IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v55y2017i20p6193-6206.html
   My bibliography  Save this article

Integrated production scheduling and batch delivery with fixed departure times and inventory holding costs

Author

Listed:
  • Alessandro Agnetis
  • Mohamed Ali Aloulou
  • Mikhail Y. Kovalyov

Abstract

In this paper, we address a model for supply chain coordination. There are m manufacturers modelled as single machines, each of which processes a specific set of jobs (products). After processing is completed, jobs are batched, and batches are shipped to a customer by means of vehicles. The problem consists in concurrently finding a production schedule of the jobs, a partition of jobs into delivery batches and an assignment of delivery batches to vehicles, so that jobs are delivered within their deadlines and total costs are minimised. We focus on a scenario characterised by fixed departure times and inventory holding costs. For each departure time there is a given number of vehicles, possibly having limited capacity. Each job incurs a cost proportional to the time from job completion to delivery departure. In this paper, we show that the problem is NP-hard even for a very restricted case, and report various polynomiality results for two scenarios, namely: (i) when the production sequence of each manufacturer is fixed in advance, and (ii) when there is a single manufacturer and processing times are all equal to 1. We also point out several open problems.

Suggested Citation

  • Alessandro Agnetis & Mohamed Ali Aloulou & Mikhail Y. Kovalyov, 2017. "Integrated production scheduling and batch delivery with fixed departure times and inventory holding costs," International Journal of Production Research, Taylor & Francis Journals, vol. 55(20), pages 6193-6206, October.
  • Handle: RePEc:taf:tprsxx:v:55:y:2017:i:20:p:6193-6206
    DOI: 10.1080/00207543.2017.1346323
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2017.1346323
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2017.1346323?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Han, Dongya & Yang, Yongjian & Wang, Dujuan & Cheng, T.C.E. & Yin, Yunqiang, 2019. "Integrated production, inventory, and outbound distribution operations with fixed departure times in a three-stage supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 125(C), pages 334-347.
    2. Justkowiak, Jan-Erik & Kovalev, Sergey & Kovalyov, Mikhail Y. & Pesch, Erwin, 2023. "Single machine scheduling with assignable due dates to minimize maximum and total late work," European Journal of Operational Research, Elsevier, vol. 308(1), pages 76-83.
    3. Wang, Julong & Liu, Zhixue & Li, Feng, 2024. "Integrated production and transportation scheduling problem under nonlinear cost structures," European Journal of Operational Research, Elsevier, vol. 313(3), pages 883-904.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:55:y:2017:i:20:p:6193-6206. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.