Selection bias in build-operate-transfer transportation project appraisals
Author
Abstract
Suggested Citation
DOI: 10.1016/j.tra.2015.03.026
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Parthasarathi, Pavithra & Levinson, David, 2010.
"Post-construction evaluation of traffic forecast accuracy,"
Transport Policy, Elsevier, vol. 17(6), pages 428-443, November.
- Pavithra Parthasarathi & David Levinson, 2008. "Post-Construction Evaluation of Traffic Forecast Accuracy," Working Papers 201005, University of Minnesota: Nexus Research Group.
- Mackie, Peter & Preston, John, 1998. "Twenty-one sources of error and bias in transport project appraisal," Transport Policy, Elsevier, vol. 5(1), pages 1-7, January.
- Eliasson, Jonas & Fosgerau, Mogens, 2013.
"Cost overruns and demand shortfalls – Deception or selection?,"
Transportation Research Part B: Methodological, Elsevier, vol. 57(C), pages 105-113.
- Eliasson, Jonas & Fosgerau, Mogens, 2013. "Cost overruns and demand shortfalls – deception or selection?," MPRA Paper 49744, University Library of Munich, Germany.
- Heckman, James, 2013.
"Sample selection bias as a specification error,"
Applied Econometrics, Russian Presidential Academy of National Economy and Public Administration (RANEPA), vol. 31(3), pages 129-137.
- Heckman, James J, 1979. "Sample Selection Bias as a Specification Error," Econometrica, Econometric Society, vol. 47(1), pages 153-161, January.
- Chen, Anthony & Subprasom, Kitti, 2007. "Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty," Transportation Research Part A: Policy and Practice, Elsevier, vol. 41(6), pages 537-558, July.
- Xu, Xiangdong & Chen, Anthony & Cheng, Lin & Lo, Hong K., 2014. "Modeling distribution tail in network performance assessment: A mean-excess total travel time risk measure and analytical estimation method," Transportation Research Part B: Methodological, Elsevier, vol. 66(C), pages 32-49.
- Yang, Hai & Meng, Qiang, 2000. "Highway pricing and capacity choice in a road network under a build-operate-transfer scheme," Transportation Research Part A: Policy and Practice, Elsevier, vol. 34(3), pages 207-222, April.
- Nicolaisen, Morten Skou & Næss, Petter, 2015. "Roads to nowhere: The accuracy of travel demand forecasts for do-nothing alternatives," Transport Policy, Elsevier, vol. 37(C), pages 57-63.
- Robert Bain, 2009. "Error and optimism bias in toll road traffic forecasts," Transportation, Springer, vol. 36(5), pages 469-482, September.
- Yong Zhao & Kara Maria Kockelman, 2002. "The propagation of uncertainty through travel demand models: An exploratory analysis," The Annals of Regional Science, Springer;Western Regional Science Association, vol. 36(1), pages 145-163.
- Morten Skou Nicolaisen & Patrick Arthur Driscoll, 2014. "Ex-Post Evaluations of Demand Forecast Accuracy: A Literature Review," Transport Reviews, Taylor & Francis Journals, vol. 34(4), pages 540-557, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Unutmaz Durmuşoğlu, Zeynep Didem, 2018. "Assessment of techno-entrepreneurship projects by using Analytical Hierarchy Process (AHP)," Technology in Society, Elsevier, vol. 54(C), pages 41-46.
- Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2020. "Traffic forecast inaccuracy in transportation: a literature review of roads and railways projects," Transportation, Springer, vol. 47(4), pages 1571-1606, August.
- Meng, Qiang & Lu, Zhaoyang, 2017. "Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions," Transportation Research Part B: Methodological, Elsevier, vol. 102(C), pages 105-123.
- Sang, Jinyan & Li, Zhi-Chun & Lam, William H.K. & Wong, S.C., 2019. "Design of build-operate-transfer contract for integrated rail and property development with uncertainty in future urban population," Transportation Research Part B: Methodological, Elsevier, vol. 130(C), pages 36-66.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Nicolaisen, Morten Skou & Næss, Petter, 2015. "Roads to nowhere: The accuracy of travel demand forecasts for do-nothing alternatives," Transport Policy, Elsevier, vol. 37(C), pages 57-63.
- Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2020. "Traffic forecast inaccuracy in transportation: a literature review of roads and railways projects," Transportation, Springer, vol. 47(4), pages 1571-1606, August.
- Andersson, Matts & Brundell-Freij, Karin & Eliasson, Jonas, 2016. "Validation of reference forecasts for passenger transport," Working papers in Transport Economics 2016:15, CTS - Centre for Transport Studies Stockholm (KTH and VTI), revised 07 Jul 2016.
- Maria Börjesson & Jonas Eliasson & Mattias Lundberg, 2014.
"Is CBA Ranking of Transport Investments Robust?,"
Journal of Transport Economics and Policy, University of Bath, vol. 48(2), pages 189-204, May.
