IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v112y1999i2p284-303.html
   My bibliography  Save this article

Operations planning for a multi-stage kanban system

Author

Listed:
  • Sarker, Bhaba R.
  • Balan, Chidambaram V.

Abstract

No abstract is available for this item.

Suggested Citation

  • Sarker, Bhaba R. & Balan, Chidambaram V., 1999. "Operations planning for a multi-stage kanban system," European Journal of Operational Research, Elsevier, vol. 112(2), pages 284-303, January.
  • Handle: RePEc:eee:ejores:v:112:y:1999:i:2:p:284-303
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(97)00432-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Jamal, A. M. M. & Sarker, Bhaba R., 1993. "An optimal batch size for a production system operating under a just-in-time delivery system," International Journal of Production Economics, Elsevier, vol. 32(2), pages 255-260, September.
    2. Ralph D. Badinelli, 1992. "A Model for Continuous-Review Pull Policies in Serial Inventory Systems," Operations Research, INFORMS, vol. 40(1), pages 142-156, February.
    3. Yanagawa, Yoshinari & Miyazaki, Shigeji & Ohta, Hiroshi, 1994. "An optimal operation planning for the fixed quantity withdrawal Kanban system with variable leadtimes," International Journal of Production Economics, Elsevier, vol. 33(1-3), pages 163-168, January.
    4. Mark L. Spearman, 1992. "Customer Service in Pull Production Systems," Operations Research, INFORMS, vol. 40(5), pages 948-958, October.
    5. Sarker, Bhaba R. & Parija, Gyana R., 1996. "Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system," European Journal of Operational Research, Elsevier, vol. 89(3), pages 593-608, March.
    6. Yilmaz, Cengiz, 1992. "Incremental order quantity for the case of very lumpy demand," International Journal of Production Economics, Elsevier, vol. 26(1-3), pages 367-371, February.
    7. Wang, Hunglin & Hsu-Pin (Ben) Wang, 1991. "Optimum number of kanbans between two adjacent workstations in a JIT system," International Journal of Production Economics, Elsevier, vol. 22(3), pages 179-188, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wang, Shaojun & Sarker, Bhaba R., 2006. "Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy," European Journal of Operational Research, Elsevier, vol. 172(1), pages 179-200, July.
    2. Petering, Matthew E.H. & Chen, Xi & Hsieh, Wen-Huan, 2019. "Inventory control with flexible demand: Cyclic case with multiple batch supply and demand processes," International Journal of Production Economics, Elsevier, vol. 212(C), pages 60-77.
    3. Wu, Kan & Yuan, Xue-Ming, 2016. "Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demandAuthor-Name: Zhao, Shi Tao," European Journal of Operational Research, Elsevier, vol. 255(2), pages 364-379.
    4. Maurizio Faccio & Mauro Gamberi & Alessandro Persona & Alberto Regattieri & Fabio Sgarbossa, 2013. "Design and simulation of assembly line feeding systems in the automotive sector using supermarket, kanbans and tow trains: a general framework," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 24(2), pages 187-208, July.
    5. Asefeh Hasani Goodarzi & Seyed Hessameddin Zegordi, 2020. "Vehicle routing problem in a kanban controlled supply chain system considering cross-docking strategy," Operational Research, Springer, vol. 20(4), pages 2397-2425, December.
    6. S Wang & B R Sarker, 2004. "A single-stage supply chain system controlled by kanban under just-in-time philosophy," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(5), pages 485-494, May.
    7. Xiaobo, Zhao & Xu, Deju & Zhang, Hanqin & He, Qi-Ming, 2007. "Modeling and analysis of a supply-assembly-store chain," European Journal of Operational Research, Elsevier, vol. 176(1), pages 275-294, January.
    8. Wang, Shaojun & Sarker, Bhaba R., 2005. "An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy," European Journal of Operational Research, Elsevier, vol. 162(1), pages 153-172, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
    2. Lee, Wenyih, 2005. "A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering," Omega, Elsevier, vol. 33(2), pages 163-174, April.
    3. Diponegoro, Ahmad & Sarker, Bhaba R., 2002. "Determining manufacturing batch sizes for a lumpy delivery system with trend demand," International Journal of Production Economics, Elsevier, vol. 77(2), pages 131-143, May.
    4. Sarker, Bhaba R. & Parija, Gyana R., 1996. "Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system," European Journal of Operational Research, Elsevier, vol. 89(3), pages 593-608, March.
    5. Z X Chen & B R Sarker, 2010. "Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(11), pages 1654-1666, November.
    6. Fazel, Farzaneh & Fischer, Klaus P. & Gilbert, Erika W., 1998. "JIT purchasing vs. EOQ with a price discount: An analytical comparison of inventory costs," International Journal of Production Economics, Elsevier, vol. 54(1), pages 101-109, January.
    7. Fangruo Chen & Yu-Sheng Zheng, 1998. "Near-Optimal Echelon-Stock (R, nQ) Policies in Multistage Serial Systems," Operations Research, INFORMS, vol. 46(4), pages 592-602, August.
    8. Arabatzis, Garyfallos & Petridis, Konstantinos & Galatsidas, Spyros & Ioannou, Konstantinos, 2013. "A demand scenario based fuelwood supply chain: A conceptual model," Renewable and Sustainable Energy Reviews, Elsevier, vol. 25(C), pages 687-697.
    9. Seki, Yoichi & Hoshino, Naoto, 1999. "Transient behavior of a single-stage kanban system based on the queueing model," International Journal of Production Economics, Elsevier, vol. 60(1), pages 369-374, April.
    10. Rahman, Mohammad Anwar Ashek & Sarker, Bhaba R., 2007. "Supply chain models for an assembly system with preprocessing of raw materials," European Journal of Operational Research, Elsevier, vol. 181(2), pages 733-752, September.
    11. Badinelli, Ralph D., 1996. "Approximating probability density functions and their convolutions using orthogonal polynomials," European Journal of Operational Research, Elsevier, vol. 95(1), pages 211-230, November.
    12. Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
    13. De Smet, Rudi & Gelders, Ludo, 1998. "Using simulation to evaluate the introduction of a Kanban subsystem within an MRP-controlled manufacturing environment," International Journal of Production Economics, Elsevier, vol. 56(1), pages 111-122, September.
    14. Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
    15. Sarker, Bhaba R., 2014. "Consignment stocking policy models for supply chain systems: A critical review and comparative perspectives," International Journal of Production Economics, Elsevier, vol. 155(C), pages 52-67.
    16. Wallace J. Hopp & Mark L. Spearman, 2004. "To Pull or Not to Pull: What Is the Question?," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 133-148, August.
    17. Yuan-Shyi Peter Chiu & Chih-An Katherine Lin & Huei-Hsin Chang & Victoria Chiu, 2010. "Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance," Mathematical and Computer Modelling of Dynamical Systems, Taylor & Francis Journals, vol. 16(4), pages 373-388, July.
    18. Lee, Shine-Der & Fu, Yen-Chen, 2014. "Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 66(C), pages 23-35.
    19. Petering, Matthew E.H. & Chen, Xi & Hsieh, Wen-Huan, 2019. "Inventory control with flexible demand: Cyclic case with multiple batch supply and demand processes," International Journal of Production Economics, Elsevier, vol. 212(C), pages 60-77.
    20. Takahashi, Katsuhiko & Nakamura, Nobuto, 2002. "Decentralized reactive Kanban system," European Journal of Operational Research, Elsevier, vol. 139(2), pages 262-276, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:112:y:1999:i:2:p:284-303. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.