A Unified Approach for Modeling and Designing Attribute Sampling Plans for Monitoring Dependent Production Processes
Author
Abstract
Suggested Citation
DOI: 10.1007/s11009-005-4519-7
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Layth C. Alwan & Harry V. Roberts, 1995. "The Problem of Misplaced Control Limits," Journal of the Royal Statistical Society Series C, Royal Statistical Society, vol. 44(3), pages 269-278, September.
- P. Vellaisamy & S. Sankar & M. Taniguchi, 2003. "Estimation and Design of Sampling Plans for Monitoring Dependent Production Processes," Methodology and Computing in Applied Probability, Springer, vol. 5(1), pages 85-108, March.
- P. Vellaisamy & S. Sankar, 2001. "Sequential and systematic sampling plans for the Markov‐dependent production process," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(6), pages 451-467, September.
- Alwan, Layth C & Roberts, Harry V, 1988. "Time-Series Modeling for Statistical Process Control," Journal of Business & Economic Statistics, American Statistical Association, vol. 6(1), pages 87-95, January.
- V. S. Sampath Kumar & M. B. Rajarshi, 1987. "Continuous sampling plans for markov‐dependent production processes," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(5), pages 629-644, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Vellaisamy, P. & Upadhye, N.S., 2007. "On the negative binomial distribution and its generalizations," Statistics & Probability Letters, Elsevier, vol. 77(2), pages 173-180, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ridley, D. & Duke, D., 2007. "Moving -window spectral model based statistical process control," International Journal of Production Economics, Elsevier, vol. 105(2), pages 492-509, February.
- Ord, J. Keith & Koehler, Anne B. & Snyder, Ralph D. & Hyndman, Rob J., 2009.
"Monitoring processes with changing variances,"
International Journal of Forecasting, Elsevier, vol. 25(3), pages 518-525, July.
- J. Keith Ord & Rob J. Hyndman & Anne B. Koehler & Ralph D. Snyder, 2008. "Monitoring Processes with Changing Variances," Monash Econometrics and Business Statistics Working Papers 4/08, Monash University, Department of Econometrics and Business Statistics.
- J. Keith Ord, 2008. "Monitoring Processes with Changing Variances," Working Papers 2008-004, The George Washington University, Department of Economics, H. O. Stekler Research Program on Forecasting.
- P. Vellaisamy & S. Sankar & M. Taniguchi, 2003. "Estimation and Design of Sampling Plans for Monitoring Dependent Production Processes," Methodology and Computing in Applied Probability, Springer, vol. 5(1), pages 85-108, March.
- Samari, Goleen & Catalano, Ralph & Alcalá, Héctor E. & Gemmill, Alison, 2020. "The Muslim Ban and preterm birth: Analysis of U.S. vital statistics data from 2009 to 2018," Social Science & Medicine, Elsevier, vol. 265(C).
- Marta Benková & Dagmar Bednárová & Gabriela Bogdanovská & Marcela Pavlíčková, 2023. "Use of Statistical Process Control for Coking Time Monitoring," Mathematics, MDPI, vol. 11(16), pages 1-30, August.
- Johannes Freiesleben & Nicolas Gu'erin, 2015. "Homogenization and Clustering as a Non-Statistical Methodology to Assess Multi-Parametrical Chain Problems," Papers 1505.03874, arXiv.org, revised Dec 2017.
- Miguel Flores & Salvador Naya & Rubén Fernández-Casal & Sonia Zaragoza & Paula Raña & Javier Tarrío-Saavedra, 2020. "Constructing a Control Chart Using Functional Data," Mathematics, MDPI, vol. 8(1), pages 1-26, January.
- Timothy M. Young & Ampalavanar Nanthakumar & Hari Nanthakumar, 2021. "On the Use of Copula for Quality Control Based on an AR(1) Model," Mathematics, MDPI, vol. 9(18), pages 1-13, September.
- Thaga K. & Kgosi P. M. & Gabaitiri L., 2007. "Max-Chart for Autocorrelated Processes," Stochastics and Quality Control, De Gruyter, vol. 22(1), pages 87-105, January.
- A. Snoussi, 2011. "SPC for short-run multivariate autocorrelated processes," Journal of Applied Statistics, Taylor & Francis Journals, vol. 38(10), pages 2303-2312.
- Žmuk Berislav, 2016. "Capabilities of Statistical Residual-Based Control Charts in Short- and Long-Term Stock Trading," Naše gospodarstvo/Our economy, Sciendo, vol. 62(1), pages 12-26, March.
- Mohamed El Ghourabi & Amira Dridi & Mohamed Limam, 2015. "A new financial stress index model based on support vector regression and control chart," Journal of Applied Statistics, Taylor & Francis Journals, vol. 42(4), pages 775-788, April.
- Gulser Koksal & Burcu Kantar & Taylan Ali Ula & Murat Caner Testik, 2008. "The effect of Phase I sample size on the run length performance of control charts for autocorrelated data," Journal of Applied Statistics, Taylor & Francis Journals, vol. 35(1), pages 67-87.
- Hwarng, H. Brian, 2001. "Insights into neural-network forecasting of time series corresponding to ARMA(p,q) structures," Omega, Elsevier, vol. 29(3), pages 273-289, June.
- Croux, C. & Gelper, S. & Mahieu, K., 2010. "Robust Control Charts for Time Series Data," Other publications TiSEM 229a21da-3d8a-4764-9d78-5, Tilburg University, School of Economics and Management.
- Aykroyd, Robert G. & Leiva, Víctor & Ruggeri, Fabrizio, 2019. "Recent developments of control charts, identification of big data sources and future trends of current research," Technological Forecasting and Social Change, Elsevier, vol. 144(C), pages 221-232.
- West, David A. & Mangiameli, Paul M. & Chen, Shaw K., 1999. "Control of complex manufacturing processes: a comparison of SPC methods with a radial basis function neural network," Omega, Elsevier, vol. 27(3), pages 349-362, June.
- Ioulia Papageorgiou, 2016. "Sampling from Correlated Populations: Optimal Strategies and Comparison Study," Sankhya B: The Indian Journal of Statistics, Springer;Indian Statistical Institute, vol. 78(1), pages 119-151, May.
- Croux, C. & Gelper, S. & Mahieu, K., 2010. "Robust Control Charts for Time Series Data," Discussion Paper 2010-107, Tilburg University, Center for Economic Research.
- Jinho Kim & Myong K. Jeong & Elsayed A. Elsayed, 2017. "Monitoring multistage processes with autocorrelated observations," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2385-2396, April.
More about this item
Keywords
production process; process monitoring; probabilistic models; designing sampling plans; average sample number; recurrence relations; acceptance probabilities; algorithms;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:metcap:v:7:y:2005:i:3:d:10.1007_s11009-005-4519-7. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.