Post-project evaluation of travel demand forecasts: Implications from the case of a Japanese railway
Author
Abstract
Suggested Citation
DOI: 10.1016/j.tranpol.2013.02.002
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Parthasarathi, Pavithra & Levinson, David, 2010.
"Post-construction evaluation of traffic forecast accuracy,"
Transport Policy, Elsevier, vol. 17(6), pages 428-443, November.
- Pavithra Parthasarathi & David Levinson, 2008. "Post-Construction Evaluation of Traffic Forecast Accuracy," Working Papers 201005, University of Minnesota: Nexus Research Group.
- Flyvbjerg,Bent & Bruzelius,Nils & Rothengatter,Werner, 2003. "Megaprojects and Risk," Cambridge Books, Cambridge University Press, number 9780521009461, November.
- Anguera, Ricard, 2006. "The Channel Tunnel--an ex post economic evaluation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 40(4), pages 291-315, May.
- Joseph Berechman & Li Chen, 2011. "Incorporating Risk of Cost Overruns into Transportation Capital Projects Decision-Making," Journal of Transport Economics and Policy, University of Bath, vol. 45(1), pages 83-103, January.
- Nobuhiro Sanko & Takayuki Morikawa, 2010. "Temporal transferability of updated alternative-specific constants in disaggregate mode choice models," Transportation, Springer, vol. 37(2), pages 203-219, March.
- Gerard Jong & Andrew Daly & Marits Pieters & Stephen Miller & Ronald Plasmeijer & Frank Hofman, 2007. "Uncertainty in traffic forecasts: literature review and new results for The Netherlands," Transportation, Springer, vol. 34(4), pages 375-395, July.
- Yong Zhao & Kara Maria Kockelman, 2002. "The propagation of uncertainty through travel demand models: An exploratory analysis," The Annals of Regional Science, Springer;Western Regional Science Association, vol. 36(1), pages 145-163.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Morten Skou Nicolaisen & Patrick A. Driscoll, 2016. "An International Review of Ex-Post Project Evaluation Schemes in the Transport Sector," Journal of Environmental Assessment Policy and Management (JEAPM), World Scientific Publishing Co. Pte. Ltd., vol. 18(01), pages 1-33, March.
- Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2020. "Traffic forecast inaccuracy in transportation: a literature review of roads and railways projects," Transportation, Springer, vol. 47(4), pages 1571-1606, August.
- Lijie Yu & Yarong Cong & Kuanmin Chen, 2020. "Determination of the Peak Hour Ridership of Metro Stations in Xi’an, China Using Geographically-Weighted Regression," Sustainability, MDPI, vol. 12(6), pages 1-22, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Parthasarathi, Pavithra & Levinson, David, 2010.
"Post-construction evaluation of traffic forecast accuracy,"
Transport Policy, Elsevier, vol. 17(6), pages 428-443, November.
- Pavithra Parthasarathi & David Levinson, 2008. "Post-Construction Evaluation of Traffic Forecast Accuracy," Working Papers 201005, University of Minnesota: Nexus Research Group.
- Maria Börjesson & Jonas Eliasson & Mattias Lundberg, 2014.
"Is CBA Ranking of Transport Investments Robust?,"
Journal of Transport Economics and Policy, University of Bath, vol. 48(2), pages 189-204, May.
- Börjesson, Maria & Eliasson, Jonas & Lundberg, Mattias, 2012. "Is CBA ranking of transport investments robust?," Working papers in Transport Economics 2012:30, CTS - Centre for Transport Studies Stockholm (KTH and VTI).
- Manzo, Stefano & Nielsen, Otto Anker & Prato, Carlo Giacomo, 2015. "How uncertainty in input and parameters influences transport model :output A four-stage model case-study," Transport Policy, Elsevier, vol. 38(C), pages 64-72.
- Morten Skou Nicolaisen & Patrick A. Driscoll, 2016. "An International Review of Ex-Post Project Evaluation Schemes in the Transport Sector," Journal of Environmental Assessment Policy and Management (JEAPM), World Scientific Publishing Co. Pte. Ltd., vol. 18(01), pages 1-33, March.
