Modeling and Simulation of Project Management through the PMBOK® Standard Using Complex Networks
Author
Abstract
Suggested Citation
DOI: 10.1155/2017/4791635
Download full text from publisher
References listed on IDEAS
- Philip Anderson, 1999. "Perspective: Complexity Theory and Organization Science," Organization Science, INFORMS, vol. 10(3), pages 216-232, June.
- S Howick & C Eden, 2001. "The impact of disruption and delay when compressing large projects: going for incentives?," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(1), pages 26-34, January.
- Svenja C. Sommer & Christoph H. Loch, 2004. "Selectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty," Management Science, INFORMS, vol. 50(10), pages 1334-1347, October.
- John M. Burt, 1977. "Planning and Dynamic Control of Projects under Uncertainty," Management Science, INFORMS, vol. 24(3), pages 249-258, November.
- Kenneth R. MacCrimmon & Charles A. Ryavec, 1964. "An Analytical Study of the PERT Assumptions," Operations Research, INFORMS, vol. 12(1), pages 16-37, February.
- Kolisch, Rainer, 1996. "Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation," European Journal of Operational Research, Elsevier, vol. 90(2), pages 320-333, April.
- Barclay, Corlane & Osei-Bryson, Kweku-Muata, 2010. "Project performance development framework: An approach for developing performance criteria & measures for information systems (IS) projects," International Journal of Production Economics, Elsevier, vol. 124(1), pages 272-292, March.
- Aaron J. Shenhar, 2001. "One Size Does Not Fit All Projects: Exploring Classical Contingency Domains," Management Science, INFORMS, vol. 47(3), pages 394-414, March.
- Van de Vonder, Stijn & Demeulemeester, Erik & Herroelen, Willy & Leus, Roel, 2005. "The use of buffers in project management: The trade-off between stability and makespan," International Journal of Production Economics, Elsevier, vol. 97(2), pages 227-240, August.
- Chen, Shih-Pin, 2007. "Analysis of critical paths in a project network with fuzzy activity times," European Journal of Operational Research, Elsevier, vol. 183(1), pages 442-459, November.
- Kolisch, R. & Padman, R., 2001.
"An integrated survey of deterministic project scheduling,"
Omega, Elsevier, vol. 29(3), pages 249-272, June.
- Kolisch, Rainer & Padman, R., 2001. "An integrated survey of deterministic project scheduling," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 8114, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- C Eden & T Williams & F Ackermann & S Howick, 2000. "The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(3), pages 291-300, March.
- Michael T. Pich & Christoph H. Loch & Arnoud De Meyer, 2002. "On Uncertainty, Ambiguity, and Complexity in Project Management," Management Science, INFORMS, vol. 48(8), pages 1008-1023, August.
- Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
- Elmaghraby, S. E. & Fathi, Y. & Taner, M. R., 1999. "On the sensitivity of project variability to activity mean duration," International Journal of Production Economics, Elsevier, vol. 62(3), pages 219-232, September.
- R. A. Bowman, 1995. "Efficient Estimation of Arc Criticalities in Stochastic Activity Networks," Management Science, INFORMS, vol. 41(1), pages 58-67, January.
- Sylvain Lenfle, 2011. "The strategy of parallel approaches in projects with unforeseeable uncertainty: the Manhattan case in retrospect," Post-Print hal-00658346, HAL.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Jagoda Mrzygłocka-Chojnacka & Stanisław Stanek & Dorota Kuchta, 2021. "Defining a Successful Project in Sustainable Project Management through Simulation—A Case Study," Sustainability, MDPI, vol. 13(15), pages 1-23, July.
- P. Urgilés & J. Claver & M. A. Sebastián, 2019. "Analysis of the Earned Value Management and Earned Schedule Techniques in Complex Hydroelectric Power Production Projects: Cost and Time Forecast," Complexity, Hindawi, vol. 2019, pages 1-11, April.
- Miguel A. Baque-Cantos & Cristhian Y. Moreira-Cañarte & Andrés Ultreras-RodrÃguez & Daniel O. Nieves-Lizárraga & Felipe De J. González-RodrÃguez & Jenniffer S. Moreira-Choez & Shirley T. Campos-, 2023. "Technological Enablers and Prospects of Project Management in Industry 4.0: A Literature Review," Academic Journal of Interdisciplinary Studies, Richtmann Publishing Ltd, vol. 12, July.
