IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v62y2011i4d10.1057_jors.2010.36.html
   My bibliography  Save this article

Economic statistical design for x-bar control charts under non-normal distributed data with Weibull in-control time

Author

Listed:
  • F L Chen

    (National Tsing Hua University)

  • C H Yeh

    (National Tsing Hua University)

Abstract

This paper proposes an approach which simultaneously considers the properties of cost and quality based on the Burr distribution to determine three parameters (including sample size, sampling interval between successive samples, and the control limits) when an x-bar chart monitors a manufacturing process with Weibull failure characteristic and non-normal data. Also, the cost model of Banerjee and Rahim (1988) is used as the objective function, and the probability density function of the Burr distribution is applied to derive the statistical constraints of economic statistical design of the x-bar control charts for non-normal data. The example of Banerjee and Rahim (1988) is adopted to indicate the solution procedure and sensitivity analyses. Meanwhile, the design parameters of the x-bar control charts can be obtained through the grid search method. The results show that an increase of skewness coefficient (α3) results in a slight decrease for sample size (n), but is robust to the control limit width (L). Also, an increase of kurtosis coefficient (α4) leads to a wider control limit width.

Suggested Citation

  • F L Chen & C H Yeh, 2011. "Economic statistical design for x-bar control charts under non-normal distributed data with Weibull in-control time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(4), pages 750-759, April.
  • Handle: RePEc:pal:jorsoc:v:62:y:2011:i:4:d:10.1057_jors.2010.36
    DOI: 10.1057/jors.2010.36
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/jors.2010.36
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/jors.2010.36?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chen, Huifen & Cheng, Yuyen, 2007. "Non-normality effects on the economic-statistical design of charts with Weibull in-control time," European Journal of Operational Research, Elsevier, vol. 176(2), pages 986-998, January.
    2. M. A. Rahim & P. K. Banerjee, 1993. "A generalized model for the economic design of x̄control charts for production systems with increasing failure rate and early replacement," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(6), pages 787-809, October.
    3. Hajaj Al-Oraini & M. A. Rahim, 2003. "Economic statistical design of x ¥ control charts for systems with gamma ( 5 ,2) in-control times," Journal of Applied Statistics, Taylor & Francis Journals, vol. 30(4), pages 397-409.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Reza Pourtaheri, 2022. "Economic Statistical Design for Three-level Control Charts with Variable Sample Size," Sankhya B: The Indian Journal of Statistics, Springer;Indian Statistical Institute, vol. 84(1), pages 130-145, May.
    2. Wook-Yeon Hwang, 2016. "Cluster-based artificial contrasts for inhomogeneously distributed data with an indicator variable," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5045-5055, September.
    3. M. A. Pasha & M. Bameni Moghadam & M. A. Rahim, 2020. "Effects of non-normal quality data on the integrated model of imperfect maintenance, early replacement, and economic design of $${\bar{X}}$$ X ¯ -control charts," Operational Research, Springer, vol. 20(4), pages 2519-2536, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. M. A. Pasha & M. Bameni Moghadam & M. A. Rahim, 2020. "Effects of non-normal quality data on the integrated model of imperfect maintenance, early replacement, and economic design of $${\bar{X}}$$ X ¯ -control charts," Operational Research, Springer, vol. 20(4), pages 2519-2536, December.
    2. Ching-Hsin Wang & Feng-Chia Li, 2020. "Economic design under gamma shock model of the control chart for sustainable operations," Annals of Operations Research, Springer, vol. 290(1), pages 169-190, July.
    3. Chen, Huifen & Cheng, Yuyen, 2007. "Non-normality effects on the economic-statistical design of charts with Weibull in-control time," European Journal of Operational Research, Elsevier, vol. 176(2), pages 986-998, January.
    4. Amir Ahmadi-Javid & Mohsen Ebadi, 2017. "Economic Design of Memory-Type Control Charts: The Fallacy of the Formula Proposed by Lorenzen and Vance (1986)," Papers 1708.06160, arXiv.org.
    5. Sürücü, Barış & Sazak, Hakan S., 2009. "Monitoring reliability for a three-parameter Weibull distribution," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 503-508.
    6. Shoshana Anily & Abraham Grosfeld-Nir, 2006. "An Optimal Lot-Sizing and Offline Inspection Policy in the Case of Nonrigid Demand," Operations Research, INFORMS, vol. 54(2), pages 311-323, April.
    7. Viliam Makis, 1998. "Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(2), pages 165-186, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:62:y:2011:i:4:d:10.1057_jors.2010.36. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.