IDEAS home Printed from https://ideas.repec.org/p/han/dpaper/dp-522.html
   My bibliography  Save this paper

Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and Intensive Wear and Tear

Author

Listed:
  • Wolter, Anja
  • Helber, Stefan

Abstract

This paper presents a generic modeling framework to simultaneously decide about production quantities and maintenance operations for a capacitated resource facing a dynamic demand for di erent types of products. As the resource needs to be setup for each speci c type of product, a lot-sizing problem occurs. In addition it is assumed that production causes intensive wear and tear. For this reason frequent maintenance activities need to be coordinated with the production operations in order to e ciently use the capacitated resource. A single generic model is presented to capture alternative forms of maintenance and di erent modes of interaction between maintenance and setups. As the model is numerically intractable for standard branch & bound algorithms, we solve it heuristically via a decomposition using a Fix-and-Optimize approach. Numerical results show that the proposed solution method produces high-quality results quickly. We further study the impact of simultaneous vs. sequential decisions about production and maintenance in the case of intensive wear and tear.

Suggested Citation

  • Wolter, Anja & Helber, Stefan, 2013. "Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and Intensive Wear and Tear," Hannover Economic Papers (HEP) dp-522, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
  • Handle: RePEc:han:dpaper:dp-522
    as

    Download full text from publisher

    File URL: http://diskussionspapiere.wiwi.uni-hannover.de/pdf_bib/dp-522.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Chelbi, Anis & Ait-Kadi, Daoud, 2004. "Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance," European Journal of Operational Research, Elsevier, vol. 156(3), pages 712-718, August.
    2. Wolsey, L. A., 1995. "Progress with single-item lot-sizing," LIDAM Reprints CORE 1174, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    3. Fleischmann, B. & Meyr, H., 1997. "The General Lotsizing and Scheduling Problem," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 36068, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    4. Drexl, Andreas & Haase, Knut, 1995. "Proportional lotsizing and scheduling," International Journal of Production Economics, Elsevier, vol. 40(1), pages 73-87, June.
    5. Aghezzaf, E.H. & Jamali, M.A. & Ait-Kadi, D., 2007. "An integrated production and preventive maintenance planning model," European Journal of Operational Research, Elsevier, vol. 181(2), pages 679-685, September.
    6. Yuan, Jinjiang & Qi, Xianglai & Lu, Lingfa & Li, Wenhua, 2008. "Single machine unbounded parallel-batch scheduling with forbidden intervals," European Journal of Operational Research, Elsevier, vol. 186(3), pages 1212-1217, May.
    7. X Qi & T Chen & F Tu, 1999. "Scheduling the maintenance on a single machine," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(10), pages 1071-1078, October.
    8. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
    9. Allaoui, H. & Lamouri, S. & Artiba, A. & Aghezzaf, E., 2008. "Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan," International Journal of Production Economics, Elsevier, vol. 112(1), pages 161-167, March.
    10. Gharbi, A. & Kenne, J.-P. & Beit, M., 2007. "Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems," International Journal of Production Economics, Elsevier, vol. 107(2), pages 422-434, June.
    11. Lee, Chung-Yee & Lin, Chen-Sin, 2001. "Single-machine scheduling with maintenance and repair rate-modifying activities," European Journal of Operational Research, Elsevier, vol. 135(3), pages 493-513, December.
    12. Helber, Stefan & Sahling, Florian, 2010. "A fix-and-optimize approach for the multi-level capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
    13. Wolsey, Laurence A., 1995. "Progress with single-item lot-sizing," European Journal of Operational Research, Elsevier, vol. 86(3), pages 395-401, November.
    14. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    15. M. A. Kubzin & V. A. Strusevich, 2006. "Planning Machine Maintenance in Two-Machine Shop Scheduling," Operations Research, INFORMS, vol. 54(4), pages 789-800, August.
    16. Kuik, Roelof & Salomon, Marc & van Wassenhove, Luk N., 1994. "Batching decisions: structure and models," European Journal of Operational Research, Elsevier, vol. 75(2), pages 243-263, June.
