There is an increased use of production assurance programmes in various industries, especially in the petroleum sector. The programme describes the production assurance activities necessary to fulfil the objectives, how they will be carried out, by whom, and when. The activities provide input to decisions regarding concept, design, manufacturing, construction, installation, operation, and maintenance. However, production assurance programmes have not yet been sufficiently developed for general use. It is a challenge to implement and apply such programmes in a practical setting. There is a lack of implementation guidelines. The purpose of the current paper is to meet these challenges; the paper describes and discusses a methodology that facilitates implementation of production assurance programmes in a production plant. The starting point is the offshore oil and gas industry, but the methodology and discussion are to a large extent general and could also be applied in other industries.

Suggested Citation

  • J Barabady & T Aven, 2008. "A methodology for the implementation of production assurance programmes in production plants," Journal of Risk and Reliability, , vol. 222(3), pages 283-290, September.
  • Handle: RePEc:sae:risrel:v:222:y:2008:i:3:p:283-290
    DOI: 10.1243/1748006XJRR105
    as

    Download full text from publisher

    File URL: https://journals.sagepub.com/doi/10.1243/1748006XJRR105
    Download Restriction: no

    File URL: https://libkey.io/10.1243/1748006XJRR105?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Hjorteland, A. & Aven, T. & Østebø, R., 2007. "Uncertainty treatment in production assurance analyses throughout the various phases of a project," Reliability Engineering and System Safety, Elsevier, vol. 92(10), pages 1315-1320.
    2. Fawcett, Stanley E. & Calantone, Roger & Smith, Sheldon R., 1997. "Delivery capability and firm performance in international operations," International Journal of Production Economics, Elsevier, vol. 51(3), pages 191-204, September.
    3. Aven, Terje & Vinnem, Jan Erik, 2005. "On the use of risk acceptance criteria in the offshore oil and gas industry," Reliability Engineering and System Safety, Elsevier, vol. 90(1), pages 15-24.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Moura Carneiro, F.O. & Barbosa Rocha, H.H. & Costa Rocha, P.A., 2013. "Investigation of possible societal risk associated with wind power generation systems," Renewable and Sustainable Energy Reviews, Elsevier, vol. 19(C), pages 30-36.
    2. Terje Aven, 2012. "Foundational Issues in Risk Assessment and Risk Management," Risk Analysis, John Wiley & Sons, vol. 32(10), pages 1647-1656, October.
    3. Nam, Kiil & Chang, Daejun & Chang, Kwangpil & Rhee, Taejin & Lee, In-Beum, 2011. "Methodology of life cycle cost with risk expenditure for offshore process at conceptual design stage," Energy, Elsevier, vol. 36(3), pages 1554-1563.
    4. Aven, Terje, 2013. "Practical implications of the new risk perspectives," Reliability Engineering and System Safety, Elsevier, vol. 115(C), pages 136-145.
    5. Koufteros, Xenophon & Lu, Guanyi & Peters, Richard C. & Lai, Kee-hung & Wong, Christina W.Y. & Edwin Cheng, T.C., 2014. "Product development practices, manufacturing practices, and performance: A mediational perspective," International Journal of Production Economics, Elsevier, vol. 156(C), pages 83-97.
    6. St. John, Caron H. & Young, Scott T. & Miller, Janis L., 1999. "Coordinating manufacturing and marketing in international firms," Journal of World Business, Elsevier, vol. 34(2), pages 109-127, July.
    7. Sørskår, Leif Inge K. & Selvik, Jon T. & Abrahamsen, Eirik B., 2019. "On the use of the vision zero principle and the ALARP principle for production loss in the oil and gas industry," Reliability Engineering and System Safety, Elsevier, vol. 191(C).
    8. Lorentz, Harri & Kittipanya-ngam, Pichawadee & Singh Srai, Jagjit, 2013. "Emerging market characteristics and supply network adjustments in internationalising food supply chains," International Journal of Production Economics, Elsevier, vol. 145(1), pages 220-232.
    9. Sujan, Mark A. & Habli, Ibrahim & Kelly, Tim P. & Gühnemann, Astrid & Pozzi, Simone & Johnson, Christopher W., 2017. "How can health care organisations make and justify decisions about risk reduction? Lessons from a cross-industry review and a health care stakeholder consensus development process," Reliability Engineering and System Safety, Elsevier, vol. 161(C), pages 1-11.
    10. Cerqueti, Roy & Lupi, Claudio, 2015. "Consistent Risk Acceptance Criteria through Networks," Economics & Statistics Discussion Papers esdp15076, University of Molise, Department of Economics.
    11. Wong, David T.W. & Ngai, Eric W.T., 2023. "The impact of advanced manufacturing technology, sensing and analytics capabilities, and planning comprehensiveness on sustained competitive advantage: The moderating role of environmental uncertainty," International Journal of Production Economics, Elsevier, vol. 265(C).
    12. Su-Han Woo & Stephen Pettit, 2011. "Port Performance in Changing Logistics Environments: Measurement Development and Model Testing," Chapters, in: Kevin Cullinane (ed.), International Handbook of Maritime Economics, chapter 20, Edward Elgar Publishing.
    13. Ali N Qarahasanlou & Abbas Barabadi & Yonas Z Ayele, 2018. "Production performance analysis during operation phase: A case study," Journal of Risk and Reliability, , vol. 232(6), pages 559-575, December.
    14. Ersdal, Gerhard & Aven, Terje, 2008. "Risk informed decision-making and its ethical basis," Reliability Engineering and System Safety, Elsevier, vol. 93(2), pages 197-205.
    15. Kumar, Sourabh & Kumar Barua, Mukesh, 2022. "Modeling and investigating the interaction among risk factors of the sustainable petroleum supply chain," Resources Policy, Elsevier, vol. 79(C).
    16. Abrahamsen, Eirik Bjorheim & Aven, Terje, 2012. "Why risk acceptance criteria need to be defined by the authorities and not the industry?," Reliability Engineering and System Safety, Elsevier, vol. 105(C), pages 47-50.
    17. Sheth, Jagdish N. & Parvatiyar, Atul & Sinha, Mona, 2012. "The conceptual foundations of relationship marketing: Review and synthesis," economic sociology. perspectives and conversations, Max Planck Institute for the Study of Societies, vol. 13(3), pages 4-26.
    18. Tolonen, Arto & Haapasalo, Harri & Harkonen, Janne & Verrollot, Jordan, 2017. "Supply chain capability creation – The creation of the supply chain readiness for a new product during product development process," International Journal of Production Economics, Elsevier, vol. 194(C), pages 237-245.
    19. Tang, Yang & Liu, Qingyou & Jing, Jiajia & Yang, Yan & Zou, Zhengwei, 2017. "A framework for identification of maintenance significant items in reliability centered maintenance," Energy, Elsevier, vol. 118(C), pages 1295-1303.
    20. J. E. Vinnem & T Aven, 2006. "Case illustration of a decision framework for health, environment, and safety management," Journal of Risk and Reliability, , vol. 220(2), pages 115-121, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:sae:risrel:v:222:y:2008:i:3:p:283-290. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: SAGE Publications (email available below). General contact details of provider: .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.