Comparison of dynamic scheduling policies for hybrid make-to-order and make-to-stock production systems with stochastic demand
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Awi Federgruen & Ziv Katalan, 1999. "The Impact of Adding a Make-to-Order Item to a Make-to-Stock Production System," Management Science, INFORMS, vol. 45(7), pages 980-994, July.
- Robert C. Leachman & André Gascon, 1988. "A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands," Management Science, INFORMS, vol. 34(3), pages 377-390, March.
- S. Rajagopalan, 2002. "Make to Order or Make to Stock: Model and Application," Management Science, INFORMS, vol. 48(2), pages 241-256, February.
- Sox, Charles R. & Jackson, Peter L. & Bowman, Alan & Muckstadt, John A., 1999. "A review of the stochastic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 62(3), pages 181-200, September.
- Soman, Chetan Anil & van Donk, Dirk Pieter & Gaalman, Gerard, 2004. "Combined make-to-order and make-to-stock in a food production system," International Journal of Production Economics, Elsevier, vol. 90(2), pages 223-235, July.
- Wen-Lian Hsu, 1983. "On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine," Management Science, INFORMS, vol. 29(1), pages 93-105, January.
- HSU, Wen-Lian, 1983. "On the general feasibility test of scheduling lot sizes for several products on one machine," LIDAM Reprints CORE 515, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- C. Loren Doll & D. Clay Whybark, 1973. "An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling Problem," Management Science, INFORMS, vol. 20(1), pages 50-55, September.
- Williams, T. M., 1984. "Special products and uncertainty in production/inventory systems," European Journal of Operational Research, Elsevier, vol. 15(1), pages 46-54, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2017. "Flexible lot sizing in hybrid make-to-order/make-to-stock production planning," European Journal of Operational Research, Elsevier, vol. 260(3), pages 1014-1023.
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Integrating make-to-order and make-to-stock in job shop control," International Journal of Production Economics, Elsevier, vol. 185(C), pages 1-10.
- Helia Yousefnejad & Maryam Esmaeili, 2020. "Tactical production planning in a hybrid MTS/MTO system using Stackelberg game," Operational Research, Springer, vol. 20(3), pages 1791-1809, September.
- Iman Ghalehkhondabi & Dusan Sormaz & Gary Weckman, 2016. "Multiple customer order decoupling points within a hybrid MTS/MTO manufacturing supply chain with uncertain demands in two consecutive echelons," OPSEARCH, Springer;Operational Research Society of India, vol. 53(4), pages 976-997, December.
- Dieter Fiems & Eline De Cuypere & Koen De Turck & Dieter Claeys, 2020. "Performance Analysis of Hybrid MTS/MTO Systems with Stochastic Demand and Production," Mathematics, MDPI, vol. 8(11), pages 1-16, November.
- Sharda, Bikram & Akiya, Naoko, 2012. "Selecting make-to-stock and postponement policies for different products in a chemical plant: A case study using discrete event simulation," International Journal of Production Economics, Elsevier, vol. 136(1), pages 161-171.
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Reprint of “Integrating make-to-order and make-to-stock in job shop control”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 3-12.
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2016. "Hybrid MTO-MTS production planning: An explorative study," European Journal of Operational Research, Elsevier, vol. 248(2), pages 453-461.
- Sato, Yutaro & Maeda, Hiroyuki & Toshima, Ryusei & Nagasawa, Keisuke & Morikawa, Katsumi & Takahashi, Katsuhiko, 2023. "Switching decisions in a hybrid MTS/MTO production system comprising multiple machines considering setup," International Journal of Production Economics, Elsevier, vol. 263(C).
- Luo, Hao & Yang, Xuan & Kong, Xiang T.R., 2019. "A synchronized production-warehouse management solution for reengineering the online-offline integrated order fulfillment," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 211-230.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2016. "Hybrid MTO-MTS production planning: An explorative study," European Journal of Operational Research, Elsevier, vol. 248(2), pages 453-461.
