The significance of reducing setup times/setup costs
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
- R. J. Paul, 1979. "A Production Scheduling Problem in the Glass-Container Industry," Operations Research, INFORMS, vol. 27(2), pages 290-302, April.
- Lee J. Krajewski & Barry E. King & Larry P. Ritzman & Danny S. Wong, 1987. "Kanban, MRP, and Shaping the Manufacturing Environment," Management Science, INFORMS, vol. 33(1), pages 39-57, January.
- Lin, Hung-Tso & Liao, Ching-Jong, 2003. "A case study in a two-stage hybrid flow shop with setup time and dedicated machines," International Journal of Production Economics, Elsevier, vol. 86(2), pages 133-143, November.
- Allahverdi, Ali & Al-Anzi, Fawaz S., 2006. "A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times," European Journal of Operational Research, Elsevier, vol. 169(3), pages 767-780, March.
- Gupta, A.K. & Sivakumar, A.I., 2005. "Multi-objective scheduling of two-job families on a single machine," Omega, Elsevier, vol. 33(5), pages 399-405, October.
- Fortemps, Ph. & Ost, Ch. & Pirlot, M. & Teghem, J. & Tuyttens, D., 1996. "Using metaheuristics for solving a production scheduling problem in a chemical firm. A case study," International Journal of Production Economics, Elsevier, vol. 46(1), pages 13-26, December.
- Andres, Carlos & Albarracin, Jose Miguel & Tormo, Guillermina & Vicens, Eduardo & Garcia-Sabater, Jose Pedro, 2005. "Group technology in a hybrid flowshop environment: A case study," European Journal of Operational Research, Elsevier, vol. 167(1), pages 272-281, November.
- Khorana, Ajay & Servaes, Henri & Tufano, Peter, 2005. "Explaining the size of the mutual fund industry around the world," Journal of Financial Economics, Elsevier, vol. 78(1), pages 145-185, October.
- Li, Shanling, 1997. "A hybrid two-stage flowshop with part family, batch production, major and minor set-ups," European Journal of Operational Research, Elsevier, vol. 102(1), pages 142-156, October.
- Pearn, W. L. & Chung, S. H. & Chen, A. Y. & Yang, M. H., 2004. "A case study on the multistage IC final testing scheduling problem with reentry," International Journal of Production Economics, Elsevier, vol. 88(3), pages 257-267, April.
- Chen, Jeng-Fung & Wu, Tai-Hsi, 2006. "Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints," Omega, Elsevier, vol. 34(1), pages 81-89, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Allahverdi, Ali, 2015. "The third comprehensive survey on scheduling problems with setup times/costs," European Journal of Operational Research, Elsevier, vol. 246(2), pages 345-378.
- Pan, Quan-Ke & Ruiz, Rubén, 2012. "An estimation of distribution algorithm for lot-streaming flow shop problems with setup times," Omega, Elsevier, vol. 40(2), pages 166-180, April.
- Nusrat T. Chowdhury & Fazle Baki & A. Azab, 2023. "The Setup Carryover Assignment Problem," SN Operations Research Forum, Springer, vol. 4(2), pages 1-13, June.
- Gharbi, Anis & Ladhari, Talel & Msakni, Mohamed Kais & Serairi, Mehdi, 2013. "The two-machine flowshop scheduling problem with sequence-independent setup times: New lower bounding strategies," European Journal of Operational Research, Elsevier, vol. 231(1), pages 69-78.
- Stefansdottir, Bryndis & Grunow, Martin & Akkerman, Renzo, 2017. "Classifying and modeling setups and cleanings in lot sizing and scheduling," European Journal of Operational Research, Elsevier, vol. 261(3), pages 849-865.
- Ruiz, Rubén & Vázquez-Rodríguez, José Antonio, 2010. "The hybrid flow shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 205(1), pages 1-18, August.
- A.C. Mahasinghe & L.A. Sarathchandra, 2020. "An Optimization Model for Production Planning in the Synthetic Fertilizer Industry," Advances in Decision Sciences, Asia University, Taiwan, vol. 24(3), pages 28-62, September.
- Kangbok Lee & Lei Lei & Michael Pinedo, 2012. "Production scheduling with history‐dependent setup times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(1), pages 58-68, February.
