Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Clyde L. Monma & Chris N. Potts, 1989. "On the Complexity of Scheduling with Batch Setup Times," Operations Research, INFORMS, vol. 37(5), pages 798-804, October.
- אסתר טולידנו, 1998. "מקבלי דמי אבטלה, 1997," Working Papers 415, National Insurance Institute of Israel.
- Riezebos, J. & Gaalman, G. J. C., 1998. "Time lag size in multiple operations flow shop scheduling heuristics," European Journal of Operational Research, Elsevier, vol. 105(1), pages 72-90, February.
- Rios-Mercado, Roger Z. & Bard, Jonathan F., 1998. "Heuristics for the flow line problem with setup costs," European Journal of Operational Research, Elsevier, vol. 110(1), pages 76-98, October.
- Ali Dogramaci & Julius Surkis, 1979. "Evaluation of a Heuristic for Scheduling Independent Jobs on Parallel Identical Processors," Management Science, INFORMS, vol. 25(12), pages 1208-1216, December.
- Adamopoulos, George I. & Pappis, Costas P., 1998. "Scheduling under a common due-data on parallel unrelated machines," European Journal of Operational Research, Elsevier, vol. 105(3), pages 494-501, March.
- Sungmin Kang & Kavindra Malik & L. Joseph Thomas, 1999. "Lotsizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs," Management Science, INFORMS, vol. 45(2), pages 273-289, February.
- Gupta, Jatinder N. D. & Darrow, William P., 1986. "The two-machine sequence dependent flowshop scheduling problem," European Journal of Operational Research, Elsevier, vol. 24(3), pages 439-446, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- F. Rodriguez & C. Blum & C. García-Martínez & M. Lozano, 2012. "GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times," Annals of Operations Research, Springer, vol. 201(1), pages 383-401, December.
- Rauchecker, Gerhard & Schryen, Guido, 2019. "An exact branch-and-price algorithm for scheduling rescue units during disaster response," European Journal of Operational Research, Elsevier, vol. 272(1), pages 352-363.
- Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
- Chen, Jianfu & Chu, Chengbin & Sahli, Abderrahim & Li, Kai, 2024. "A branch-and-price algorithm for unrelated parallel machine scheduling with machine usage costs," European Journal of Operational Research, Elsevier, vol. 316(3), pages 856-872.
- Lin, B. M. T. & Jeng, A. A. K., 2004. "Parallel-machine batch scheduling to minimize the maximum lateness and the number of tardy jobs," International Journal of Production Economics, Elsevier, vol. 91(2), pages 121-134, September.
- Xi, Yue & Jang, Jaejin, 2012. "Scheduling jobs on identical parallel machines with unequal future ready time and sequence dependent setup: An experimental study," International Journal of Production Economics, Elsevier, vol. 137(1), pages 1-10.
- Daniel D. Zeng & J. Leon Zhao, 2005. "Effective Role Resolution in Workflow Management," INFORMS Journal on Computing, INFORMS, vol. 17(3), pages 374-387, August.
- Wex, Felix & Schryen, Guido & Feuerriegel, Stefan & Neumann, Dirk, 2014. "Emergency response in natural disaster management: Allocation and scheduling of rescue units," European Journal of Operational Research, Elsevier, vol. 235(3), pages 697-708.
- Zhi‐Long Chen & Warren B. Powell, 2003. "Exact algorithms for scheduling multiple families of jobs on parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(7), pages 823-840, October.
- Chang, Zhiqi & Ding, Jian-Ya & Song, Shiji, 2019. "Distributionally robust scheduling on parallel machines under moment uncertainty," European Journal of Operational Research, Elsevier, vol. 272(3), pages 832-846.
- Ibarra-Rojas, Omar J. & Ríos-Mercado, Roger Z. & Rios-Solis, Yasmin A. & Saucedo-Espinosa, Mario A., 2011. "A decomposition approach for the piece-mold-machine manufacturing problem," International Journal of Production Economics, Elsevier, vol. 134(1), pages 255-261, November.
- Hongmin Li & Woonghee T. Huh & Matheus C. Sampaio & Naiping Keng, 2021. "Planning Production and Equipment Qualification under High Process Flexibility," Production and Operations Management, Production and Operations Management Society, vol. 30(10), pages 3369-3390, October.
- Arthur Kramer & Anand Subramanian, 2019. "A unified heuristic and an annotated bibliography for a large class of earliness–tardiness scheduling problems," Journal of Scheduling, Springer, vol. 22(1), pages 21-57, February.
- Epstein, Leah & Levin, Asaf, 2011. "Scheduling with processing set restrictions: PTAS results for several variants," International Journal of Production Economics, Elsevier, vol. 133(2), pages 586-595, October.
- Yang-Kuei Lin & Yin-Yi Chou, 2020. "A hybrid genetic algorithm for operating room scheduling," Health Care Management Science, Springer, vol. 23(2), pages 249-263, June.