- Winands, E.M.M. & Adan, I.J.B.F. & van Houtum, G.J., 2011. "The stochastic economic lot scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 210(1), pages 1-9, April.
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2017. "Flexible lot sizing in hybrid make-to-order/make-to-stock production planning," European Journal of Operational Research, Elsevier, vol. 260(3), pages 1014-1023.
- Garn, Wolfgang & Aitken, James, 2015. "Agile factorial production for a single manufacturing line with multiple products," European Journal of Operational Research, Elsevier, vol. 245(3), pages 754-766.
- Zhang, Zhe George & Kim, Ilhyung & Springer, Mark & Cai, Gangshu (George) & Yu, Yugang, 2013. "Dynamic pooling of make-to-stock and make-to-order operations," International Journal of Production Economics, Elsevier, vol. 144(1), pages 44-56.
- Vidal-Carreras, Pilar I. & Garcia-Sabater, Jose P. & Coronado-Hernandez, Jairo R., 2012. "Economic lot scheduling with deliberated and controlled coproduction," European Journal of Operational Research, Elsevier, vol. 219(2), pages 396-404.
- Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
- Tang, Loon Ching & Lee, Loo Hay, 2005. "A simple recovery strategy for economic lot scheduling problem: A two-product case," International Journal of Production Economics, Elsevier, vol. 98(1), pages 97-107, October.
- Holmbom, Martin & Segerstedt, Anders, 2014. "Economic Order Quantities in production: From Harris to Economic Lot Scheduling Problems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 82-90.
- Martínez-Olvera, César, 2009. "Benefits of using hybrid business models within a supply chain," International Journal of Production Economics, Elsevier, vol. 120(2), pages 501-511, August.
- Sato, Yutaro & Maeda, Hiroyuki & Toshima, Ryusei & Nagasawa, Keisuke & Morikawa, Katsumi & Takahashi, Katsuhiko, 2023. "Switching decisions in a hybrid MTS/MTO production system comprising multiple machines considering setup," International Journal of Production Economics, Elsevier, vol. 263(C).
- Robert R. Inman & Philip C. Jones & Guillermo M. Gallego, 1991. "Economic lot scheduling of fully loaded processes with external setups," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 699-713, October.
- Kerkkanen, Annastiina, 2007. "Determining semi-finished products to be stocked when changing the MTS-MTO policy: Case of a steel mill," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 111-118, July.
- Soman, Chetan Anil & Donk, Dirk Pieter van & Gaalman, Gerard, 2002. "Combined make-to-order and make-to-stock in a food production system," Research Report 02A49, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Khouja, Moutaz & Michalewicz, Zgibniew & Wilmot, Michael, 1998. "The use of genetic algorithms to solve the economic lot size scheduling problem," European Journal of Operational Research, Elsevier, vol. 110(3), pages 509-524, November.
- Brander, Par & Forsberg, Rolf, 2006. "Determination of safety stocks for cyclic schedules with stochastic demands," International Journal of Production Economics, Elsevier, vol. 104(2), pages 271-295, December.
- Banerjee, Avijit, 2009. "Simultaneous determination of multiproduct batch and full truckload shipment schedules," International Journal of Production Economics, Elsevier, vol. 118(1), pages 111-117, March.
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Integrating make-to-order and make-to-stock in job shop control," International Journal of Production Economics, Elsevier, vol. 185(C), pages 1-10.
- Leven, Erik & Segerstedt, Anders, 2007. "A scheduling policy for adjusting economic lot quantities to a feasible solution," European Journal of Operational Research, Elsevier, vol. 179(2), pages 414-423, June.
- Oner, Selma & Bilgic, Taner, 2008. "Economic lot scheduling with uncontrolled co-production," European Journal of Operational Research, Elsevier, vol. 188(3), pages 793-810, August.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:104:y:2006:i:2:p:441-453. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.