- Hoque, Jawad Mahmud & Erhardt, Gregory D. & Schmitt, David & Chen, Mei & Wachs, Martin, 2021. "Estimating the uncertainty of traffic forecasts from their historical accuracy," Transportation Research Part A: Policy and Practice, Elsevier, vol. 147(C), pages 339-349.
- Aguas, Oriana & Bachmann, Chris, 2022. "Assessing the effects of input uncertainties on the outputs of a freight demand model," Research in Transportation Economics, Elsevier, vol. 95(C).
- Bent Flyvbjerg, 2014. "What You Should Know About Megaprojects, and Why: An Overview," Papers 1409.0003, arXiv.org.
- Andersson, Matts & Brundell-Freij, Karin & Eliasson, Jonas, 2017. "Validation of aggregate reference forecasts for passenger transport," Transportation Research Part A: Policy and Practice, Elsevier, vol. 96(C), pages 101-118.
- Nobuhiro Sanko, 2017. "Temporal transferability: trade-off between data newness and the number of observations for forecasting travel demand," Transportation, Springer, vol. 44(6), pages 1403-1420, November.
- Bent Flyvbjerg, 2021. "Four Ways to Scale Up: Smart, Dumb, Forced, and Fumbled," Papers 2101.11104, arXiv.org.
- Xu, Xiangdong & Chen, Anthony & Wong, S.C. & Cheng, Lin, 2015. "Selection bias in build-operate-transfer transportation project appraisals," Transportation Research Part A: Policy and Practice, Elsevier, vol. 75(C), pages 245-251.
- Andersson, Matts & Brundell-Freij, Karin & Eliasson, Jonas, 2016. "Validation of reference forecasts for passenger transport," Working papers in Transport Economics 2016:15, CTS - Centre for Transport Studies Stockholm (KTH and VTI), revised 07 Jul 2016.
- Holz-Rau, Christian & Scheiner, Joachim, 2011. "Safety and travel time in cost-benefit analysis: A sensitivity analysis for North Rhine-Westphalia," Transport Policy, Elsevier, vol. 18(2), pages 336-346, March.
- Carl Koopmans & Piet Rietveld, 2013. "Long-term impacts of mega-projects: the discount rate," Chapters, in: Hugo Priemus & Bert van Wee (ed.), International Handbook on Mega-Projects, chapter 14, pages 313-332, Edward Elgar Publishing.
- David Hartgen, 2013. "Hubris or humility? Accuracy issues for the next 50 years of travel demand modeling," Transportation, Springer, vol. 40(6), pages 1133-1157, November.
- Andrew Daly, 2014. "Forecasting choice," Chapters, in: Stephane Hess & Andrew Daly (ed.), Handbook of Choice Modelling, chapter 25, pages 627-646, Edward Elgar Publishing.
- Yang, Chao & Chen, Anthony & Xu, Xiangdong & Wong, S.C., 2013. "Sensitivity-based uncertainty analysis of a combined travel demand model," Transportation Research Part B: Methodological, Elsevier, vol. 57(C), pages 225-244.
- Knudsen, M.Aa. & Rich, J., 2013. "Ex post socio-economic assessment of the Oresund Bridge," Transport Policy, Elsevier, vol. 27(C), pages 53-65.
- Börjesson, Maria & Jonsson, R. Daniel & Berglund, Svante & Almström, Peter, 2014. "Land-use impacts in transport appraisal," Research in Transportation Economics, Elsevier, vol. 47(C), pages 82-91.
- Westin, Jonas & de Jong, Gerard & Vierth, Inge & Krüger, Niclas & Karlsson, Rune & Johansson, Magnus, 2015. "Baserunning - analyzing the sensitivity and economies of scale of the Swedish national freight model system using stochastic production-consumption-matrices," Working papers in Transport Economics 2015:10, CTS - Centre for Transport Studies Stockholm (KTH and VTI), revised 15 Sep 2016.
More about this item
Keywords
Post-project evaluation; Travel demand forecast; Four-step method; Forecasting accuracy; Case study;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:trapol:v:27:y:2013:i:c:p:209-218. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/30473/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.