Introducing a preliminary consists selection in the locomotive assignment problem
Author
Abstract
Suggested Citation
DOI: 10.1016/j.tre.2015.07.003
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Warren B. Powell & Belgacem Bouzaiene-Ayari & Coleman Lawrence & Clark Cheng & Sourav Das & Ricardo Fiorillo, 2014. "Locomotive Planning at Norfolk Southern: An Optimizing Simulator Using Approximate Dynamic Programming," Interfaces, INFORMS, vol. 44(6), pages 567-578, December.
- Marar, Arun & Powell, Warren B., 2009. "Capturing incomplete information in resource allocation problems through numerical patterns," European Journal of Operational Research, Elsevier, vol. 197(1), pages 50-58, August.
- Ravindra K. Ahuja & Jian Liu & James B. Orlin & Dushyant Sharma & Larry A. Shughart, 2005. "Solving Real-Life Locomotive-Scheduling Problems," Transportation Science, INFORMS, vol. 39(4), pages 503-517, November.
- Koorush Ziarati & François Soumis & Jacques Desrosiers & Marius M. Solomon, 1999. "A Branch-First, Cut-Second Approach for Locomotive Assignment," Management Science, INFORMS, vol. 45(8), pages 1156-1168, August.
- Balachandran Vaidyanathan & Ravindra K. Ahuja & James B. Orlin, 2008. "The Locomotive Routing Problem," Transportation Science, INFORMS, vol. 42(4), pages 492-507, November.
- Warren Powell & Joel Shapiro & Hugo Simao, 2001. "A Representational Paradigm for Dynamic Resource Transformation Problems," Annals of Operations Research, Springer, vol. 104(1), pages 231-279, April.
- Dondo, Rodolfo & Cerda, Jaime, 2007. "A cluster-based optimization approach for the multi-depot heterogeneous fleet vehicle routing problem with time windows," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1478-1507, February.
- Marco E. Lübbecke & Uwe T. Zimmermann, 2003. "Engine Routing and Scheduling at Industrial In-Plant Railroads," Transportation Science, INFORMS, vol. 37(2), pages 183-197, May.
- Ziarati, Koorush & Soumis, Francois & Desrosiers, Jacques & Gelinas, Sylvie & Saintonge, Andre, 1997. "Locomotive assignment with heterogeneous consists at CN North America," European Journal of Operational Research, Elsevier, vol. 97(2), pages 281-292, March.
- D H Noble & M Al-Amin & R G J Mills, 2001. "Production of locomotive rosters for a multi-class multi-locomotive problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(11), pages 1191-1200, November.
- Vaidyanathan, Balachandran & Ahuja, Ravindra K. & Liu, Jian & Shughart, Larry A., 2008. "Real-life locomotive planning: New formulations and computational results," Transportation Research Part B: Methodological, Elsevier, vol. 42(2), pages 147-168, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Scheffler, Martin & Neufeld, Janis S. & Hölscher, Michael, 2020. "An MIP-based heuristic solution approach for the locomotive assignment problem focussing on (dis-)connecting processes," Transportation Research Part B: Methodological, Elsevier, vol. 139(C), pages 64-80.
- Canca, David & Barrena, Eva, 2018. "The integrated rolling stock circulation and depot location problem in railway rapid transit systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 109(C), pages 115-138.
- Huang, Baobin & Tang, Lixin & Baldacci, Roberto & Wang, Gongshu & Sun, Defeng, 2023. "A metaheuristic algorithm for a locomotive routing problem arising in the steel industry," European Journal of Operational Research, Elsevier, vol. 308(1), pages 385-399.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Prashant Premkumar & P. N. Ram Kumar, 2019. "Literature Review of Locomotive Assignment Problem from Service Operations Perspective: The Case of Indian Railways," IIM Kozhikode Society & Management Review, , vol. 8(1), pages 74-86, January.
- Belgacem Bouzaiene-Ayari & Clark Cheng & Sourav Das & Ricardo Fiorillo & Warren B. Powell, 2016. "From Single Commodity to Multiattribute Models for Locomotive Optimization: A Comparison of Optimal Integer Programming and Approximate Dynamic Programming," Transportation Science, INFORMS, vol. 50(2), pages 366-389, May.
- Camilo Ortiz-Astorquiza & Jean-François Cordeau & Emma Frejinger, 2021. "The Locomotive Assignment Problem with Distributed Power at the Canadian National Railway Company," Transportation Science, INFORMS, vol. 55(2), pages 510-531, March.
- Prashant Premkumar & P. N. Ram Kumar, 2022. "Locomotive assignment problem: integrating the strategic, tactical and operational level aspects," Annals of Operations Research, Springer, vol. 315(2), pages 867-898, August.
