IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v103y2006i1p149-165.html
   My bibliography  Save this article

So many factors, so little time...Simulation experiments in the frequency domain

Author

Listed:
  • Sanchez, Susan M.
  • Moeeni, Farhad
  • Sanchez, Paul J.

Abstract

No abstract is available for this item.

Suggested Citation

  • Sanchez, Susan M. & Moeeni, Farhad & Sanchez, Paul J., 2006. "So many factors, so little time...Simulation experiments in the frequency domain," International Journal of Production Economics, Elsevier, vol. 103(1), pages 149-165, September.
  • Handle: RePEc:eee:proeco:v:103:y:2006:i:1:p:149-165
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(05)00212-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Robert G. Sargent & Tapas K. Som, 1992. "Current Issues in Frequency Domain Experimentation," Management Science, INFORMS, vol. 38(5), pages 667-687, May.
    2. Douglas J. Morrice & Lee W. Schruben, 1993. "Simulation Factor Screening Using Harmonic Analysis," Management Science, INFORMS, vol. 39(12), pages 1459-1476, December.
    3. Sheldon H. Jacobson & Arnold H. Buss & Lee W. Schruben, 1991. "Driving Frequency Selection for Frequency Domain Simulation Experiments," Operations Research, INFORMS, vol. 39(6), pages 917-924, December.
    4. Cabrera-Rios, Mauricio & Mount-Campbell, Clark A. & Irani, Shahrukh A., 2002. "An approach to the design of a manufacturing cell under economic considerations," International Journal of Production Economics, Elsevier, vol. 78(3), pages 223-237, August.
    5. Lee J. Krajewski & Barry E. King & Larry P. Ritzman & Danny S. Wong, 1987. "Kanban, MRP, and Shaping the Manufacturing Environment," Management Science, INFORMS, vol. 33(1), pages 39-57, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Linh N. K. Duong & Lincoln C. Wood & William Y. C. Wang, 2018. "Effects of Consumer Demand, Product Lifetime, and Substitution Ratio on Perishable Inventory Management," Sustainability, MDPI, vol. 10(5), pages 1-17, May.
    2. Happe, K. & Kellermann, K., 2008. "Diese Modelle sind zu komplex! – oder doch nicht?: Experimentelles Design und Metamodellierung als möglicher Weg, das Kommunikationsproblem agentenbasierter Modelle in der Politikanalyse zu lösen," Proceedings “Schriften der Gesellschaft für Wirtschafts- und Sozialwissenschaften des Landbaues e.V.”, German Association of Agricultural Economists (GEWISOLA), vol. 43, March.
    3. Happe, Kathrin & Kellermann, Konrad, 2007. "DIESE MODELLE SIND ZU KOMPLEX!-ODER DOCH NICHT?: EXPERIMENTELLES DESIGN UND METAMODELLIERUNG ALS MOGLICHER WEG, DAS KOMMUNIKATIONSPROBLEM AGENTENBASIERTER MODELLE IN DER POLITIKANALYSE ZU LOSEN (Germa," 47th Annual Conference, Weihenstephan, Germany, September 26-28, 2007 7613, German Association of Agricultural Economists (GEWISOLA).
    4. Wakiru, James M. & Pintelon, Liliane & Muchiri, Peter N. & Chemweno, Peter K., 2019. "A simulation-based optimization approach evaluating maintenance and spare parts demand interaction effects," International Journal of Production Economics, Elsevier, vol. 208(C), pages 329-342.
    5. Wen Shi & Xi Chen, 2018. "Efficient budget allocation strategies for elementary effects method in stochastic simulation," Naval Research Logistics (NRL), John Wiley & Sons, vol. 65(3), pages 218-241, April.
    6. Alexia P. Payan & Dimitri N. Mavris, 2016. "Multilevel Probabilistic Morphological Analysis for Facilitating Modeling and Simulation of Notional Scenarios," Systems Engineering, John Wiley & Sons, vol. 19(1), pages 3-23, January.
    7. Wen Shi & Xi Chen & Jennifer Shang, 2019. "An Efficient Morris Method-Based Framework for Simulation Factor Screening," INFORMS Journal on Computing, INFORMS, vol. 31(4), pages 745-770, October.
    8. Shi, Wen & Zhou, Qing & Zhou, Yanju, 2023. "An efficient elementary effect-based method for sensitivity analysis in identifying main and two-factor interaction effects," Reliability Engineering and System Safety, Elsevier, vol. 237(C).