- Dorota Kuchta & Stanisław Stanek, 2020. "Application of Simulation to Selecting Project Strategy for Autonomous Research Projects at Public Universities," Administrative Sciences, MDPI, vol. 10(1), pages 1-23, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Song, Jie & Martens, Annelies & Vanhoucke, Mario, 2021. "Using Schedule Risk Analysis with resource constraints for project control," European Journal of Operational Research, Elsevier, vol. 288(3), pages 736-752.
- Hanisch, Bastian & Wald, Andreas, 2014. "Effects of complexity on the success of temporary organizations: Relationship quality and transparency as substitutes for formal coordination mechanisms," Scandinavian Journal of Management, Elsevier, vol. 30(2), pages 197-213.
- Hazır, Öncü & Ulusoy, Gündüz, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," International Journal of Production Economics, Elsevier, vol. 223(C).
- Aga, Deribe Assefa, 2016. "Factors affecting the success of development projects : A behavioral perspective," Other publications TiSEM 867ae95e-d53d-4a68-ad46-6, Tilburg University, School of Economics and Management.
- Fernando Acebes & Javier Pajares & Jose M Gonzalez-Varona & Adolfo Lopez-Paredes, 2024. "Project Risk Management from the bottom-up: Activity Risk Index," Papers 2406.00078, arXiv.org.
- Aidin Delgoshaei & Timon Rabczuk & Ahad Ali & Mohd Khairol Anuar Ariffin, 2017. "An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources," Annals of Operations Research, Springer, vol. 259(1), pages 85-117, December.
- Galeazzo, Ambra & Furlan, Andrea & Vinelli, Andrea, 2014. "Understanding environmental-operations integration: The case of pollution prevention projects," International Journal of Production Economics, Elsevier, vol. 153(C), pages 149-160.
- Luise-Sophie Hoffmann & Carolin Kellenbrink & Stefan Helber, 2020. "Simultaneous structuring and scheduling of multiple projects with flexible project structures," Journal of Business Economics, Springer, vol. 90(5), pages 679-711, June.
- Madadi, M. & Iranmanesh, H., 2012. "A management oriented approach to reduce a project duration and its risk (variability)," European Journal of Operational Research, Elsevier, vol. 219(3), pages 751-761.
- Pascal Le Masson & Sylvain Lenfle & Benoit Weil, 2013. "Testing whether major innovation capabilities are systemic design capabilities: analyzing rule-renewal design capabilities in a case-control study of historical new business developments," Post-Print hal-00881700, HAL.
- Kellenbrink, Carolin & Helber, Stefan, 2015.
"Scheduling resource-constrained projects with a flexible project structure,"
European Journal of Operational Research, Elsevier, vol. 246(2), pages 379-391.
- Kellenbrink, Carolin & Helber, Stefan, 2013. "Scheduling resource-constrained projects with a flexible project structure," Hannover Economic Papers (HEP) dp-511, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
- J Davis & A MacDonald & L White, 2010. "Problem-structuring methods and project management: an example of stakeholder involvement using Hierarchical Process Modelling methodology," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 893-904, June.
- Serghei Floricel & Sorin Piperca & Richard Tee, 2018. "Strategies for Managing the Structural and Dynamic Consequences of Project Complexity," Complexity, Hindawi, vol. 2018, pages 1-17, May.
- Öncü Hazir & Gündüz Ulusoy, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," Post-Print hal-02898162, HAL.
- Fernando Acebes & Javier Pajares & José M. González-Varona & Adolfo López-Paredes, 2021. "Project risk management from the bottom-up: Activity Risk Index," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1375-1396, December.
- Wendi Tian & Erik Demeulemeester, 2014. "Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment," Annals of Operations Research, Springer, vol. 213(1), pages 271-291, February.
- Xiong, Jian & Leus, Roel & Yang, Zhenyu & Abbass, Hussein A., 2016. "Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project," European Journal of Operational Research, Elsevier, vol. 251(2), pages 662-675.
- Vega-Velázquez, Miguel Ángel & García-Nájera, Abel & Cervantes, Humberto, 2018. "A survey on the Software Project Scheduling Problem," International Journal of Production Economics, Elsevier, vol. 202(C), pages 145-161.
- Ellinas, Christos & Allan, Neil & Johansson, Anders, 2016. "Project systemic risk: Application examples of a network model," International Journal of Production Economics, Elsevier, vol. 182(C), pages 50-62.
- Dieter Debels & Mario Vanhoucke, 2007. "A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem," Operations Research, INFORMS, vol. 55(3), pages 457-469, June.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hin:complx:4791635. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Mohamed Abdelhakeem (email available below). General contact details of provider: https://www.hindawi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.