Ablauforganisation bei Serienproduktion in Fließfertigungssystemen

Author

Listed:
  • Alf Kimms

    (Christian-Albrechts-Universität zu Kiel)

Abstract

Summary Most production planning Software packages rely on the logic of manufacturing resource planning (MRP II). This contribution reveals that MRP II does not satisfy, but is the reason for long lead-times, high work-in-process, and large inventories. The paper reviews hierarchical approaches which dominate the MRP II-logic. Making one step further, the paper also discusses the problem of simultaneous lot sizing and scheduling in the presence of multi-level gozinto-structures and scarce capacities.

Suggested Citation

  • Alf Kimms, 1998. "Ablauforganisation bei Serienproduktion in Fließfertigungssystemen," Schmalenbach Journal of Business Research, Springer, vol. 50(7), pages 641-655, July.
  • Handle: RePEc:spr:sjobre:v:50:y:1998:i:7:d:10.1007_bf03371526
    DOI: 10.1007/BF03371526
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/BF03371526
    File Function: Abstract
    Download Restriction: no

    File URL: https://libkey.io/10.1007/BF03371526?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Ford W. Harris, 1990. "How Many Parts to Make at Once," Operations Research, INFORMS, vol. 38(6), pages 947-950, December.
    2. Blazewicz, Jacek & Domschke, Wolfgang & Pesch, Erwin, 1996. "The job shop scheduling problem: Conventional and new solution techniques," European Journal of Operational Research, Elsevier, vol. 93(1), pages 1-33, August.
    3. Robin O. Roundy, 1993. "Efficient, Effective Lot Sizing for Multistage Production Systems," Operations Research, INFORMS, vol. 41(2), pages 371-385, April.
    4. Dauzere-Peres, Stephane & Lasserre, Jean-Bernard, 1994. "Integration of lotsizing and scheduling decisions in a job-shop," European Journal of Operational Research, Elsevier, vol. 75(2), pages 413-426, June.
    5. Haase, Knut & Kimms, Alf, 1996. "Lot sizing and scheduling with sequence dependent setup costs and times and efficient rescheduling opportunities," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 393, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    6. Maes, Johan & McClain, John O. & Van Wassenhove, Luk N., 1991. "Multilevel capacitated lotsizing complexity and LP-based heuristics," European Journal of Operational Research, Elsevier, vol. 53(2), pages 131-148, July.
    7. Panayotis Afentakis & Bezalel Gavish, 1986. "Optimal Lot-Sizing Algorithms for Complex Product Structures," Operations Research, INFORMS, vol. 34(2), pages 237-249, April.
    8. Wolsey, L. A., 1995. "Progress with single-item lot-sizing," LIDAM Reprints CORE 1174, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    9. Wolsey, Laurence A., 1995. "Progress with single-item lot-sizing," European Journal of Operational Research, Elsevier, vol. 86(3), pages 395-401, November.
    10. Panayotis Afentakis & Bezalel Gavish & Uday Karmarkar, 1984. "Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems," Management Science, INFORMS, vol. 30(2), pages 222-239, February.
    11. Roll, Yaakov & Karni, Reuven, 1991. "Multi-item, multi-level lot sizing with an aggregate capacity constraint," European Journal of Operational Research, Elsevier, vol. 51(1), pages 73-87, March.
    12. Fleischmann, B. & Meyr, H., 1997. "The General Lotsizing and Scheduling Problem," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 36068, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    13. Drexl, Andreas & Haase, Knut, 1995. "Proportional lotsizing and scheduling," International Journal of Production Economics, Elsevier, vol. 40(1), pages 73-87, June.
    14. Stadtler, Hartmut, 1996. "Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing," European Journal of Operational Research, Elsevier, vol. 94(3), pages 561-581, November.
    15. Gary D. Eppen & R. Kipp Martin, 1987. "Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition," Operations Research, INFORMS, vol. 35(6), pages 832-848, December.
    16. Zapfel, Gunther & Missbauer, Hubert, 1993. "New concepts for production planning and control," European Journal of Operational Research, Elsevier, vol. 67(3), pages 297-320, June.
    17. Kuik, Roelof & Salomon, Marc & van Wassenhove, Luk N., 1994. "Batching decisions: structure and models," European Journal of Operational Research, Elsevier, vol. 75(2), pages 243-263, June.
    18. Harish C. Bahl & Larry P. Ritzman & Jatinder N. D. Gupta, 1987. "OR Practice—Determining Lot Sizes and Resource Requirements: A Review," Operations Research, INFORMS, vol. 35(3), pages 329-345, June.
    19. Fleischmann, Bernhard, 1990. "The discrete lot-sizing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 44(3), pages 337-348, February.
    20. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
    21. Goyal, S. K. & Gunasekaran, A., 1990. "Multi-stage production-inventory systems," European Journal of Operational Research, Elsevier, vol. 46(1), pages 1-20, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    2. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
    3. Drexl, Andreas & Jordan, Carsten & Kimms, Alf, 1997. "Gruppierungs- und Reihenfolgeprobleme in der Fertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 447, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    4. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    5. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    6. Daniel Quadt & Heinrich Kuhn, 2009. "Capacitated lot‐sizing and scheduling with parallel machines, back‐orders, and setup carry‐over," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(4), pages 366-384, June.
    7. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
    8. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
    9. A. Kimms, 1997. "Demand shuffle—A method for multilevel proportional lot sizing and scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(4), pages 319-340, June.
    10. Helber, Stefan & Sahling, Florian, 2010. "A fix-and-optimize approach for the multi-level capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
    11. Wolter, Anja & Helber, Stefan, 2013. "Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and Intensive Wear and Tear," Hannover Economic Papers (HEP) dp-522, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
    12. Drexl, Andreas & Kimms, Alf, 1996. "Lot sizing and scheduling: Survey and extensions," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 421, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    13. Drexl, Andreas & Haase, Knut, 1992. "A new type of model for multi-item capacitated dynamic lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 286, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    14. Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.
    15. Meyr, H., 2000. "Simultaneous lotsizing and scheduling by combining local search with dual reoptimization," European Journal of Operational Research, Elsevier, vol. 120(2), pages 311-326, January.
    16. Kimms, Alf & Drexl, Andreas, 1996. "Shortcomings of MRP II and a new planning meta-method," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 404, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    17. Christopher Suerie & Hartmut Stadtler, 2003. "The Capacitated Lot-Sizing Problem with Linked Lot Sizes," Management Science, INFORMS, vol. 49(8), pages 1039-1054, August.
    18. Karina Copil & Martin Wörbelauer & Herbert Meyr & Horst Tempelmeier, 2017. "Simultaneous lotsizing and scheduling problems: a classification and review of models," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 1-64, January.
    19. Drexl, Andreas & Haase, Knut, 1995. "Proportional lotsizing and scheduling," International Journal of Production Economics, Elsevier, vol. 40(1), pages 73-87, June.
    20. Fabrizio Marinelli & Maria Nenni & Antonio Sforza, 2007. "Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company," Annals of Operations Research, Springer, vol. 150(1), pages 177-192, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:sjobre:v:50:y:1998:i:7:d:10.1007_bf03371526. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.