Lot-sizing problems: modelling issues and a specialized branch-and-cut system BC-PROD
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Laurence A. Wolsey, 1989. "Uncapacitated Lot-Sizing Problems with Start-Up Costs," Operations Research, INFORMS, vol. 37(5), pages 741-747, October.
- Fleischmann, Bernhard, 1994. "The discrete lot-sizing and scheduling problem with sequence-dependent setup costs," European Journal of Operational Research, Elsevier, vol. 75(2), pages 395-404, June.
- Moustapha Diaby & Harish C. Bahl & Mark H. Karwan & Stanley Zionts, 1992. "A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing," Management Science, INFORMS, vol. 38(9), pages 1329-1340, September.
- Wolsey, L. A., 1997. "MIP modelling of changeovers in production planning and scheduling problems," LIDAM Reprints CORE 1271, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Kuik, Roelof & Salomon, Marc & van Wassenhove, Luk N., 1994. "Batching decisions: structure and models," European Journal of Operational Research, Elsevier, vol. 75(2), pages 243-263, June.
- GüNLüCK, Oktay & POCHET, Yves, 1998. "Mixing mixed-integer inequalities," LIDAM Discussion Papers CORE 1998011, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Yves Pochet & Laurence A. Wolsey, 1991. "Solving Multi-Item Lot-Sizing Problems Using Strong Cutting Planes," Management Science, INFORMS, vol. 37(1), pages 53-67, January.
- Cattrysse, Dirk & Maes, Johan & Van Wassenhove, Luk N., 1990. "Set partitioning and column generation heuristics for capacitated dynamic lotsizing," European Journal of Operational Research, Elsevier, vol. 46(1), pages 38-47, May.
- Elena Katok & Holly S. Lewis & Terry P. Harrison, 1998. "Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources," Management Science, INFORMS, vol. 44(6), pages 859-877, June.
- POCHET, Yves & WOLSEY, Laurence A., 1993. "Lot-sizing with constant batches: formulation and valid inequalities," LIDAM Reprints CORE 1066, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- T. L. Magnanti & R. Vachani, 1990. "A Strong Cutting Plane Algorithm for Production Scheduling with Changeover Costs," Operations Research, INFORMS, vol. 38(3), pages 456-473, June.
- Pochet, Y. & Wolsey, L. A., 1995. "Algorithms and reformulations for lot sizing problems," LIDAM Reprints CORE 1160, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Fleischmann, Bernhard, 1990. "The discrete lot-sizing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 44(3), pages 337-348, February.
- Wolsey, Laurence A., 1997. "MIP modelling of changeovers in production planning and scheduling problems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 154-165, May.
- Imre Barany & Tony J. Van Roy & Laurence A. Wolsey, 1984. "Strong Formulations for Multi-Item Capacitated Lot Sizing," Management Science, INFORMS, vol. 30(10), pages 1255-1261, October.
- Uday S. Karmarkar & Linus Schrage, 1985. "The Deterministic Dynamic Product Cycling Problem," Operations Research, INFORMS, vol. 33(2), pages 326-345, April.
- Yves Pochet & Laurence A. Wolsey, 1993. "Lot-Sizing with Constant Batches: Formulation and Valid Inequalities," Mathematics of Operations Research, INFORMS, vol. 18(4), pages 767-785, November.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- MILLER, Andrew & NEMHAUSER, George & SAVELSBERGH, Martin, 2000. "Solving multi-item capacitated lot-sizing problems with setup times by branch-and-cut," LIDAM Discussion Papers CORE 2000039, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- BELVAUX, Gaetan & WOLSEY, Laurence A., 2000. "Modelling practical lot-sizing problems as mixed integer programs," LIDAM Discussion Papers CORE 2000009, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
- Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Gaetan Belvaux & Laurence A. Wolsey, 2000. "bc --- prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems," Management Science, INFORMS, vol. 46(5), pages 724-738, May.
- BELVAUX, Gaetan & WOLSEY, Laurence A., 2000. "Modelling practical lot-sizing problems as mixed integer programs," LIDAM Discussion Papers CORE 2000009, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Gaetan Belvaux & Laurence A. Wolsey, 2001. "Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs," Management Science, INFORMS, vol. 47(7), pages 993-1007, July.
- Laurence A. Wolsey, 2002. "Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation," Management Science, INFORMS, vol. 48(12), pages 1587-1602, December.
- Wolsey, Laurence A., 1995. "Progress with single-item lot-sizing," European Journal of Operational Research, Elsevier, vol. 86(3), pages 395-401, November.
- François Vanderbeck, 1998. "Lot-Sizing with Start-Up Times," Management Science, INFORMS, vol. 44(10), pages 1409-1425, October.
- Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
- Francesco Gaglioppa & Lisa A. Miller & Saif Benjaafar, 2008. "Multitask and Multistage Production Planning and Scheduling for Process Industries," Operations Research, INFORMS, vol. 56(4), pages 1010-1025, August.
- Karina Copil & Martin Wörbelauer & Herbert Meyr & Horst Tempelmeier, 2017. "Simultaneous lotsizing and scheduling problems: a classification and review of models," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 1-64, January.
- Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
- Drexl, Andreas & Haase, Knut, 1992. "A new type of model for multi-item capacitated dynamic lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 286, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Meyr, H., 2000. "Simultaneous lotsizing and scheduling by combining local search with dual reoptimization," European Journal of Operational Research, Elsevier, vol. 120(2), pages 311-326, January.
- Drexl, Andreas & Haase, Knut, 1995. "Proportional lotsizing and scheduling," International Journal of Production Economics, Elsevier, vol. 40(1), pages 73-87, June.
- Drexl, Andreas & Kimms, Alf, 1996. "Lot sizing and scheduling: Survey and extensions," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 421, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Absi, Nabil & Kedad-Sidhoum, Safia, 2008. "The multi-item capacitated lot-sizing problem with setup times and shortage costs," European Journal of Operational Research, Elsevier, vol. 185(3), pages 1351-1374, March.
- Yves Pochet & Mathieu Van Vyve, 2004. "A General Heuristic for Production Planning Problems," INFORMS Journal on Computing, INFORMS, vol. 16(3), pages 316-327, August.
- Christopher Suerie & Hartmut Stadtler, 2003. "The Capacitated Lot-Sizing Problem with Linked Lot Sizes," Management Science, INFORMS, vol. 49(8), pages 1039-1054, August.
- Kimms, Alf, 1996. "Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 418, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
More about this item
Keywords
lot-sizing; production planning; integer programming; modelling system; branch-and-cut.;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:cor:louvco:1998049. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Alain GILLIS (email available below). General contact details of provider: https://edirc.repec.org/data/coreebe.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.