- Börjesson, Maria & Eliasson, Jonas & Lundberg, Mattias, 2012. "Is CBA ranking of transport investments robust?," Working papers in Transport Economics 2012:30, CTS - Centre for Transport Studies Stockholm (KTH and VTI).
- Walker, Joan L. & Chatman, Daniel & Daziano, Ricardo & Erhardt, Gregory & Gao, Song & Mahmassani, Hani & Ory, David & Sall, Elizabeth & Bhat, Chandra & Chim, Nicholas & Daniels, Clint & Gardner, Brian, 2019. "Advancing the Science of Travel Demand Forecasting," Institute of Transportation Studies, Research Reports, Working Papers, Proceedings qt0v1906ts, Institute of Transportation Studies, UC Berkeley.
- David Hartgen, 2013. "Hubris or humility? Accuracy issues for the next 50 years of travel demand modeling," Transportation, Springer, vol. 40(6), pages 1133-1157, November.
- Andersson, Matts & Brundell-Freij, Karin & Eliasson, Jonas, 2017. "Validation of aggregate reference forecasts for passenger transport," Transportation Research Part A: Policy and Practice, Elsevier, vol. 96(C), pages 101-118.
- Salling, Kim Bang & Leleur, Steen, 2015. "Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation," Transport Policy, Elsevier, vol. 38(C), pages 8-18.
- Sang, Jinyan & Li, Zhi-Chun & Lam, William H.K. & Wong, S.C., 2019. "Design of build-operate-transfer contract for integrated rail and property development with uncertainty in future urban population," Transportation Research Part B: Methodological, Elsevier, vol. 130(C), pages 36-66.
- Morten Skou Nicolaisen & Patrick A. Driscoll, 2016. "An International Review of Ex-Post Project Evaluation Schemes in the Transport Sector," Journal of Environmental Assessment Policy and Management (JEAPM), World Scientific Publishing Co. Pte. Ltd., vol. 18(01), pages 1-33, March.
- Asplund, Disa & Eliasson, Jonas, 2016.
"Does uncertainty make cost-benefit analyses pointless?,"
Transportation Research Part A: Policy and Practice, Elsevier, vol. 92(C), pages 195-205.
- Thureson, Disa & Eliasson, Jonas, 2016. "Does uncertainty make cost-benefit analyses pointless?," Working papers in Transport Economics 2016:8, CTS - Centre for Transport Studies Stockholm (KTH and VTI).
- Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.
- Hoang-Tung, Nguyen & Viet Hung, Do & Kato, Hironori & Binh, Phan Le, 2021. "Modeling ceiling price for build-operate-transfer road projects in developing countries," Economics of Transportation, Elsevier, vol. 28(C).
- Barfod, Michael Bruhn & Salling, Kim Bang, 2015. "A new composite decision support framework for strategic and sustainable transport appraisals," Transportation Research Part A: Policy and Practice, Elsevier, vol. 72(C), pages 1-15.
- Manzo, Stefano & Nielsen, Otto Anker & Prato, Carlo Giacomo, 2015. "How uncertainty in input and parameters influences transport model :output A four-stage model case-study," Transport Policy, Elsevier, vol. 38(C), pages 64-72.
- Feng, Zhuo & Zhang, Shui-Bo & Gao, Ying, 2015. "Modeling the impact of government guarantees on toll charge, road quality and capacity for Build-Operate-Transfer (BOT) road projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 78(C), pages 54-67.
- Lindsey, Robin & de Palma, André, 2014.
"Cost recovery from congestion tolls with long-run uncertainty,"
Economics of Transportation, Elsevier, vol. 3(2), pages 119-132.
- Robin Lindsey & André de Palma, 2013. "Cost Recovery from Congestion Tolls with Long-run Uncertainty," Working Papers hal-00784299, HAL.
- Robin Lindsey & André de Palma, 2014. "Cost recovery from congestion tolls with long-run uncertainty," Post-Print hal-01311130, HAL.
- Robin Lindsey & André de Palma, 2014. "Cost recovery from congestion tolls with long-run uncertainty," Université Paris1 Panthéon-Sorbonne (Post-Print and Working Papers) hal-01311130, HAL.
- Sanko, Nobuhiro & Morikawa, Takayuki & Nagamatsu, Yoshitaka, 2013. "Post-project evaluation of travel demand forecasts: Implications from the case of a Japanese railway," Transport Policy, Elsevier, vol. 27(C), pages 209-218.
- Niu, Baozhuang & Zhang, Jie, 2013. "Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 1-14.
- te Brömmelstroet, Marco & Skou Nicolaisen, Morten & Büttner, Benjamin & Ferreira, Antonio, 2017. "Experiences with transportation models: An international survey of planning practices," Transport Policy, Elsevier, vol. 58(C), pages 10-18.
More about this item
Keywords
BOT; Selection bias; Traffic forecasts; Inaccuracy; Project appraisals;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transa:v:75:y:2015:i:c:p:245-251. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/547/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.