    9. Shi, Wen & Chen, Xi, 2019. "Controlled Morris method: A new factor screening approach empowered by a distribution-free sequential multiple testing procedure," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 299-314.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Morgan, Lucy E. & Barton, Russell R., 2022. "Fourier trajectory analysis for system discrimination," European Journal of Operational Research, Elsevier, vol. 296(1), pages 203-217.
    2. Jack P. C. Kleijnen & Susan M. Sanchez & Thomas W. Lucas & Thomas M. Cioppa, 2005. "State-of-the-Art Review: A User’s Guide to the Brave New World of Designing Simulation Experiments," INFORMS Journal on Computing, INFORMS, vol. 17(3), pages 263-289, August.
    3. Kleijnen, J.P.C. & Sanchez, S.M. & Lucas, T.W. & Cioppa, T.M., 2003. "A User's Guide to the Brave New World of Designing Simulation Experiments," Discussion Paper 2003-1, Tilburg University, Center for Economic Research.
    4. Jacobson, Sheldon H., 1997. "The effect of initial transient on the steady-state simulation harmonic analysis gradient estimators," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 43(2), pages 209-221.
    5. Jonsson, Patrik, 2008. "Exploring problems related to the materials planning user environment," International Journal of Production Economics, Elsevier, vol. 113(1), pages 383-400, May.
    6. Solimanpur, M. & Vrat, Prem & Shankar, Ravi, 2004. "A heuristic to minimize makespan of cell scheduling problem," International Journal of Production Economics, Elsevier, vol. 88(3), pages 231-241, April.
    7. White, Richard E. & Prybutok, Victor, 2001. "The relationship between JIT practices and type of production system," Omega, Elsevier, vol. 29(2), pages 113-124, April.
    8. Gaury, E.G.A. & Pierreval, H. & Kleijnen, J.P.C., 1998. "New species of hybrid pull systems," Discussion Paper 1998-31, Tilburg University, Center for Economic Research.
    9. Fleisch, Elgar & Tellkamp, Christian, 2005. "Inventory inaccuracy and supply chain performance: a simulation study of a retail supply chain," International Journal of Production Economics, Elsevier, vol. 95(3), pages 373-385, March.
    10. Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
    11. Jacobs, F. Robert & Bendoly, Elliot, 2003. "Enterprise resource planning: Developments and directions for operations management research," European Journal of Operational Research, Elsevier, vol. 146(2), pages 233-240, April.
    12. Hirakawa, Yasuhiro, 1996. "Performance of a multistage hybrid push/pull production control system," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 129-135, June.
    13. Dolgui, Alexandre & Hashemi-Petroodi, S. Ehsan & Kovalev, Sergey & Kovalyov, Mikhail Y., 2021. "Profitability of a multi-model manufacturing line versus multiple dedicated lines," International Journal of Production Economics, Elsevier, vol. 236(C).
    14. repec:dgr:rugsom:02a42 is not listed on IDEAS
    15. Ishii, Kazuyoshi & Imori, Shigeki, 1996. "A production ordering system for two-item, two-stage, capacity-constraint production and inventory model," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 119-128, June.
    16. Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
    17. Oke, Adegoke & Szwejczewski, Marek, 2005. "The relationship between UK manufacturers' inventory levels and supply, internal and market factors," International Journal of Production Economics, Elsevier, vol. 93(1), pages 151-160, January.
    18. Riezebos, J., 1998. "Production planning systems for cellular manufacturing," Research Report 98A07, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    19. Hurley, Simon F. & Clay Whybark, D., 1999. "Inventory and capacity trade-offs in a manufacturing cell," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 203-212, March.
    20. Riezebos, Jan, 2002. "Time bucket size and lot-splitting approach," Research Report 02A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    21. Libralesso, Luc & Focke, Pablo Andres & Secardin, Aurélien & Jost, Vincent, 2022. "Iterative beam search algorithms for the permutation flowshop," European Journal of Operational Research, Elsevier, vol. 301(1), pages 217-234.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:103:y:2006:i:1:p:149-165. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.