Facets and Reformulations for Solving Production Planning With Changeover Costs
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.50.4.708.2861
Download full text from publisher
References listed on IDEAS
- Gary D. Eppen & R. Kipp Martin, 1987. "Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition," Operations Research, INFORMS, vol. 35(6), pages 832-848, December.
- Laurence A. Wolsey, 1989. "Uncapacitated Lot-Sizing Problems with Start-Up Costs," Operations Research, INFORMS, vol. 37(5), pages 741-747, October.
- van Hoesel, Stan & Kolen, Antoon, 1994. "A linear description of the discrete lot-sizing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 75(2), pages 342-353, June.
- T. L. Magnanti & R. Vachani, 1990. "A Strong Cutting Plane Algorithm for Production Scheduling with Changeover Costs," Operations Research, INFORMS, vol. 38(3), pages 456-473, June.
- Pochet, Y. & Wolsey, L. A., 1995. "Algorithms and reformulations for lot sizing problems," LIDAM Reprints CORE 1160, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Uday S. Karmarkar & Linus Schrage, 1985. "The Deterministic Dynamic Product Cycling Problem," Operations Research, INFORMS, vol. 33(2), pages 326-345, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Mütze, Torsten, 2014. "Scheduling with few changes," European Journal of Operational Research, Elsevier, vol. 236(1), pages 37-50.
- Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
- Christopher Suerie & Hartmut Stadtler, 2003. "The Capacitated Lot-Sizing Problem with Linked Lot Sizes," Management Science, INFORMS, vol. 49(8), pages 1039-1054, August.
- Laurence A. Wolsey, 2002. "Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation," Management Science, INFORMS, vol. 48(12), pages 1587-1602, December.
- BELVAUX, Gaetan & WOLSEY, Laurence A., 1998. "Lot-sizing problems: modelling issues and a specialized branch-and-cut system BC-PROD," LIDAM Discussion Papers CORE 1998049, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Drexl, Andreas & Haase, Knut, 1992. "A new type of model for multi-item capacitated dynamic lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 286, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Karina Copil & Martin Wörbelauer & Herbert Meyr & Horst Tempelmeier, 2017. "Simultaneous lotsizing and scheduling problems: a classification and review of models," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 1-64, January.
- Wolsey, Laurence A., 1997. "MIP modelling of changeovers in production planning and scheduling problems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 154-165, May.
- François Vanderbeck, 1998. "Lot-Sizing with Start-Up Times," Management Science, INFORMS, vol. 44(10), pages 1409-1425, October.
- Gaetan Belvaux & Laurence A. Wolsey, 2000. "bc --- prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems," Management Science, INFORMS, vol. 46(5), pages 724-738, May.
- Kimms, Alf & Drexl, Andreas, 1996. "Shortcomings of MRP II and a new planning meta-method," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 404, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Francesco Gaglioppa & Lisa A. Miller & Saif Benjaafar, 2008. "Multitask and Multistage Production Planning and Scheduling for Process Industries," Operations Research, INFORMS, vol. 56(4), pages 1010-1025, August.
- Andrea Raiconi & Julia Pahl & Monica Gentili & Stefan Voß & Raffaele Cerulli, 2017. "Tactical Production and Lot Size Planning with Lifetime Constraints: A Comparison of Model Formulations," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(05), pages 1-24, October.
- BELVAUX, Gaetan & WOLSEY, Laurence A., 2000. "Modelling practical lot-sizing problems as mixed integer programs," LIDAM Discussion Papers CORE 2000009, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Drexl, Andreas & Haase, Knut, 1995. "Proportional lotsizing and scheduling," International Journal of Production Economics, Elsevier, vol. 40(1), pages 73-87, June.
- Kimms, Alf, 1996. "Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 418, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Silvio Alexandre de Araujo & Bert De Reyck & Zeger Degraeve & Ioannis Fragkos & Raf Jans, 2015. "Period Decompositions for the Capacitated Lot Sizing Problem with Setup Times," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 431-448, August.
- Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Drexl, Andreas & Jordan, Carsten & Kimms, Alf, 1997. "Gruppierungs- und Reihenfolgeprobleme in der Fertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 447, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- van Eijl, C.A. & van Hoesel, C.P.M., 1995. "On the discrete lot-sizing and scheduling problem with Wagner-Whitin costs," Research Memorandum 018, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
- Gothe-Lundgren, Maud & T. Lundgren, Jan & A. Persson, Jan, 2002. "An optimization model for refinery production scheduling," International Journal of Production Economics, Elsevier, vol. 78(3), pages 255-270, August.
More about this item
Keywords
Valid inequalities; facets; lotsizing;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:50:y:2002:i:4:p:708-719. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.