IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v61y2010i4d10.1057_jors.2008.184.html
   My bibliography  Save this article

Parallel machine scheduling with common due windows

Author

Listed:
  • R-H Huang

    (Fu Jen Catholic University)

  • C-L Yang

    (Fu Jen Catholic University)

  • H-T Huang

    (Fu Jen Catholic University)

Abstract

With the prevalence of on-time scheduling, timely product submission has become a crucial contributor to customer satisfaction. Studies examining on-time scheduling primarily seek to determine the minimum weighted sum of earliness and tardiness penalties. This study assumes that all machines are identical. Furthermore, this study assumes that jobs are independent and share a common due date window when investigating scheduling problems involving parallel machines with a minimum total number of early and tardy jobs (or maximum number of on-time jobs). This study presents related theorems and a novel simplified algorithm based on the problem. Additionally, rule characteristics are examined, and simulated data are used to verify the effectiveness and timeliness of the proposed algorithm. The theoretical proof and data test results all indicate that the proposed approach obtains the best solution within the shortest time.

Suggested Citation

  • R-H Huang & C-L Yang & H-T Huang, 2010. "Parallel machine scheduling with common due windows," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(4), pages 640-646, April.
  • Handle: RePEc:pal:jorsoc:v:61:y:2010:i:4:d:10.1057_jors.2008.184
    DOI: 10.1057/jors.2008.184
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/jors.2008.184
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/jors.2008.184?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chen, Zhi-Long & Lee, Chung-Yee, 2002. "Parallel machine scheduling with a common due window," European Journal of Operational Research, Elsevier, vol. 136(3), pages 512-527, February.
    2. Lin, B.M.T. & Kononov, A.V., 2007. "Customer order scheduling to minimize the number of late jobs," European Journal of Operational Research, Elsevier, vol. 183(2), pages 944-948, December.
    3. G Mosheiov, 2003. "Due-date assignment with asymmetric earliness–tardiness cost," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(11), pages 1222-1224, November.
    4. T C E Cheng & L Kang & C T Ng, 2004. "Due-date assignment and single machine scheduling with deteriorating jobs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(2), pages 198-203, February.
    5. J N D Gupta & A J Ruiz-torres & S Webster, 2003. "Minimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(12), pages 1263-1274, December.
    6. W L Pearn & S H Chung & M H Yang & Y H Chen, 2004. "Algorithms for the wafer probing scheduling problem with sequence-dependent set-up time and due date restrictions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(11), pages 1194-1207, November.
    7. Brian Thomas Eck & Michael Pinedo, 1993. "On the Minimization of the Makespan Subject to Flowtime Optimality," Operations Research, INFORMS, vol. 41(4), pages 797-801, August.
    8. Armentano, Vinicius Amaral & de Franca Filho, Moacir Felizardo, 2007. "Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach," European Journal of Operational Research, Elsevier, vol. 183(1), pages 100-114, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Huang, Rong-Hwa & Yang, Chang-Lin & Cheng, Wei-Che, 2013. "Flexible job shop scheduling with due window—a two-pheromone ant colony approach," International Journal of Production Economics, Elsevier, vol. 141(2), pages 685-697.
    2. Janiak, Adam & Janiak, Władysław A. & Krysiak, Tomasz & Kwiatkowski, Tomasz, 2015. "A survey on scheduling problems with due windows," European Journal of Operational Research, Elsevier, vol. 242(2), pages 347-357.
    3. Gerstl, Enrique & Mosheiov, Gur, 2013. "Due-window assignment with identical jobs on parallel uniform machines," European Journal of Operational Research, Elsevier, vol. 229(1), pages 41-47.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    2. W-H Kuo & D-L Yang, 2008. "A note on due-date assignment and single-machine scheduling with deteriorating jobs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(6), pages 857-859, June.
