IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v88y2004i3p257-267.html
   My bibliography  Save this article

A case study on the multistage IC final testing scheduling problem with reentry

Author

Listed:
  • Pearn, W. L.
  • Chung, S. H.
  • Chen, A. Y.
  • Yang, M. H.

Abstract

No abstract is available for this item.

Suggested Citation

  • Pearn, W. L. & Chung, S. H. & Chen, A. Y. & Yang, M. H., 2004. "A case study on the multistage IC final testing scheduling problem with reentry," International Journal of Production Economics, Elsevier, vol. 88(3), pages 257-267, April.
  • Handle: RePEc:eee:proeco:v:88:y:2004:i:3:p:257-267
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(03)00186-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Yalaoui, Farouk & Chu, Chengbin, 2002. "Parallel machine scheduling to minimize total tardiness," International Journal of Production Economics, Elsevier, vol. 76(3), pages 265-279, April.
    2. Potvin, Jean-Yves & Rousseau, Jean-Marc, 1993. "A parallel route building algorithm for the vehicle routing and scheduling problem with time windows," European Journal of Operational Research, Elsevier, vol. 66(3), pages 331-340, May.
    3. W L Pearn & S H Chung & M H Yang, 2002. "The wafer probing scheduling problem (WPSP)," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 53(8), pages 864-874, August.
    4. Kemal Altinkemer & Bezalel Gavish, 1991. "Parallel Savings Based Heuristics for the Delivery Problem," Operations Research, INFORMS, vol. 39(3), pages 456-469, June.
    5. Schutten, J. M. J. & Leussink, R. A. M., 1996. "Parallel machine scheduling with release dates, due dates and family setup times," International Journal of Production Economics, Elsevier, vol. 46(1), pages 119-125, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. S-W Choi & Y-D Kim, 2007. "Minimizing makespan on a two-machine re-entrant flowshop," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(7), pages 972-981, July.
    2. Choi, Seong-Woo & Kim, Yeong-Dae, 2009. "Minimizing total tardiness on a two-machine re-entrant flowshop," European Journal of Operational Research, Elsevier, vol. 199(2), pages 375-384, December.
    3. Hyun Joong Yoon & Junjae Chae, 2019. "Simulation Study for Semiconductor Manufacturing System: Dispatching Policies for a Wafer Test Facility," Sustainability, MDPI, vol. 11(4), pages 1-21, February.
    4. Zhang, Zhicong & Zheng, Li & Hou, Forest & Li, Na, 2011. "Semiconductor final test scheduling with Sarsa([lambda], k) algorithm," European Journal of Operational Research, Elsevier, vol. 215(2), pages 446-458, December.
    5. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
    6. Allahverdi, Ali & Soroush, H.M., 2008. "The significance of reducing setup times/setup costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 978-984, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. W L Pearn & S H Chung & M H Yang & Y H Chen, 2004. "Algorithms for the wafer probing scheduling problem with sequence-dependent set-up time and due date restrictions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(11), pages 1194-1207, November.
    2. Poot, A. & Kant, G. & Wagelmans, A.P.M., 1999. "A savings based method for real-life vehicle routing problems," Econometric Institute Research Papers EI 9938/A, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    3. Chen, Jeng-Fung & Wu, Tai-Hsi, 2006. "Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints," Omega, Elsevier, vol. 34(1), pages 81-89, January.
    4. Yalaoui, F. & Chu, C., 2006. "New exact method to solve the Pm/rj/[summation operator]Cj schedule problem," International Journal of Production Economics, Elsevier, vol. 100(1), pages 168-179, March.
    5. Ido Orenstein & Tal Raviv & Elad Sadan, 2019. "Flexible parcel delivery to automated parcel lockers: models, solution methods and analysis," EURO Journal on Transportation and Logistics, Springer;EURO - The Association of European Operational Research Societies, vol. 8(5), pages 683-711, December.
    6. Camila Ramos & Alejandro Cataldo & Juan–Carlos Ferrer, 2020. "Appointment and patient scheduling in chemotherapy: a case study in Chilean hospitals," Annals of Operations Research, Springer, vol. 286(1), pages 411-439, March.
    7. Deck, Cary & Sheremeta, Roman M., 2019. "The tug-of-war in the laboratory," European Journal of Political Economy, Elsevier, vol. 60(C).
    8. Liu, Fuh-Hwa Franklin & Shen, Sheng-Yuan, 1999. "A route-neighborhood-based metaheuristic for vehicle routing problem with time windows," European Journal of Operational Research, Elsevier, vol. 118(3), pages 485-504, November.
    9. Baals, Julian & Emde, Simon & Turkensteen, Marcel, 2023. "Minimizing earliness-tardiness costs in supplier networks—A just-in-time truck routing problem," European Journal of Operational Research, Elsevier, vol. 306(2), pages 707-741.
    10. Hinder, Oliver & Mason, Andrew J., 2017. "A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness," European Journal of Operational Research, Elsevier, vol. 262(2), pages 411-423.
    11. Masson, Renaud & Lahrichi, Nadia & Rousseau, Louis-Martin, 2016. "A two-stage solution method for the annual dairy transportation problem," European Journal of Operational Research, Elsevier, vol. 251(1), pages 36-43.
    12. Shuwan Zhu & Wenjuan Fan & Xueping Li & Shanlin Yang, 2023. "Ambulance dispatching and operating room scheduling considering reusable resources in mass-casualty incidents," Operational Research, Springer, vol. 23(2), pages 1-37, June.
    13. Thomas R. Visser & Remy Spliet, 2020. "Efficient Move Evaluations for Time-Dependent Vehicle Routing Problems," Transportation Science, INFORMS, vol. 54(4), pages 1091-1112, July.
    14. Attila A. Kovacs & Bruce L. Golden & Richard F. Hartl & Sophie N. Parragh, 2015. "The Generalized Consistent Vehicle Routing Problem," Transportation Science, INFORMS, vol. 49(4), pages 796-816, November.
    15. Ruf, Moritz & Cordeau, Jean-François, 2021. "Adaptive large neighborhood search for integrated planning in railroad classification yards," Transportation Research Part B: Methodological, Elsevier, vol. 150(C), pages 26-51.
    16. Diana, Marco & Dessouky, Maged M., 2004. "A new regret insertion heuristic for solving large-scale dial-a-ride problems with time windows," Transportation Research Part B: Methodological, Elsevier, vol. 38(6), pages 539-557, July.
    17. Ribeiro, Glaydston Mattos & Laporte, Gilbert & Mauri, Geraldo Regis, 2012. "A comparison of three metaheuristics for the workover rig routing problem," European Journal of Operational Research, Elsevier, vol. 220(1), pages 28-36.
    18. Olli Bräysy & Michel Gendreau, 2005. "Vehicle Routing Problem with Time Windows, Part II: Metaheuristics," Transportation Science, INFORMS, vol. 39(1), pages 119-139, February.
    19. Yu, Mingzhu & Qi, Xiangtong, 2014. "A vehicle routing problem with multiple overlapped batches," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 61(C), pages 40-55.
    20. Abdelkader Sbihi & Richard W. Eglese, 2007. "The Relationship between Vehicle Routing & Scheduling and Green Logistics - A Literature Survey," Working Papers hal-00644133, HAL.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:88:y:2004:i:3:p:257-267. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.