IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v96y2005i2p189-200.html
   My bibliography  Save this article

Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops

Author

Listed:
  • Zhang, Wei
  • Yin, Changyu
  • Liu, Jiyin
  • Linn, Richard J.

Abstract

No abstract is available for this item.

Suggested Citation

  • Zhang, Wei & Yin, Changyu & Liu, Jiyin & Linn, Richard J., 2005. "Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops," International Journal of Production Economics, Elsevier, vol. 96(2), pages 189-200, May.
  • Handle: RePEc:eee:proeco:v:96:y:2005:i:2:p:189-200
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(04)00148-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Vickson, R. G., 1995. "Optimal lot streaming for multiple products in a two-machine flow shop," European Journal of Operational Research, Elsevier, vol. 85(3), pages 556-575, September.
    2. Kalir, Adar A. & Sarin, Subhash C., 2000. "Evaluation of the potential benefits of lot streaming in flow-shop systems," International Journal of Production Economics, Elsevier, vol. 66(2), pages 131-142, June.
    3. Stanley Reiter, 1965. "A System for Managing Job-Shop Production," The Journal of Business, University of Chicago Press, vol. 39, pages 371-371.
    4. Dan Trietsch & Kenneth R. Baker, 1993. "Basic Techniques for Lot Streaming," Operations Research, INFORMS, vol. 41(6), pages 1065-1076, December.
    5. Sen, Alper & Topaloglu, Engin & Benli, Omer S., 1998. "Optimal streaming of a single job in a two-stage flow shop," European Journal of Operational Research, Elsevier, vol. 110(1), pages 42-62, October.
    6. Baker, KR & Jia, D, 1993. "A comparative study of lot streaming procedures," Omega, Elsevier, vol. 21(5), pages 561-566, September.
    7. Rahendran, Chandrasekharan & Chaudhuri, Dipak, 1992. "A multi-stage parallel-processor flowshop problem with minimum flowtime," European Journal of Operational Research, Elsevier, vol. 57(1), pages 111-122, February.
    8. Glass, C. A. & Gupta, J. N. D. & Potts, C. N., 1994. "Lot streaming in three-stage production processes," European Journal of Operational Research, Elsevier, vol. 75(2), pages 378-394, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Pan, Quan-Ke & Ruiz, Rubén, 2012. "An estimation of distribution algorithm for lot-streaming flow shop problems with setup times," Omega, Elsevier, vol. 40(2), pages 166-180, April.
    2. Tzu-Li Chen & Chen-Yang Cheng & Yi-Han Chou, 2020. "Multi-objective genetic algorithm for energy-efficient hybrid flow shop scheduling with lot streaming," Annals of Operations Research, Springer, vol. 290(1), pages 813-836, July.
    3. Ruiz, Rubén & Vázquez-Rodríguez, José Antonio, 2010. "The hybrid flow shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 205(1), pages 1-18, August.
    4. Chengshuai Li & Biao Zhang & Yuyan Han & Yuting Wang & Junqing Li & Kaizhou Gao, 2022. "Energy-Efficient Hybrid Flowshop Scheduling with Consistent Sublots Using an Improved Cooperative Coevolutionary Algorithm," Mathematics, MDPI, vol. 11(1), pages 1-27, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. D Biskup & M Feldmann, 2006. "Lot streaming with variable sublots: an integer programming formulation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 296-303, March.
    2. Chen, Jiang & Steiner, George, 1997. "Lot streaming with detached setups in three-machine flow shops," European Journal of Operational Research, Elsevier, vol. 96(3), pages 591-611, February.
    3. Adar A. Kalir & Subhash C. Sarin, 2003. "Constructing Near Optimal Schedules for the Flow-Shop Lot Streaming Problem with Sublot-Attached Setups," Journal of Combinatorial Optimization, Springer, vol. 7(1), pages 23-44, March.
    4. Chiu, Huan Neng & Chang, Jen Huei, 2005. "Cost models for lot streaming in a multistage flow shop," Omega, Elsevier, vol. 33(5), pages 435-450, October.
    5. Vickson, Raymond G. & Hassini, Elkafi, 2006. "Lot streaming for quality control in two-stage batch production," European Journal of Operational Research, Elsevier, vol. 170(3), pages 824-843, May.
    6. Pan, Quan-Ke & Ruiz, Rubén, 2012. "An estimation of distribution algorithm for lot-streaming flow shop problems with setup times," Omega, Elsevier, vol. 40(2), pages 166-180, April.
    7. Liu, Jiyin, 2008. "Single-job lot streaming in m - 1 two-stage hybrid flowshops," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1171-1183, June.
    8. Chung‐Lun Li & Wen‐Qiang Xiao, 2004. "Lot streaming with supplier–manufacturer coordination," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(4), pages 522-542, June.
    9. Tzu-Li Chen & Chen-Yang Cheng & Yi-Han Chou, 2020. "Multi-objective genetic algorithm for energy-efficient hybrid flow shop scheduling with lot streaming," Annals of Operations Research, Springer, vol. 290(1), pages 813-836, July.
    10. Arianna Alfieri & Shuyu Zhou & Rosario Scatamacchia & Steef L. van de Velde, 2021. "Dynamic programming algorithms and Lagrangian lower bounds for a discrete lot streaming problem in a two-machine flow shop," 4OR, Springer, vol. 19(2), pages 265-288, June.
    11. Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
    12. Tseng, Chao-Tang & Liao, Ching-Jong, 2008. "A discrete particle swarm optimization for lot-streaming flowshop scheduling problem," European Journal of Operational Research, Elsevier, vol. 191(2), pages 360-373, December.
    13. Yossi Bukchin & Michael Masin & Rinat Kirshner, 2010. "Modeling and analysis of multiobjective lot splitting for N‐product M‐machine flowshop lines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 57(4), pages 354-366, June.
    14. Sarin, Subhash C. & Kalir, Adar A. & Chen, Ming, 2008. "A single-lot, unified cost-based flow shop lot-streaming problem," International Journal of Production Economics, Elsevier, vol. 113(1), pages 413-424, May.
    15. Kim, J-S. & Kang, S-H. & Lee, S. M., 1997. "Transfer batch scheduling for a two-stage flowshop with identical parallel machines at each stage," Omega, Elsevier, vol. 25(5), pages 547-555, October.
    16. I. Van Nieuwenhuyse, 2008. "Lot sizing in stochastic flowshops. Striking the balance between capacity and flow," Review of Business and Economic Literature, KU Leuven, Faculty of Economics and Business (FEB), Review of Business and Economic Literature, vol. 0(2), pages 147-160.
    17. Sen, Alper & Topaloglu, Engin & Benli, Omer S., 1998. "Optimal streaming of a single job in a two-stage flow shop," European Journal of Operational Research, Elsevier, vol. 110(1), pages 42-62, October.
    18. Kalir, Adar A. & Sarin, Subhash C., 2001. "A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots," Omega, Elsevier, vol. 29(6), pages 577-584, December.
    19. Martin, Clarence H, 2009. "A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming," Omega, Elsevier, vol. 37(1), pages 126-137, February.
    20. Azizoglu, Meral & Cakmak, Ergin & Kondakci, Suna, 2001. "A flexible flowshop problem with total flow time minimization," European Journal of Operational Research, Elsevier, vol. 132(3), pages 528-538, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:96:y:2005:i:2:p:189-200. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.