaaban & Rodrigo Romero-Silva, 2021. "Performance of merging lines with uneven buffer capacity allocation: the effects of unreliability under different inventory-related costs," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1253-1288, December.
- Alejandro Vital-Soto & Mohammed Fazle Baki & Ahmed Azab, 2023. "A multi-objective mathematical model and evolutionary algorithm for the dual-resource flexible job-shop scheduling problem with sequencing flexibility," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 626-668, September.
- Qiansong Zhang & Yingying Zhang & Taiwen Feng, 2024. "Impacts of paradox cognition and organizational unlearning on supply chain resilience: a perspective of paradox theory," Operations Management Research, Springer, vol. 17(3), pages 1022-1038, September.
- Syed Imran Zaman & Sharfuddin Ahmed Khan & Sahar Qabool & Himanshu Gupta, 2023. "How digitalization in banking improve service supply chain resilience of e-commerce sector? a technological adoption model approach," Operations Management Research, Springer, vol. 16(2), pages 904-930, June.
- Hillier, Frederick S. & So, Kut C., 1996. "On the robustness of the bowl phenomenon," European Journal of Operational Research, Elsevier, vol. 89(3), pages 496-515, March.
- Wallace J. Hopp & Eylem Tekin & Mark P. Van Oyen, 2004. "Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers," Management Science, INFORMS, vol. 50(1), pages 83-98, January.
- Xiuli Wu & Junjian Peng & Xiao Xiao & Shaomin Wu, 2021. "An effective approach for the dual-resource flexible job shop scheduling problem considering loading and unloading," Journal of Intelligent Manufacturing, Springer, vol. 32(3), pages 707-728, March.
- Federica Costa & Alberto Portioli-Staudacher, 2021. "Labor flexibility integration in workload control in Industry 4.0 era," Operations Management Research, Springer, vol. 14(3), pages 420-433, December.
- Berti, Nicola & Finco, Serena & Battaïa, Olga & Delorme, Xavier, 2021. "Ageing workforce effects in Dual-Resource Constrained job-shop scheduling," International Journal of Production Economics, Elsevier, vol. 237(C).
- Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
- James C. Chen & Tzu-Li Chen & Yin-Yann Chen & Min-Yu Chung, 2024. "Multi-resource constrained scheduling considering process plan flexibility and lot streaming for the CNC machining industry," Flexible Services and Manufacturing Journal, Springer, vol. 36(3), pages 946-993, September.
- Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).
- Henao, César Augusto & Ferrer, Juan Carlos & Muñoz, Juan Carlos & Vera, Jorge, 2016. "Multiskilling with closed chains in a service industry: A robust optimization approach," International Journal of Production Economics, Elsevier, vol. 179(C), pages 166-178.
- Paul, Jomon Aliyas & MacDonald, Leo, 2014. "Modeling the benefits of cross-training to address the nursing shortage," International Journal of Production Economics, Elsevier, vol. 150(C), pages 83-95.
- Fügener, Andreas & Pahr, Alexander & Brunner, Jens O., 2018. "Mid-term nurse rostering considering cross-training effects," International Journal of Production Economics, Elsevier, vol. 196(C), pages 176-187.
More about this item
Keywords
Worker assignment; Heterogeneous labor force; Dual resource constrained shop; Manufacturing line balancing; Labor flexibility; Labor efficiency;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:opmare:v:16:y:2023:i:3:d:10.1007_s12063-023-00371-2. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.