- Sheikh, Shaya & Komaki, G.M. & Kayvanfar, Vahid & Teymourian, Ehsan, 2019. "Multi-Stage assembly flow shop with setup time and release time," Operations Research Perspectives, Elsevier, vol. 6(C).
- Allahverdi, Ali, 2016. "A survey of scheduling problems with no-wait in process," European Journal of Operational Research, Elsevier, vol. 255(3), pages 665-686.
- Anne Benoit & Mathias Coqblin & Jean-Marc Nicod & Veronika Rehn-Sonigo, 2016. "Optimizing memory allocation for multistage scheduling including setup times," Journal of Scheduling, Springer, vol. 19(6), pages 641-658, December.
- Dominik Kress & David Müller & Jenny Nossack, 2019. "A worker constrained flexible job shop scheduling problem with sequence-dependent setup times," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(1), pages 179-217, March.
- Stef Moons & Katrien Ramaekers & An Caris & Yasemin Arda, 2018. "Integration of order picking and vehicle routing in a B2C e-commerce context," Flexible Services and Manufacturing Journal, Springer, vol. 30(4), pages 813-843, December.
- Sioud, A. & Gagné, C., 2018. "Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times," European Journal of Operational Research, Elsevier, vol. 264(1), pages 66-73.
- Abdelhak Elidrissi & Rachid Benmansour & Nicolas Zufferey & Mohammed Benbrahim & David Duvivier, 2024. "Minimization of maximum lateness on parallel machines with a single server and job release dates," 4OR, Springer, vol. 22(3), pages 351-385, September.
- A.C. Mahasinghe & L.A. Sarathchandra, 2020. "An Optimization Model for Production Planning in the Synthetic Fertilizer Industry," International Association of Decision Sciences, Asia University, Taiwan, vol. 24(3), pages 28-62, September.
- Jin Xu & Natarajan Gautam, 2020. "On competitive analysis for polling systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(6), pages 404-419, September.
- Rafiei, Rezvan & Nourelfath, Mustapha & Gaudreault, Jonathan & De Santa-Eulalia, Luis Antonio & Bouchard, Mathieu, 2015. "Dynamic safety stock in co-production demand-driven wood remanufacturing mills: A case study," International Journal of Production Economics, Elsevier, vol. 165(C), pages 90-99.
- Yao, Shiqing & Jiang, Zhibin & Li, Na & Zhang, Huai & Geng, Na, 2011. "A multi-objective dynamic scheduling approach using multiple attribute decision making in semiconductor manufacturing," International Journal of Production Economics, Elsevier, vol. 130(1), pages 125-133, March.
- Allahverdi, Ali & Aydilek, Harun, 2014. "Total completion time with makespan constraint in no-wait flowshops with setup times," European Journal of Operational Research, Elsevier, vol. 238(3), pages 724-734.
- Sunantha Teyarachakul & Suresh Chand & Michal Tzur, 2016. "Lot sizing with learning and forgetting in setups: Analytical results and insights," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(2), pages 93-108, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
- Nait Tahar, Djamel & Yalaoui, Farouk & Chu, Chengbin & Amodeo, Lionel, 2006. "A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 63-73, February.
- Ruiz, Rubén & Vázquez-Rodríguez, José Antonio, 2010. "The hybrid flow shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 205(1), pages 1-18, August.
- Feng, Hanxin & Xi, Lifeng & Xiao, Lei & Xia, Tangbin & Pan, Ershun, 2018. "Imperfect preventive maintenance optimization for flexible flowshop manufacturing cells considering sequence-dependent group scheduling," Reliability Engineering and System Safety, Elsevier, vol. 176(C), pages 218-229.
- Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
- Portmann, M. -C. & Vignier, A. & Dardilhac, D. & Dezalay, D., 1998. "Branch and bound crossed with GA to solve hybrid flowshops," European Journal of Operational Research, Elsevier, vol. 107(2), pages 389-400, June.
- S. M. Mousavi & I. Mahdavi & J. Rezaeian & M. Zandieh, 2018. "An efficient bi-objective algorithm to solve re-entrant hybrid flow shop scheduling with learning effect and setup times," Operational Research, Springer, vol. 18(1), pages 123-158, April.