- Vallada, Eva & Ruiz, Rubén, 2011. "A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times," European Journal of Operational Research, Elsevier, vol. 211(3), pages 612-622, June.
- Anzanello, Michel J. & Fogliatto, Flavio S. & Santos, Luana, 2014. "Learning dependent job scheduling in mass customized scenarios considering ergonomic factors," International Journal of Production Economics, Elsevier, vol. 154(C), pages 136-145.
- Armentano, Vinicius Amaral & de Franca Filho, Moacir Felizardo, 2007. "Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach," European Journal of Operational Research, Elsevier, vol. 183(1), pages 100-114, November.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Roger Z. Ríos-Mercado & Jonathan F. Bard, 2003. "The Flow Shop Scheduling Polyhedron with Setup Times," Journal of Combinatorial Optimization, Springer, vol. 7(3), pages 291-318, September.
- Ruiz, Ruben & Stutzle, Thomas, 2008. "An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1143-1159, June.
- Bagchi, Tapan P. & Gupta, Jatinder N.D. & Sriskandarajah, Chelliah, 2006. "A review of TSP based approaches for flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 169(3), pages 816-854, March.
- Zhi‐Long Chen & Warren B. Powell, 2003. "Exact algorithms for scheduling multiple families of jobs on parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(7), pages 823-840, October.
- Ruiz, Ruben & Maroto, Concepcion & Alcaraz, Javier, 2005. "Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics," European Journal of Operational Research, Elsevier, vol. 165(1), pages 34-54, August.
- Jaber, Mohamad Y. & Bonney, Maurice, 2001. "Economic lot sizing with learning and continuous time discounting: Is it significant?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 135-143, May.
- Lin, Hung-Tso & Liao, Ching-Jong, 2003. "A case study in a two-stage hybrid flow shop with setup time and dedicated machines," International Journal of Production Economics, Elsevier, vol. 86(2), pages 133-143, November.
- Shen, Liji & Buscher, Udo, 2012. "Solving the serial batching problem in job shop manufacturing systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 14-26.
- Shahvari, Omid & Logendran, Rasaratnam, 2016. "Hybrid flow shop batching and scheduling with a bi-criteria objective," International Journal of Production Economics, Elsevier, vol. 179(C), pages 239-258.
- Rho, Boo-Ho & Park, Kwangtae & Yu, Yung-Mok, 2001. "An international comparison of the effect of manufacturing strategy-implementation gap on business performance," International Journal of Production Economics, Elsevier, vol. 70(1), pages 89-97, March.
- Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
- Selvarajah, Esaignani & Steiner, George, 2006. "Batch scheduling in a two-level supply chain--a focus on the supplier," European Journal of Operational Research, Elsevier, vol. 173(1), pages 226-240, August.
- Hop, Nguyen Van & Tabucanon, Mario T., 2005. "Adaptive genetic algorithm for lot-sizing problem with self-adjustment operation rate," International Journal of Production Economics, Elsevier, vol. 98(2), pages 129-135, November.
- Liao, C. J. & Yu, W. C., 1996. "Sequencing heuristics for dependent setups in a continuous process industry," Omega, Elsevier, vol. 24(6), pages 649-659, December.
- Grundel, Soesja & Çiftçi, Barış & Borm, Peter & Hamers, Herbert, 2013.
"Family sequencing and cooperation,"
European Journal of Operational Research, Elsevier, vol. 226(3), pages 414-424.
- Grundel, S. & Ciftci, B.B. & Borm, P.E.M. & Hamers, H.J.M., 2012. "Family Sequencing and Cooperation," Other publications TiSEM 830f760f-f003-40df-a01c-6, Tilburg University, School of Economics and Management.
- Grundel, S. & Ciftci, B.B. & Borm, P.E.M. & Hamers, H.J.M., 2012. "Family Sequencing and Cooperation," Discussion Paper 2012-040, Tilburg University, Center for Economic Research.
- Christos Koulamas, 1997. "Decomposition and hybrid simulated annealing heuristics for the parallel‐machine total tardiness problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(1), pages 109-125, February.
- Ronconi, Débora P. & Henriques, Luís R.S., 2009. "Some heuristic algorithms for total tardiness minimization in a flowshop with blocking," Omega, Elsevier, vol. 37(2), pages 272-281, April.
- Mohammad Reza Hosseinzadeh & Mehdi Heydari & Mohammad Mahdavi Mazdeh, 2022. "Mathematical modeling and two metaheuristic algorithms for integrated process planning and group scheduling with sequence-dependent setup time," Operational Research, Springer, vol. 22(5), pages 5055-5105, November.
- Schaller, Jeffrey, 2007. "Scheduling on a single machine with family setups to minimize total tardiness," International Journal of Production Economics, Elsevier, vol. 105(2), pages 329-344, February.
- Guinet, Alain & Legrand, Marie, 1998. "Reduction of job-shop problems to flow-shop problems with precedence constraints," European Journal of Operational Research, Elsevier, vol. 109(1), pages 96-110, August.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:70:y:2001:i:3:p:215-226. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.