IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v90y2004i2p237-249.html
   My bibliography  Save this article

Simulation results on the performance of Albin and Whitt's estimation method for waiting times in integrated production-inventory systems

Author

Listed:
  • Van Nyen, Pieter L. M.
  • Van Ooijen, Henny P. G.
  • Bertrand, J.W.M.J. Will M.

Abstract

No abstract is available for this item.

Suggested Citation

  • Van Nyen, Pieter L. M. & Van Ooijen, Henny P. G. & Bertrand, J.W.M.J. Will M., 2004. "Simulation results on the performance of Albin and Whitt's estimation method for waiting times in integrated production-inventory systems," International Journal of Production Economics, Elsevier, vol. 90(2), pages 237-249, July.
  • Handle: RePEc:eee:proeco:v:90:y:2004:i:2:p:237-249
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(03)00178-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Riddalls, C. E. & Bennett, S., 2001. "The optimal control of batched production and its effect on demand amplification," International Journal of Production Economics, Elsevier, vol. 72(2), pages 159-168, July.
    2. Tang, Ou & Grubbstrom, Robert W., 2002. "Planning and replanning the master production schedule under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 78(3), pages 323-334, August.
    3. Miron Livny & Benjamin Melamed & Athanassios K. Tsiolis, 1993. "The Impact of Autocorrelation on Queuing Systems," Management Science, INFORMS, vol. 39(3), pages 322-339, March.
    4. Samanta, B. & Al-Araimi, S. A., 2001. "An inventory control model using fuzzy logic," International Journal of Production Economics, Elsevier, vol. 73(3), pages 217-226, October.
    5. Ward Whitt, 1995. "Variability Functions for Parametric-Decomposition Approximations of Queueing Networks," Management Science, INFORMS, vol. 41(10), pages 1704-1715, October.
    6. Grubbstrom, Robert W. & Wang, Zhiping, 2003. "A stochastic model of multi-level/multi-stage capacity-constrained production-inventory systems," International Journal of Production Economics, Elsevier, vol. 81(1), pages 483-494, January.
    7. J. A. Buzacott & J. G. Shanthikumar, 1985. "On Approximate Queueing Models of Dynamic Job Shops," Management Science, INFORMS, vol. 31(7), pages 870-887, July.
    8. S. L. Albin, 1982. "On Poisson Approximations for Superposition Arrival Processes in Queues," Management Science, INFORMS, vol. 28(2), pages 126-137, February.
    9. Haskose, A. & Kingsman, B. G. & Worthington, D., 2002. "Modelling flow and jobbing shops as a queueing network for workload control," International Journal of Production Economics, Elsevier, vol. 78(3), pages 271-285, August.
    10. Gabriel R. Bitran & Devanath Tirupati, 1988. "Multiproduct Queueing Networks with Deterministic Routing: Decomposition Approach and the Notion of Interference," Management Science, INFORMS, vol. 34(1), pages 75-100, January.
    11. Tang, Ou & Grubbstrom, Robert W., 2003. "The detailed coordination problem in a two-level assembly system with stochastic lead times," International Journal of Production Economics, Elsevier, vol. 81(1), pages 415-429, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Rabta, Boualem, 2013. "A hybrid method for performance analysis of G/G/m queueing networks," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 89(C), pages 38-49.
    2. Macarena Lozano & Pilar Moreno, 2008. "A discrete time single-server queue with balking: economic applications," Applied Economics, Taylor & Francis Journals, vol. 40(6), pages 735-748.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Rabta, Boualem, 2013. "A hybrid method for performance analysis of G/G/m queueing networks," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 89(C), pages 38-49.
    2. Kris Lieckens & Nico Vandaele, 2016. "Differential evolution to solve the lot size problem in stochastic supply chain management systems," Annals of Operations Research, Springer, vol. 242(2), pages 239-263, July.
    3. Morabito, Reinaldo & de Souza, Mauricio C. & Vazquez, Mariana, 2014. "Approximate decomposition methods for the analysis of multicommodity flow routing in generalized queuing networks," European Journal of Operational Research, Elsevier, vol. 232(3), pages 618-629.
    4. Wu, Kan & Zhao, Ning, 2015. "Dependence among single stations in series and its applications in productivity improvement," European Journal of Operational Research, Elsevier, vol. 247(1), pages 245-258.
    5. Sunkyo Kim, 2011. "Modeling Cross Correlation in Three-Moment Four-Parameter Decomposition Approximation of Queueing Networks," Operations Research, INFORMS, vol. 59(2), pages 480-497, April.
    6. Marc R. Lambrecht & Philip L. Ivens & Nico J. Vandaele, 1998. "ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling," Management Science, INFORMS, vol. 44(11-Part-1), pages 1548-1561, November.
    7. Bitran, Gabriel R. & Morabito, Reinaldo., 1994. "Open queueing networks : optimization and performance evaluation models for discrete manufacturing systems," Working papers 3743-94., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    8. Ward Whitt & Wei You, 2018. "Using Robust Queueing to Expose the Impact of Dependence in Single-Server Queues," Operations Research, INFORMS, vol. 66(1), pages 184-199, January.
    9. Sunkyo Kim, 2005. "Approximation of multiclass queueing networks with highly variable arrivals under deterministic routing," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 399-408, August.
    10. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
    11. Kim, Sunkyo, 2004. "The heavy-traffic bottleneck phenomenon under splitting and superposition," European Journal of Operational Research, Elsevier, vol. 157(3), pages 736-745, September.
    12. Hill, R.M. & Seifbarghy, M. & Smith, D.K., 2007. "A two-echelon inventory model with lost sales," European Journal of Operational Research, Elsevier, vol. 181(2), pages 753-766, September.
    13. Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
    14. Carole Camisullis & Vincent Giard, 2010. "Détermination des stocks de sécurité dans une chaîne logistique-amont dédiée à une production de masse de produits fortement diversifiés," Working Papers hal-00876986, HAL.
    15. Girish, Muckai K. & Hu, Jian-Qiang, 2001. "Approximations for the departure process of the G/G/1 queue with Markov-modulated arrivals," European Journal of Operational Research, Elsevier, vol. 134(3), pages 540-556, November.
    16. Ananth. V. Iyer, 2002. "Inventory cost impact of order processing priorities based on demand uncertainty," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(4), pages 376-390, June.
    17. Sohner, Volkmar & Schneeweiss, Christoph, 1995. "Hierarchically integrated lot size optimization," European Journal of Operational Research, Elsevier, vol. 86(1), pages 73-90, October.
    18. Pradhan, Salil & Damodaran, Purushothaman & Srihari, Krishnaswami, 2008. "Predicting performance measures for Markovian type of manufacturing systems with product failures," European Journal of Operational Research, Elsevier, vol. 184(2), pages 725-744, January.
    19. Hejn Nielsen, Erland, 2007. "Autocorrelation in queuing network-type production systems--Revisited," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 138-146, October.
    20. S. Rajagopalan, 2002. "Make to Order or Make to Stock: Model and Application," Management Science, INFORMS, vol. 48(2), pages 241-256, February.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:90:y:2004:i:2:p:237-249. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.