A Linear Relaxation-Based Heuristic for Iron Ore Stockyard Energy Planning
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Unsal, Ozgur & Oguz, Ceyda, 2019. "An exact algorithm for integrated planning of operations in dry bulk terminals," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 126(C), pages 103-121.
- Thomas Kalinowski & Reena Kapoor & Martin W. P. Savelsbergh, 2017. "Scheduling reclaimers serving a stock pad at a coal terminal," Journal of Scheduling, Springer, vol. 20(1), pages 85-101, February.
- Dafnomilis, I. & Duinkerken, M.B. & Junginger, M. & Lodewijks, G. & Schott, D.L., 2018. "Optimal equipment deployment for biomass terminal operations," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 115(C), pages 147-163.
- Menezes, Gustavo Campos & Mateus, Geraldo Robson & Ravetti, Martín Gómez, 2017. "A branch and price algorithm to solve the integrated production planning and scheduling in bulk ports," European Journal of Operational Research, Elsevier, vol. 258(3), pages 926-937.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Álvaro D. O. Lopes & Helder R. O. Rocha & Marcos W. J. Servare Junior & Renato E. N. Moraes & Jair A. L. Silva & José L. F. Salles, 2023. "Planning an Integrated Stockyard–Port System for Smart Iron Ore Supply Chains via VND Optimization," Sustainability, MDPI, vol. 15(11), pages 1-20, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Sun, Defeng & Meng, Ying & Tang, Lixin & Liu, Jinyin & Huang, Baobin & Yang, Jiefu, 2020. "Storage space allocation problem at inland bulk material stockyard," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 134(C).
- Gleb Belov & Natashia L. Boland & Martin W. P. Savelsbergh & Peter J. Stuckey, 2020. "Logistics optimization for a coal supply chain," Journal of Heuristics, Springer, vol. 26(2), pages 269-300, April.
- Guo, Zijian & Cao, Zhen & Wang, Wenyuan & Jiang, Ying & Xu, Xinglu & Feng, Peng, 2021. "An integrated model for vessel traffic and deballasting scheduling in coal export terminals," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 152(C).
- Cao, Zhen & Wang, Wenyuan & Jiang, Ying & Xu, Xinglu & Xu, Yunzhuo & Guo, Zijian, 2022. "Joint berth allocation and ship loader scheduling under the rotary loading mode in coal export terminals," Transportation Research Part B: Methodological, Elsevier, vol. 162(C), pages 229-260.
- Bouzekri, Hamza & Bara, Najat & Alpan, Gülgün & Giard, Vincent, 2022. "An integrated Decision Support System for planning production, storage and bulk port operations in a fertilizer supply chain," International Journal of Production Economics, Elsevier, vol. 252(C).
- João Luiz Marques Andrade & Gustavo Campos Menezes, 2023. "A column generation-based heuristic to solve the integrated planning, scheduling, yard allocation and berth allocation problem in bulk ports," Journal of Heuristics, Springer, vol. 29(1), pages 39-76, February.
- El Mehdi, Er Raqabi & Ilyas, Himmich & Nizar, El Hachemi & Issmaïl, El Hallaoui & François, Soumis, 2023. "Incremental LNS framework for integrated production, inventory, and vessel scheduling: Application to a global supply chain," Omega, Elsevier, vol. 116(C).
- Liu, Baoli & Li, Zhi-Chun & Sheng, Dian & Wang, Yadong, 2021. "Integrated planning of berth allocation and vessel sequencing in a seaport with one-way navigation channel," Transportation Research Part B: Methodological, Elsevier, vol. 143(C), pages 23-47.
- Tianhao Shao & Weijie Du & Yun Ye & Haoqing Li & Jingxin Dong & Guiyun Liu & Pengjun Zheng, 2024. "A Novel Virtual Arrival Optimization Method for Traffic Organization Scenarios," Sustainability, MDPI, vol. 16(1), pages 1-17, January.
- Kong, Lingrui & Ji, Mingjun & Gao, Zhendi, 2022. "An exact algorithm for scheduling tandem quay crane operations in container terminals," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 168(C).
- Hamza Bouzekri & Gülgün Alpan & Vincent Giard, 2020. "Modélisation du problème de l'allocation des planches et des postes à quai dans les ports vraquiers," Post-Print hal-03005639, HAL.
- Álvaro D. O. Lopes & Helder R. O. Rocha & Marcos W. J. Servare Junior & Renato E. N. Moraes & Jair A. L. Silva & José L. F. Salles, 2023. "Planning an Integrated Stockyard–Port System for Smart Iron Ore Supply Chains via VND Optimization," Sustainability, MDPI, vol. 15(11), pages 1-20, June.
- Unsal, Ozgur & Oguz, Ceyda, 2019. "An exact algorithm for integrated planning of operations in dry bulk terminals," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 126(C), pages 103-121.
- Bor-Hong Lin & Hsuan-Shih Lee & Cheng-Chi Chung, 2020. "The Construction and Implication of Group Scale Efficiency Evaluation Model for Bulk Shipping Corporations," Mathematics, MDPI, vol. 8(5), pages 1-13, May.
- Mina Roohnavazfar & Seyed Hamid Reza Pasandideh, 2022. "Decomposition algorithm for the multi-trip single vehicle routing problem with AND-type precedence constraints," Operational Research, Springer, vol. 22(4), pages 4253-4285, September.
- Gao, Zhendi & Ji, Mingjun & Kong, Lingrui & Hou, Xinhao, 2024. "Scheduling of automated ore terminal operations based on fixed inflow rhythm," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 182(C).
- Qin, Tianbao & Du, Yuquan & Chen, Jiang Hang & Sha, Mei, 2020. "Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel," European Journal of Operational Research, Elsevier, vol. 285(3), pages 884-901.
- Chen, Sumin & Zeng, Qingcheng & Li, Yantong, 2023. "Integrated operations planning in highly electrified container terminals considering time-of-use tariffs," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 171(C).
- Liu, Baoli & Li, Zhi-Chun & Wang, Yadong, 2022. "A two-stage stochastic programming model for seaport berth and channel planning with uncertainties in ship arrival and handling times," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 167(C).
- Zhang, Sicheng & Li, Xiang & Zhang, Bowen & Wang, Shouyang, 2020. "Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system," European Journal of Operational Research, Elsevier, vol. 283(2), pages 441-460.
More about this item
Keywords
heuristic methods; iron ore stockyard energy planning; linear relaxation-based heuristic; mixed integer linear programming;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:13:y:2020:i:19:p:5232-:d:424975. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.