The effect of concession period design on completion risk management of BOT projects

Author

Listed:
  • Sudong Ye
  • Robert Tiong

Abstract

The design of concession period for build-operate-transfer (BOT) projects is crucial to financial viability and completion risk management. A systematic analysis shows that concession period design involves the design of concession period structure, the determination of the concession period length and incentive schemes. The concession period may have a single-period structure or a two-period structure, its length may be fixed or variable, and it may be combined with incentive schemes. Different designs reflect different risk control strategies for completion time overruns. The single-period concession structure requires the project company to assume completion risk, while the two-period concession structure could, to some extent, reduce the completion risk exposure to the project company, depending on the incentive schemes. Through Monte Carlo simulation, this paper evaluates the mean net present value (NPV), variance and NPV-at-risk of different concession period structures so that both the government and the concessionaires can understand their risk exposure and rewards. The paper then analyses the influence of project characteristics on concession period design to evaluate the feasibility of the design. It is concluded that a well-designed concession period structure can create a 'win-win' solution for both project promoter and the host government.

Suggested Citation

  • Sudong Ye & Robert Tiong, 2003. "The effect of concession period design on completion risk management of BOT projects," Construction Management and Economics, Taylor & Francis Journals, vol. 21(5), pages 471-482.
  • Handle: RePEc:taf:conmgt:v:21:y:2003:i:5:p:471-482
    DOI: 10.1080/0144619032000073488
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/0144619032000073488
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/0144619032000073488?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Abraham Park & Chen Yu Chang, 2013. "Impacts of Construction Events on the Project Equity Value of the Channel Tunnel Project," ERES eres2013_97, European Real Estate Society (ERES).
    2. Theys, Christophe & Notteboom, Theo E. & Pallis, Athanasios A. & De Langen, Peter W., 2010. "The economics behind the awarding of terminals in seaports: Towards a research agenda," Research in Transportation Economics, Elsevier, vol. 27(1), pages 37-50.
    3. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo, 2018. "The effects of concession period structures on BOT road contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 107(C), pages 106-125.
    4. Zhao, Zhen-Yu & Zuo, Jian & Zillante, George, 2013. "Factors influencing the success of BOT power plant projects in China: A review," Renewable and Sustainable Energy Reviews, Elsevier, vol. 22(C), pages 446-453.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:21:y:2003:i:5:p:471-482. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.