- Xu, Xiaoming & Li, Chung-Lun & Xu, Zhou, 2018. "Integrated train timetabling and locomotive assignment," Transportation Research Part B: Methodological, Elsevier, vol. 117(PA), pages 573-593.
- Warren B. Powell & Belgacem Bouzaiene-Ayari & Coleman Lawrence & Clark Cheng & Sourav Das & Ricardo Fiorillo, 2014. "Locomotive Planning at Norfolk Southern: An Optimizing Simulator Using Approximate Dynamic Programming," Interfaces, INFORMS, vol. 44(6), pages 567-578, December.
- Petr KOZLOV & Sergey VAKULENKO & Nikolay TUSHIN & Elena TIMUKHINA, 2017. "Model To Calculate The Optimal Mode Of Train Locomotives Turnover," Transport Problems, Silesian University of Technology, Faculty of Transport, vol. 12(3), pages 125-133, September.
- Vaidyanathan, Balachandran & Ahuja, Ravindra K. & Liu, Jian & Shughart, Larry A., 2008. "Real-life locomotive planning: New formulations and computational results," Transportation Research Part B: Methodological, Elsevier, vol. 42(2), pages 147-168, February.
- Frisch, Sarah & Hungerländer, Philipp & Jellen, Anna & Primas, Bernhard & Steininger, Sebastian & Weinberger, Dominic, 2021. "Solving a real-world Locomotive Scheduling Problem with Maintenance Constraints," Transportation Research Part B: Methodological, Elsevier, vol. 150(C), pages 386-409.
- Scheffler, Martin & Neufeld, Janis S. & Hölscher, Michael, 2020. "An MIP-based heuristic solution approach for the locomotive assignment problem focussing on (dis-)connecting processes," Transportation Research Part B: Methodological, Elsevier, vol. 139(C), pages 64-80.
- Nourbakhsh, Seyed Mohammad & Ouyang, Yanfeng, 2010. "Optimal fueling strategies for locomotive fleets in railroad networks," Transportation Research Part B: Methodological, Elsevier, vol. 44(8-9), pages 1104-1114, September.
- Philimon Nyamugure & Siphosenkosi Dube Swene & Edward T. Chiyaka & Farikayi K. Mutasa, 2014. "Train Schedule Optimization: A Case Study of the National Railways of Zimbabwe," International Journal of Management Sciences, Research Academy of Social Sciences, vol. 3(1), pages 1-20.
- Chung, Ji-Won & Oh, Seog-Moon & Choi, In-Chan, 2009. "A hybrid genetic algorithm for train sequencing in the Korean railway," Omega, Elsevier, vol. 37(3), pages 555-565, June.
- Balachandran Vaidyanathan & Ravindra K. Ahuja & James B. Orlin, 2008. "The Locomotive Routing Problem," Transportation Science, INFORMS, vol. 42(4), pages 492-507, November.
- Petr KOZLOV & Elena TIMUKHINA & Nikolay TUSHIN, 2018. "Coordination Of Locomotives Turnover And Servicing Modes," Transport Problems, Silesian University of Technology, Faculty of Transport, vol. 13(1), pages 19-26, March.
- Rouillon, Stéphane & Desaulniers, Guy & Soumis, François, 2006. "An extended branch-and-bound method for locomotive assignment," Transportation Research Part B: Methodological, Elsevier, vol. 40(5), pages 404-423, June.
- Michael F. Gorman & John-Paul Clarke & Amir Hossein Gharehgozli & Michael Hewitt & René de Koster & Debjit Roy, 2014. "State of the Practice: A Review of the Application of OR/MS in Freight Transportation," Interfaces, INFORMS, vol. 44(6), pages 535-554, December.
- Sato, Keisuke & Fukumura, Naoto, 2012. "Real-time freight locomotive rescheduling and uncovered train detection during disruption," European Journal of Operational Research, Elsevier, vol. 221(3), pages 636-648.
- Shah, Nirav & Kumar, Subodha & Bastani, Farokh & Yen, I-Ling, 2012. "Optimization models for assessing the peak capacity utilization of intelligent transportation systems," European Journal of Operational Research, Elsevier, vol. 216(1), pages 239-251.
- Armin Fügenschuh & Henning Homfeld & Andreas Huck & Alexander Martin & Zhi Yuan, 2008. "Scheduling Locomotives and Car Transfers in Freight Transport," Transportation Science, INFORMS, vol. 42(4), pages 478-491, November.
More about this item
Keywords
Consist selection; Integer programming; Fueling cost; Locomotive planning; Direct freight trains;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transe:v:82:y:2015:i:c:p:217-237. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/600244/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.