Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Salameh, M. K. & Ghattas, R. E., 2001. "Optimal just-in-time buffer inventory for regular preventive maintenance," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 157-161, December.
- Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Lot Sizing with Machine Breakdowns," Management Science, INFORMS, vol. 38(1), pages 104-123, January.
- Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
- Ravi Anupindi & Sridhar Tayur, 1998. "Managing Stochastic Multiproduct Systems: Model, Measures, and Analysis," Operations Research, INFORMS, vol. 46(3-supplem), pages 98-111, June.
- Michael Alles & Amin Amershi & Srikant Datar & Ratna Sarkar, 2000. "Information and Incentive Effects of Inventory in JIT Production," Management Science, INFORMS, vol. 46(12), pages 1528-1544, December.
- Chelbi, Anis & Ait-Kadi, Daoud, 2004. "Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance," European Journal of Operational Research, Elsevier, vol. 156(3), pages 712-718, August.
- Julka, Nirupam & Baines, Tim & Tjahjono, Benny & Lendermann, Peter & Vitanov, Val, 2007. "A review of multi-factor capacity expansion models for manufacturing plants: Searching for a holistic decision aid," International Journal of Production Economics, Elsevier, vol. 106(2), pages 607-621, April.
- T W Sloan, 2004. "A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(6), pages 647-656, June.
- Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
- Chelbi, Anis & Rezg, Nidhal, 2006. "Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 131-143, February.
- Dohi, Tadashi & Okamura, Hiroyuki & Osaki, Shunji, 2001. "Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 147-155, December.
- Chou, Yon-Chun & Cheng, C.-T. & Yang, Feng-Cheng & Liang, Yi-Yu, 2007. "Evaluating alternative capacity strategies in semiconductor manufacturing under uncertain demand and price scenarios," International Journal of Production Economics, Elsevier, vol. 105(2), pages 591-606, February.
- Van der Duyn Schouten, F. A. & Vanneste, S. G., 1995. "Maintenance optimization of a production system with buffer capacity," European Journal of Operational Research, Elsevier, vol. 82(2), pages 323-338, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Fritzsche, R. & Gupta, J.N.D. & Lasch, R., 2014. "Optimal prognostic distance to minimize total maintenance cost: The case of the airline industry," International Journal of Production Economics, Elsevier, vol. 151(C), pages 76-88.
- A. Azadeh & M. Sheikhalishahi & S. Mortazavi & E. Ahmadi Jooghi, 2017. "Joint quality control and preventive maintenance strategy: a unique taguchi approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 123-134, March.
- Wang, Jingjing & Yang, Li & Ma, Xiaobing & Peng, Rui, 2021. "Joint optimization of multi-window maintenance and spare part provisioning policies for production systems," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
- Caro-Ruiz, C. & Lombardi, P. & Richter, M. & Pelzer, A. & Komarnicki, P. & Pavas, A. & Mojica-Nava, E., 2019. "Coordination of optimal sizing of energy storage systems and production buffer stocks in a net zero energy factory," Applied Energy, Elsevier, vol. 238(C), pages 851-862.
- Berrade, M.D. & Scarf, P.A. & Cavalcante, C.A.V., 2017. "A study of postponed replacement in a delay time model," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 70-79.
- Bertazzi, Luca, 2011. "Determining the optimal dimension of a work-in-process storage area," International Journal of Production Economics, Elsevier, vol. 131(2), pages 483-489, June.
- Zhai, Yue & Choi, Tsan-Ming & Shao, Saijun & Xu, Su Xiu & Huang, George Q., 2020. "Spatial-temporal hedging coordination in prefabricated housing production," International Journal of Production Economics, Elsevier, vol. 229(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Dhouib, K. & Gharbi, A. & Ben Aziza, M.N., 2012. "Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell," International Journal of Production Economics, Elsevier, vol. 137(1), pages 126-136.
- Thomas Sloan, 2008. "Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(2), pages 116-129, March.
- Borrero, J.S. & Akhavan-Tabatabaei, R., 2013. "Time and inventory dependent optimal maintenance policies for single machine workstations: An MDP approach," European Journal of Operational Research, Elsevier, vol. 228(3), pages 545-555.
- Bertazzi, Luca, 2011. "Determining the optimal dimension of a work-in-process storage area," International Journal of Production Economics, Elsevier, vol. 131(2), pages 483-489, June.
- Karamatsoukis, C.C. & Kyriakidis, E.G., 2010. "Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer," European Journal of Operational Research, Elsevier, vol. 207(1), pages 297-308, November.
- Souheil Ayed & Zied Hajej & Sadok Turki & Nidhal Rezg, 2017. "FPA method for optimal production planning under availability/degradation machine and subcontracting constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2135-2148, April.
- Dimitrakos, T.D. & Kyriakidis, E.G., 2008. "A semi-Markov decision algorithm for the maintenance of a production system with buffer capacity and continuous repair times," International Journal of Production Economics, Elsevier, vol. 111(2), pages 752-762, February.
- A. Azadeh & M. Sheikhalishahi & S. Mortazavi & E. Ahmadi Jooghi, 2017. "Joint quality control and preventive maintenance strategy: a unique taguchi approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 123-134, March.
- Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
- Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
- Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
- Berthaut, F. & Gharbi, A. & Kenné, J.-P. & Boulet, J.-F., 2010. "Improved joint preventive maintenance and hedging point policy," International Journal of Production Economics, Elsevier, vol. 127(1), pages 60-72, September.
- Chelbi, Anis & Ait-Kadi, Daoud, 2004. "Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance," European Journal of Operational Research, Elsevier, vol. 156(3), pages 712-718, August.
- Nabil Nahas, 2017. "Buffer allocation and preventive maintenance optimization in unreliable production lines," Journal of Intelligent Manufacturing, Springer, vol. 28(1), pages 85-93, January.
- Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
- Jin, Xiaoning & Li, Lin & Ni, Jun, 2009. "Option model for joint production and preventive maintenance system," International Journal of Production Economics, Elsevier, vol. 119(2), pages 347-353, June.
- Budai-Balke, G. & Dekker, R. & Nicolai, R.P., 2006. "A review of planning models for maintenance and production," Econometric Institute Research Papers EI 2006-44, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- El-Ferik, Sami, 2008. "Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy," European Journal of Operational Research, Elsevier, vol. 186(1), pages 150-163, April.
- Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
- Maria Chiara Magnanini & Tullio Tolio, 2020. "Switching- and hedging- point policy for preventive maintenance with degrading machines: application to a two-machine line," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 241-271, June.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:111:y:2008:i:2:p:686-696. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.