Inventory and investment in setup and quality operations under Return On Investment maximization
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
- John P. Leschke & Elliott N. Weiss, 1997. "The Multi-Item Setup-Reduction Investment-Allocation Problem with Continuous Investment-Cost Functions," Management Science, INFORMS, vol. 43(6), pages 890-894, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Mehran Ullah & Biswajit Sarkar & Iqra Asghar, 2019. "Effects of Preservation Technology Investment on Waste Generation in a Two-Echelon Supply Chain Model," Mathematics, MDPI, vol. 7(2), pages 1-20, February.
- Hsu, P.H. & Wee, H.M. & Teng, H.M., 2010. "Preservation technology investment for deteriorating inventory," International Journal of Production Economics, Elsevier, vol. 124(2), pages 388-394, April.
- Valentín Pando & Luis A. San-José & Joaquín Sicilia, 2021. "An Inventory Model with Stock-Dependent Demand Rate and Maximization of the Return on Investment," Mathematics, MDPI, vol. 9(8), pages 1-18, April.
- Valentín Pando & Luis A. San-José & Joaquín Sicilia & David Alcaide-López-de-Pablo, 2021. "Profitability Index Maximization in an Inventory Model with a Price- and Stock-Dependent Demand Rate in a Power-Form," Mathematics, MDPI, vol. 9(10), pages 1-29, May.
- Trivedi, Anupam & Chong Aih, Hau & Srinivasan, Dipti, 2020. "A stochastic cost–benefit analysis framework for allocating energy storage system in distribution network for load leveling," Applied Energy, Elsevier, vol. 280(C).
- Marchioni, Andrea & Magni, Carlo Alberto, 2018.
"Investment decisions and sensitivity analysis: NPV-consistency of rates of return,"
European Journal of Operational Research, Elsevier, vol. 268(1), pages 361-372.
- Marchioni, Andrea & Magni, Carlo Alberto, 2018. "Investment decisions and sensitivity analysis: NPV-consistency of rates of return," MPRA Paper 95266, University Library of Munich, Germany.
- Diaby, Moustapha & Cruz, Jose M. & Nsakanda, Aaron L., 2013. "Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction," European Journal of Operational Research, Elsevier, vol. 228(3), pages 526-535.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Gong, Qiguo & Chen, Guohui & Zhang, Wen & Wang, Hui, 2022. "The role of humans in flexible smart factories," International Journal of Production Economics, Elsevier, vol. 254(C).
- Giri, B. C. & Moon, I., 2004. "Note on an economic lot scheduling problem under budgetary and capacity constraints," International Journal of Production Economics, Elsevier, vol. 91(3), pages 229-234, October.
- Diaby, Moustapha, 2000. "Integrated batch size and setup reduction decisions in multi-product, dynamic manufacturing environments," International Journal of Production Economics, Elsevier, vol. 67(3), pages 219-233, October.
- Darwish, M.A., 2008. "EPQ models with varying setup cost," International Journal of Production Economics, Elsevier, vol. 113(1), pages 297-306, May.
- Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 202(2), pages 473-478, April.
- Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
- Ayd{i}n Alptekinou{g}lu & Charles J. Corbett, 2008. "Mass Customization vs. Mass Production: Variety and Price Competition," Manufacturing & Service Operations Management, INFORMS, vol. 10(2), pages 204-217, August.
- Suárez, Freddy F. & Cusumano, Michael A., 1954- & Fine, Charles H., 1991. "Flexibility and performance : a literature critique and strategic framework," Working papers 3298-91., Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
- Jaber, Mohamad Y. & Bonney, Maurice, 2003. "Lot sizing with learning and forgetting in set-ups and in product quality," International Journal of Production Economics, Elsevier, vol. 83(1), pages 95-111, January.
- S. Hemapriya & R. Uthayakumar, 2017. "An inventory model with uncertain demand and lost sales reduction under service level constraint," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1399-1418, November.
- Transchel, Sandra & Minner, Stefan, 2009. "The impact of dynamic pricing on the economic order decision," European Journal of Operational Research, Elsevier, vol. 198(3), pages 773-789, November.
- Mitali Sarkar & Li Pan & Bikash Koli Dey & Biswajit Sarkar, 2020. "Does the Autonomation Policy Really Help in a Smart Production System for Controlling Defective Production?," Mathematics, MDPI, vol. 8(7), pages 1-21, July.
- Kirk R. Karwan & Joseph B. Mazzola & Richard C. Morey, 1988. "Production lot sizing under setup and worker learning," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(2), pages 159-175, April.
- Fehmi Tanrısever & S. Sinan Erzurumlu & Nitin Joglekar, 2012. "Production, Process Investment, and the Survival of Debt‐Financed Startup Firms," Production and Operations Management, Production and Operations Management Society, vol. 21(4), pages 637-652, July.
- Bernstein, Fernando & Gürhan Kök, A. & Meca, Ana, 2015. "Cooperation in assembly systems: The role of knowledge sharing networks," European Journal of Operational Research, Elsevier, vol. 240(1), pages 160-171.
- Ananth V. Iyer & Leroy B. Schwarz & Stefanos A. Zenios, 2005. "A Principal-Agent Model for Product Specification and Production," Management Science, INFORMS, vol. 51(1), pages 106-119, January.
- Bintong Chen & Charles L. Munson, 2004. "Resource allocation with lumpy demand: To speed or not to speed?," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(3), pages 363-385, April.
- Freimer, Michael & Thomas, Douglas & Tyworth, John, 2006. "The value of setup cost reduction and process improvement for the economic production quantity model with defects," European Journal of Operational Research, Elsevier, vol. 173(1), pages 241-251, August.
- Guillermo Gallego & Ilkyeong Moon, 1995. "Strategic investment to reduce setup times in the economic lot scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(5), pages 773-790, August.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:185:y:2008:i:2:p:593-605. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.