    17. Marc Salomon & Leo G. Kroon & Roelof Kuik & Luk N. Van Wassenhove, 1991. "Some Extensions of the Discrete Lotsizing and Scheduling Problem," Management Science, INFORMS, vol. 37(7), pages 801-812, July.
    18. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
    19. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hendrik Butemann & Katja Schimmelpfeng, 2020. "Long-term electricity production planning of a flexible biogas plant considering wear and tear," Journal of Business Economics, Springer, vol. 90(9), pages 1289-1313, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sahling, Florian & Buschkühl, Lisbeth & Tempelmeier, Horst & Helber, Stefan, 2008. "Solving a Multi-Level Capacitated Lot Sizing Problem with Multi-Period Setup Carry-Over via a Fix-and-Optimize Heuristic," Hannover Economic Papers (HEP) dp-400, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
    2. Helber, Stefan & Sahling, Florian, 2010. "A fix-and-optimize approach for the multi-level capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
    3. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    4. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    5. Alf Kimms, 1998. "Ablauforganisation bei Serienproduktion in Fließfertigungssystemen," Schmalenbach Journal of Business Research, Springer, vol. 50(7), pages 641-655, July.
    6. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
    7. Ferreira, Deisemara & Clark, Alistair R. & Almada-Lobo, Bernardo & Morabito, Reinaldo, 2012. "Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production," International Journal of Production Economics, Elsevier, vol. 136(2), pages 255-265.
    8. Drexl, Andreas & Jordan, Carsten & Kimms, Alf, 1997. "Gruppierungs- und Reihenfolgeprobleme in der Fertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 447, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    9. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
    10. Daniel Quadt & Heinrich Kuhn, 2009. "Capacitated lot‐sizing and scheduling with parallel machines, back‐orders, and setup carry‐over," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(4), pages 366-384, June.
    11. Meyr, H., 2000. "Simultaneous lotsizing and scheduling by combining local search with dual reoptimization," European Journal of Operational Research, Elsevier, vol. 120(2), pages 311-326, January.
    12. Melega, Gislaine Mara & de Araujo, Silvio Alexandre & Jans, Raf, 2018. "Classification and literature review of integrated lot-sizing and cutting stock problems," European Journal of Operational Research, Elsevier, vol. 271(1), pages 1-19.
    13. LAMAS, ALEJANDRO & CHEVALIER, Philippe, 2013. "Jumping the hurdles for collaboration: fairness in operations pooling in the absence of transfer payments," LIDAM Discussion Papers CORE 2013073, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    14. Lamas, Alejandro & Chevalier, Philippe, 2018. "Joint dynamic pricing and lot-sizing under competition," European Journal of Operational Research, Elsevier, vol. 266(3), pages 864-876.
    15. Yajaira Cardona-Valdés & Samuel Nucamendi-Guillén & Rodrigo E. Peimbert-García & Gustavo Macedo-Barragán & Eduardo Díaz-Medina, 2020. "A New Formulation for the Capacitated Lot Sizing Problem with Batch Ordering Allowing Shortages," Mathematics, MDPI, vol. 8(6), pages 1-16, June.
    16. Nascimento, Mariá C.V. & Resende, Mauricio G.C. & Toledo, Franklina M.B., 2010. "GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem," European Journal of Operational Research, Elsevier, vol. 200(3), pages 747-754, February.
    17. Cattani, Kyle D., 2016. "Fenced in? Stochastic and deterministic planning models in a time-fenced, rolling-horizon scheduling systemAuthor-Name: DeYong, Gregory D," European Journal of Operational Research, Elsevier, vol. 251(1), pages 85-95.
    18. Camargo, Victor C.B. & Toledo, Franklina M.B. & Almada-Lobo, Bernardo, 2014. "HOPS – Hamming-Oriented Partition Search for production planning in the spinning industry," European Journal of Operational Research, Elsevier, vol. 234(1), pages 266-277.
    19. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    20. Meyr, Herbert, 2002. "Simultaneous lotsizing and scheduling on parallel machines," European Journal of Operational Research, Elsevier, vol. 139(2), pages 277-292, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:han:dpaper:dp-522. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Heidrich, Christian (email available below). General contact details of provider: https://edirc.repec.org/data/fwhande.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.