Lot streaming with detached setups in three-machine flow shops
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Vickson, R. G., 1995. "Optimal lot streaming for multiple products in a two-machine flow shop," European Journal of Operational Research, Elsevier, vol. 85(3), pages 556-575, September.
- Stanley Reiter, 1965. "A System for Managing Job-Shop Production," The Journal of Business, University of Chicago Press, vol. 39, pages 371-371.
- Dan Trietsch & Kenneth R. Baker, 1993. "Basic Techniques for Lot Streaming," Operations Research, INFORMS, vol. 41(6), pages 1065-1076, December.
- Baker, KR & Jia, D, 1993. "A comparative study of lot streaming procedures," Omega, Elsevier, vol. 21(5), pages 561-566, September.
- Glass, C. A. & Gupta, J. N. D. & Potts, C. N., 1994. "Lot streaming in three-stage production processes," European Journal of Operational Research, Elsevier, vol. 75(2), pages 378-394, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Sarin, Subhash C. & Kalir, Adar A. & Chen, Ming, 2008. "A single-lot, unified cost-based flow shop lot-streaming problem," International Journal of Production Economics, Elsevier, vol. 113(1), pages 413-424, May.
- Kalir, Adar A. & Sarin, Subhash C., 2001. "A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots," Omega, Elsevier, vol. 29(6), pages 577-584, December.
- Chung‐Lun Li & Wen‐Qiang Xiao, 2004. "Lot streaming with supplier–manufacturer coordination," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(4), pages 522-542, June.
- D Biskup & M Feldmann, 2006. "Lot streaming with variable sublots: an integer programming formulation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 296-303, March.
- Adar A. Kalir & Subhash C. Sarin, 2003. "Constructing Near Optimal Schedules for the Flow-Shop Lot Streaming Problem with Sublot-Attached Setups," Journal of Combinatorial Optimization, Springer, vol. 7(1), pages 23-44, March.
- Kalir, Adar A. & Sarin, Subhash C., 2000. "Evaluation of the potential benefits of lot streaming in flow-shop systems," International Journal of Production Economics, Elsevier, vol. 66(2), pages 131-142, June.
- Chiu, Huan Neng & Chang, Jen Huei, 2005. "Cost models for lot streaming in a multistage flow shop," Omega, Elsevier, vol. 33(5), pages 435-450, October.
- Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- D Biskup & M Feldmann, 2006. "Lot streaming with variable sublots: an integer programming formulation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 296-303, March.
- Zhang, Wei & Yin, Changyu & Liu, Jiyin & Linn, Richard J., 2005. "Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops," International Journal of Production Economics, Elsevier, vol. 96(2), pages 189-200, May.
- Chiu, Huan Neng & Chang, Jen Huei, 2005. "Cost models for lot streaming in a multistage flow shop," Omega, Elsevier, vol. 33(5), pages 435-450, October.
- Pan, Quan-Ke & Ruiz, Rubén, 2012. "An estimation of distribution algorithm for lot-streaming flow shop problems with setup times," Omega, Elsevier, vol. 40(2), pages 166-180, April.
- Adar A. Kalir & Subhash C. Sarin, 2003. "Constructing Near Optimal Schedules for the Flow-Shop Lot Streaming Problem with Sublot-Attached Setups," Journal of Combinatorial Optimization, Springer, vol. 7(1), pages 23-44, March.
- Liu, Jiyin, 2008. "Single-job lot streaming in m - 1 two-stage hybrid flowshops," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1171-1183, June.
- Vickson, Raymond G. & Hassini, Elkafi, 2006. "Lot streaming for quality control in two-stage batch production," European Journal of Operational Research, Elsevier, vol. 170(3), pages 824-843, May.
- Tseng, Chao-Tang & Liao, Ching-Jong, 2008. "A discrete particle swarm optimization for lot-streaming flowshop scheduling problem," European Journal of Operational Research, Elsevier, vol. 191(2), pages 360-373, December.
- Chung‐Lun Li & Wen‐Qiang Xiao, 2004. "Lot streaming with supplier–manufacturer coordination," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(4), pages 522-542, June.
- Tzu-Li Chen & Chen-Yang Cheng & Yi-Han Chou, 2020. "Multi-objective genetic algorithm for energy-efficient hybrid flow shop scheduling with lot streaming," Annals of Operations Research, Springer, vol. 290(1), pages 813-836, July.
- Kalir, Adar A. & Sarin, Subhash C., 2001. "A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots," Omega, Elsevier, vol. 29(6), pages 577-584, December.
- Arianna Alfieri & Shuyu Zhou & Rosario Scatamacchia & Steef L. van de Velde, 2021. "Dynamic programming algorithms and Lagrangian lower bounds for a discrete lot streaming problem in a two-machine flow shop," 4OR, Springer, vol. 19(2), pages 265-288, June.
- Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
- Sen, Alper & Topaloglu, Engin & Benli, Omer S., 1998. "Optimal streaming of a single job in a two-stage flow shop," European Journal of Operational Research, Elsevier, vol. 110(1), pages 42-62, October.
- Van Nieuwenhuyse, Inneke & Vandaele, Nico, 2004. "Determining the optimal number of sublots in a single-product, deterministic flow shop with overlapping operations," International Journal of Production Economics, Elsevier, vol. 92(3), pages 221-239, December.
- C. A. Glass & C. N. Potts, 1998. "Structural Properties of Lot Streaming in a Flow Shop," Mathematics of Operations Research, INFORMS, vol. 23(3), pages 624-639, August.
- Yossi Bukchin & Michael Masin & Rinat Kirshner, 2010. "Modeling and analysis of multiobjective lot splitting for N‐product M‐machine flowshop lines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 57(4), pages 354-366, June.
- Kim, J-S. & Kang, S-H. & Lee, S. M., 1997. "Transfer batch scheduling for a two-stage flowshop with identical parallel machines at each stage," Omega, Elsevier, vol. 25(5), pages 547-555, October.
- Huang, Rong-Hwa & Yang, Chang-Lin, 2008. "Overlapping production scheduling planning with multiple objectives--An ant colony approach," International Journal of Production Economics, Elsevier, vol. 115(1), pages 163-170, September.
- Nicholas G. Hall & Zhixin Liu, 2010. "Capacity Allocation and Scheduling in Supply Chains," Operations Research, INFORMS, vol. 58(6), pages 1711-1725, December.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:96:y:1997:i:3:p:591-611. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.