    3. Goodson, Justin C. & Ohlmann, Jeffrey W. & Thomas, Barrett W., 2012. "Cyclic-order neighborhoods with application to the vehicle routing problem with stochastic demand," European Journal of Operational Research, Elsevier, vol. 217(2), pages 312-323.
    4. Federico Della Croce & Christos Koulamas & Vincent T’kindt, 2017. "Minimizing the number of tardy jobs in two-machine settings with common due date," Journal of Combinatorial Optimization, Springer, vol. 34(1), pages 133-140, July.
    5. Husam Dauod & Nieqing Cao & Debiao Li & Jaehee Kim & Sang Won Yoon & Daehan Won, 2023. "An Order Scheduling Heuristic to Minimize the Total Collation Delays and the Makespan in High-Throughput Make-to-Order Manufacturing Systems," SN Operations Research Forum, Springer, vol. 4(2), pages 1-23, June.
    6. Kyriakakis, Nikolaos A. & Marinaki, Magdalene & Matsatsinis, Nikolaos & Marinakis, Yannis, 2022. "A cumulative unmanned aerial vehicle routing problem approach for humanitarian coverage path planning," European Journal of Operational Research, Elsevier, vol. 300(3), pages 992-1004.
    7. Absalom E Ezugwu & Olawale J Adeleke & Serestina Viriri, 2018. "Symbiotic organisms search algorithm for the unrelated parallel machines scheduling with sequence-dependent setup times," PLOS ONE, Public Library of Science, vol. 13(7), pages 1-23, July.
    8. Qian, Jianbo & Steiner, George, 2013. "Fast algorithms for scheduling with learning effects and time-dependent processing times on a single machine," European Journal of Operational Research, Elsevier, vol. 225(3), pages 547-551.
    9. Yurong Zhang & Xi Wang & Li-Han Zhang & Xue Jia & Ji-Bo Wang, 2024. "Different due-window assignment scheduling with deterioration effects," Journal of Combinatorial Optimization, Springer, vol. 48(5), pages 1-21, December.
    10. Shirvani, Nargess & Ruiz, Rubén & Shadrokh, Shahram, 2014. "Cyclic scheduling of perishable products in parallel machine with release dates, due dates and deadlines," International Journal of Production Economics, Elsevier, vol. 156(C), pages 1-12.
    11. Qian, Fubin & Strusevich, Vitaly & Gribkovskaia, Irina & Halskau, Øyvind, 2015. "Minimization of passenger takeoff and landing risk in offshore helicopter transportation: Models, approaches and analysis," Omega, Elsevier, vol. 51(C), pages 93-106.
    12. Gupta, Jatinder N. D. & Ruiz-Torres, Alex J., 2000. "Minimizing makespan subject to minimum total flow-time on identical parallel machines," European Journal of Operational Research, Elsevier, vol. 125(2), pages 370-380, September.
    13. Li, Yongqiang & Li, Gang & Sun, Linyan & Xu, Zhiyong, 2009. "Single machine scheduling of deteriorating jobs to minimize total absolute differences in completion times," International Journal of Production Economics, Elsevier, vol. 118(2), pages 424-429, April.
    14. Monch, Lars & Schabacker, Rene & Pabst, Detlef & Fowler, John W., 2007. "Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops," European Journal of Operational Research, Elsevier, vol. 177(3), pages 2100-2118, March.
    15. Feng Li & Zhi-Long Chen & Zhi-Long Chen, 2017. "Integrated Production, Inventory and Delivery Problems: Complexity and Algorithms," INFORMS Journal on Computing, INFORMS, vol. 29(2), pages 232-250, May.
    16. Min Kong & Xinbao Liu & Jun Pei & Panos M. Pardalos & Nenad Mladenovic, 2020. "Parallel-batching scheduling with nonlinear processing times on a single and unrelated parallel machines," Journal of Global Optimization, Springer, vol. 78(4), pages 693-715, December.
    17. Pereira Lopes, Manuel J. & de Carvalho, J.M. Valerio, 2007. "A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1508-1527, February.
    18. Hesaraki, Alireza F. & Dellaert, Nico P. & de Kok, Ton, 2019. "Generating outpatient chemotherapy appointment templates with balanced flowtime and makespan," European Journal of Operational Research, Elsevier, vol. 275(1), pages 304-318.
    19. Zong-Jun Wei & Li-Yan Wang & Lei Zhang & Ji-Bo Wang & Ershen Wang, 2023. "Single-Machine Maintenance Activity Scheduling with Convex Resource Constraints and Learning Effects," Mathematics, MDPI, vol. 11(16), pages 1-21, August.
    20. Dvir Shabtay, 2023. "A new perspective on single-machine scheduling problems with late work related criteria," Annals of Operations Research, Springer, vol. 322(2), pages 947-966, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:61:y:2010:i:4:d:10.1057_jors.2008.184. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.