IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v91y2004i2p121-134.html
   My bibliography  Save this article

Parallel-machine batch scheduling to minimize the maximum lateness and the number of tardy jobs

Author

Listed:
  • Lin, B. M. T.
  • Jeng, A. A. K.

Abstract

No abstract is available for this item.

Suggested Citation

  • Lin, B. M. T. & Jeng, A. A. K., 2004. "Parallel-machine batch scheduling to minimize the maximum lateness and the number of tardy jobs," International Journal of Production Economics, Elsevier, vol. 91(2), pages 121-134, September.
  • Handle: RePEc:eee:proeco:v:91:y:2004:i:2:p:121-134
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(03)00261-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Wang, Guoqing & Cheng, T. C. Edwin, 2000. "Parallel machine scheduling with batch delivery costs," International Journal of Production Economics, Elsevier, vol. 68(2), pages 177-183, November.
    2. Potts, Chris N. & Kovalyov, Mikhail Y., 2000. "Scheduling with batching: A review," European Journal of Operational Research, Elsevier, vol. 120(2), pages 228-249, January.
    3. Weng, Michael X. & Lu, John & Ren, Haiying, 2001. "Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective," International Journal of Production Economics, Elsevier, vol. 70(3), pages 215-226, April.
    4. Gregory Dobson & Uday S. Karmarkar & Jeffrey L. Rummel, 1987. "Batching to Minimize Flow Times on One Machine," Management Science, INFORMS, vol. 33(6), pages 784-799, June.
    5. Ho, Johnny C. & Chang, Yih-Long, 1995. "Minimizing the number of tardy jobs for m parallel machines," European Journal of Operational Research, Elsevier, vol. 84(2), pages 343-355, July.
    6. Scott Webster & Kenneth R. Baker, 1995. "Scheduling Groups of Jobs on a Single Machine," Operations Research, INFORMS, vol. 43(4), pages 692-703, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yalaoui, F. & Chu, C., 2006. "New exact method to solve the Pm/rj/[summation operator]Cj schedule problem," International Journal of Production Economics, Elsevier, vol. 100(1), pages 168-179, March.
    2. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
    3. Jae-Min Yu & Rong Huang & Dong-Ho Lee, 2017. "Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops," International Journal of Production Research, Taylor & Francis Journals, vol. 55(11), pages 3266-3282, June.
    4. Ruiz-Torres, Alex J. & Lopez, Francisco J. & Ho, Johnny C., 2007. "Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs," European Journal of Operational Research, Elsevier, vol. 179(2), pages 302-315, June.
    5. Mor, Baruch & Mosheiov, Gur, 2014. "Batch scheduling with a rate-modifying maintenance activity to minimize total flowtime," International Journal of Production Economics, Elsevier, vol. 153(C), pages 238-242.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Selvarajah, Esaignani & Steiner, George, 2006. "Batch scheduling in a two-level supply chain--a focus on the supplier," European Journal of Operational Research, Elsevier, vol. 173(1), pages 226-240, August.
    2. Grundel, Soesja & Çiftçi, Barış & Borm, Peter & Hamers, Herbert, 2013. "Family sequencing and cooperation," European Journal of Operational Research, Elsevier, vol. 226(3), pages 414-424.
    3. Jae-Min Yu & Rong Huang & Dong-Ho Lee, 2017. "Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops," International Journal of Production Research, Taylor & Francis Journals, vol. 55(11), pages 3266-3282, June.
    4. Xiangtong Qi, 2005. "A logistics scheduling model: Inventory cost reduction by batching," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(4), pages 312-320, June.
    5. Esaignani Selvarajah & George Steiner, 2009. "Approximation Algorithms for the Supplier's Supply Chain Scheduling Problem to Minimize Delivery and Inventory Holding Costs," Operations Research, INFORMS, vol. 57(2), pages 426-438, April.
    6. Zhi‐Long Chen & Warren B. Powell, 2003. "Exact algorithms for scheduling multiple families of jobs on parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(7), pages 823-840, October.
    7. Shen, Liji & Buscher, Udo, 2012. "Solving the serial batching problem in job shop manufacturing systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 14-26.
    8. Cheng, T. C. Edwin & Janiak, Adam & Kovalyov, Mikhail Y., 2001. "Single machine batch scheduling with resource dependent setup and processing times," European Journal of Operational Research, Elsevier, vol. 135(1), pages 177-183, November.
    9. Fowler, John W. & Mönch, Lars, 2022. "A survey of scheduling with parallel batch (p-batch) processing," European Journal of Operational Research, Elsevier, vol. 298(1), pages 1-24.
    10. Chang, Yung-Chia & Lee, Chung-Yee, 2004. "Machine scheduling with job delivery coordination," European Journal of Operational Research, Elsevier, vol. 158(2), pages 470-487, October.
    11. Artur Alves Pessoa & Teobaldo Bulhões & Vitor Nesello & Anand Subramanian, 2022. "Exact Approaches for Single Machine Total Weighted Tardiness Batch Scheduling," INFORMS Journal on Computing, INFORMS, vol. 34(3), pages 1512-1530, May.
    12. Schaller, Jeffrey, 2007. "Scheduling on a single machine with family setups to minimize total tardiness," International Journal of Production Economics, Elsevier, vol. 105(2), pages 329-344, February.
    13. Chuleeporn Kusoncum & Kanchana Sethanan & Richard F. Hartl & Thitipong Jamrus, 2022. "Modified differential evolution and heuristic algorithms for dump tippler machine allocation in a typical sugar mill in Thailand," Operational Research, Springer, vol. 22(5), pages 5863-5895, November.
    14. Danny Hermelin & Matthias Mnich & Simon Omlor, 2024. "Serial batching to minimize the weighted number of tardy jobs," Journal of Scheduling, Springer, vol. 27(6), pages 545-556, December.
    15. Pereira Lopes, Manuel J. & de Carvalho, J.M. Valerio, 2007. "A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1508-1527, February.
    16. repec:dgr:rugsom:02a68 is not listed on IDEAS
    17. Kovalyov, M. Y. & Potts, C. N. & Strusevich, V. A., 2004. "Batching decisions for assembly production systems," European Journal of Operational Research, Elsevier, vol. 157(3), pages 620-642, September.
    18. Zee, Durk Jouke van der, 2002. "Look-ahead strategies for controlling batch operations in industry : basic insights in rule construction," Research Report 02A68, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    19. Liji Shen & Jatinder N. D. Gupta, 2018. "Family scheduling with batch availability in flow shops to minimize makespan," Journal of Scheduling, Springer, vol. 21(2), pages 235-249, April.
    20. Jinwen Ou, 2020. "Near-linear-time approximation algorithms for scheduling a batch-processing machine with setups and job rejection," Journal of Scheduling, Springer, vol. 23(5), pages 525-538, October.
    21. Liaee, Mohammad Mehdi & Emmons, Hamilton, 1997. "Scheduling families of jobs with setup times," International Journal of Production Economics, Elsevier, vol. 51(3), pages 165-176, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:91:y:2004:i:2:p:121-134. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.