- Pang, King-Wah, 2013. "A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness," International Journal of Production Economics, Elsevier, vol. 141(1), pages 127-136.
- Andres, Carlos & Albarracin, Jose Miguel & Tormo, Guillermina & Vicens, Eduardo & Garcia-Sabater, Jose Pedro, 2005. "Group technology in a hybrid flowshop environment: A case study," European Journal of Operational Research, Elsevier, vol. 167(1), pages 272-281, November.
- Antonio Costa & Fulvio Antonio Cappadonna & Sergio Fichera, 2017. "A hybrid genetic algorithm for minimizing makespan in a flow-shop sequence-dependent group scheduling problem," Journal of Intelligent Manufacturing, Springer, vol. 28(6), pages 1269-1283, August.
- Missaoui, Ahmed & Ruiz, Rubén, 2022. "A parameter-Less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows," European Journal of Operational Research, Elsevier, vol. 303(1), pages 99-113.
- Wen-Min Lu & Qian Long Kweh & Chung-Wei Wang, 2021. "Integration and application of rough sets and data envelopment analysis for assessments of the investment trusts industry," Annals of Operations Research, Springer, vol. 296(1), pages 163-194, January.
- Jonsson, Patrik, 2008. "Exploring problems related to the materials planning user environment," International Journal of Production Economics, Elsevier, vol. 113(1), pages 383-400, May.
- Aman, Hiroyuki & Motonishi, Taizo & Ogawa, Kazuhito & Omori, Kozo, 2024. "The effect of financial literacy on long-term recognition and short-term trade in mutual funds: Evidence from Japan," International Review of Economics & Finance, Elsevier, vol. 89(PB), pages 762-783.
- Sanchez, Susan M. & Moeeni, Farhad & Sanchez, Paul J., 2006. "So many factors, so little time...Simulation experiments in the frequency domain," International Journal of Production Economics, Elsevier, vol. 103(1), pages 149-165, September.
- Marko Ɖurasević & Domagoj Jakobović, 2019. "Creating dispatching rules by simple ensemble combination," Journal of Heuristics, Springer, vol. 25(6), pages 959-1013, December.
- Markus Ibert & Ron Kaniel & Stijn Van Nieuwerburgh & Roine Vestman, 2018.
"Are Mutual Fund Managers Paid for Investment Skill?,"
The Review of Financial Studies, Society for Financial Studies, vol. 31(2), pages 715-772.
- Markus Ibert & Ron Kaniel & Stijn Van Nieuwerburgh & Roine Vestman, 2017. "Are Mutual Fund Managers Paid For Investment Skill?," NBER Working Papers 23373, National Bureau of Economic Research, Inc.
- Kaniel, Ron & Ibert, Markus & Van Nieuwerburgh, Stijn & Vestman, Roine, 2017. "Are Mutual Fund Managers Paid For Investment Skill?," CEPR Discussion Papers 12241, C.E.P.R. Discussion Papers.
- Van Nieuwerburgh, Stijn & Vestman, Roine & Kaniel, Ron & Ibert, Markus, 2017. "Are Mutual Fund Managers Paid For Investment Skill?," CEPR Discussion Papers 12010, C.E.P.R. Discussion Papers.
- Byung-Cheon Choi & Myoung-Ju Park, 2015. "A Batch Scheduling Problem with Two Agents," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 32(06), pages 1-19, December.
- Qitong Yu & Shaoyang Fang & Jianjun Wang, 2018. "A Study on the Influence of Institutional Investor Heterogeneity on the Executive Pay Stickiness¡ª¡ªBased on the Perspective of Industrial Factor Intensity," International Journal of Economics and Finance, Canadian Center of Science and Education, vol. 10(9), pages 168-168, September.
- Faias, José A. & Ferreira, Miguel A., 2017.
"Does institutional ownership matter for international stock return comovement?,"
Journal of International Money and Finance, Elsevier, vol. 78(C), pages 64-83.
- Jose Faias & Miguel Ferreira & Pedro Santa-Clara & Pedro Matos, 2011. "Does Institutional Ownership Matter for International Stock Return Comovement?," EcoMod2011 3038, EcoMod.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:187:y:2008:i:3:p:978-984. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.