IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v63y2000i2p195-205.html
   My bibliography  Save this article

Computer simulation of a PCB production line: metamodeling approach

Author

Listed:
  • Dengiz, Berna
  • Akbay, Kunter S.

Abstract

No abstract is available for this item.

Suggested Citation

  • Dengiz, Berna & Akbay, Kunter S., 2000. "Computer simulation of a PCB production line: metamodeling approach," International Journal of Production Economics, Elsevier, vol. 63(2), pages 195-205, January.
  • Handle: RePEc:eee:proeco:v:63:y:2000:i:2:p:195-205
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(99)00013-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kleijnen, Jack P. C. & Standridge, Charles R., 1988. "Experimental design and regression analysis in simulation: An FMS case study," European Journal of Operational Research, Elsevier, vol. 33(3), pages 257-261, February.
    2. Kim, Yeong-Dae & Lim, Hyeong-Gyu & Park, Moon-Won, 1996. "Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process," European Journal of Operational Research, Elsevier, vol. 91(1), pages 124-143, May.
    3. Meral, Sedef & Erkip, Nesim, 1991. "Simulation analysis of a JIT production line," International Journal of Production Economics, Elsevier, vol. 24(1-2), pages 147-156, November.
    4. Lin, Li & Chiu, Francis, 1993. "Manufacturing cell operating characteristics," European Journal of Operational Research, Elsevier, vol. 69(3), pages 424-437, September.
    5. Rotmans, J. & Vrieze, O. J., 1990. "Metamodelling and experimental design: Case study of the greenhouse effect," European Journal of Operational Research, Elsevier, vol. 47(3), pages 317-329, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Charles, Vincent & Kumar, Mukesh & Irene Kavitha, S., 2012. "Measuring the efficiency of assembled printed circuit boards with undesirable outputs using data envelopment analysis," International Journal of Production Economics, Elsevier, vol. 136(1), pages 194-206.
    2. Durieux, Severine & Pierreval, Henri, 2004. "Regression metamodeling for the design of automated manufacturing system composed of parallel machines sharing a material handling resource," International Journal of Production Economics, Elsevier, vol. 89(1), pages 21-30, May.
    3. Noguera, Jose H. & Watson, Edward F., 2006. "Response surface analysis of a multi-product batch processing facility using a simulation metamodel," International Journal of Production Economics, Elsevier, vol. 102(2), pages 333-343, August.
    4. Satyajith Amaran & Nikolaos V. Sahinidis & Bikram Sharda & Scott J. Bury, 2016. "Simulation optimization: a review of algorithms and applications," Annals of Operations Research, Springer, vol. 240(1), pages 351-380, May.
    5. Dengiz, Berna & İç, Yusuf Tansel & Belgin, Onder, 2016. "A meta-model based simulation optimization using hybrid simulation-analytical modeling to increase the productivity in automotive industry," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 120(C), pages 120-128.
    6. G-C Lee & Y-D Kim & J-G Kim & S-H Choi, 2003. "A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(10), pages 1038-1049, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sarper, H. & Henry, M. C., 1996. "Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop," Omega, Elsevier, vol. 24(1), pages 73-81, February.
    2. Ji, P. & Sze, M. T. & Lee, W. B., 2001. "A genetic algorithm of determining cycle time for printed circuit board assembly lines," European Journal of Operational Research, Elsevier, vol. 128(1), pages 175-184, January.
    3. Kleijnen, Jack P.C., 1992. "Sensitivity analysis of simulation experiments: regression analysis and statistical design," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 34(3), pages 297-315.
    4. B-J Joo & Y-D Kim, 2009. "A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(4), pages 572-582, April.
    5. Kleijnen, J.P.C., 1995. "Sensitivity analysis and optimization of system dynamics models : Regression analysis and statistical design of experiments," Other publications TiSEM 87ee6ee0-592c-4204-ac50-6, Tilburg University, School of Economics and Management.
    6. Yazdani Sabouni, M.T. & Logendran, Rasaratnam, 2013. "Carryover sequence-dependent group scheduling with the integration of internal and external setup times," European Journal of Operational Research, Elsevier, vol. 224(1), pages 8-22.
    7. van Groenendaal, Willem J. H., 1998. "Estimating NPV variability for deterministic models," European Journal of Operational Research, Elsevier, vol. 107(1), pages 202-213, May.
    8. Durieux, Severine & Pierreval, Henri, 2004. "Regression metamodeling for the design of automated manufacturing system composed of parallel machines sharing a material handling resource," International Journal of Production Economics, Elsevier, vol. 89(1), pages 21-30, May.
    9. Kleijnen, Jack P. C. & Sargent, Robert G., 2000. "A methodology for fitting and validating metamodels in simulation," European Journal of Operational Research, Elsevier, vol. 120(1), pages 14-29, January.
    10. Jin, Ding & Hedtrich, Johannes & Henning, Christian, 2018. "Applying Meta modeling for extended CGE-modeling: Sample techniques and potential application," Conference papers 332947, Purdue University, Center for Global Trade Analysis, Global Trade Analysis Project.
    11. G-C Lee & Y-D Kim & J-G Kim & S-H Choi, 2003. "A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(10), pages 1038-1049, October.
    12. Vinod, V. & Sridharan, R., 2011. "Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system," International Journal of Production Economics, Elsevier, vol. 129(1), pages 127-146, January.
    13. Baykoc, Omer Faruk & Erol, Serpil, 1998. "Simulation modelling and analysis of a JIT production system," International Journal of Production Economics, Elsevier, vol. 55(2), pages 203-212, July.
    14. Kleijnen, J.P.C., 2006. "Regression Models and Experimental Designs : A Tutorial for Simulation Analaysts," Discussion Paper 2006-10, Tilburg University, Center for Economic Research.
    15. Gaury, E.G.A. & Kleijnen, J.P.C. & Pierreval, H., 1998. "Customized Pull Systems for Single-Product Flow Lines," Discussion Paper 1998-117, Tilburg University, Center for Economic Research.
    16. Madiha Harrabi & Olfa Belkahla Driss & Khaled Ghedira, 2021. "A hybrid evolutionary approach to job-shop scheduling with generic time lags," Journal of Scheduling, Springer, vol. 24(3), pages 329-346, June.
    17. Dengiz, Berna & İç, Yusuf Tansel & Belgin, Onder, 2016. "A meta-model based simulation optimization using hybrid simulation-analytical modeling to increase the productivity in automotive industry," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 120(C), pages 120-128.
    18. Ruben, Ruerd & van Ruijven, Arjan, 2001. "Technical coefficients for bio-economic farm household models: a meta-modelling approach with applications for Southern Mali," Ecological Economics, Elsevier, vol. 36(3), pages 427-441, March.
    19. Baustert, Paul & Othoniel, Benoit & Rugani, Benedetto & Leopold, Ulrich, 2018. "Uncertainty analysis in integrated environmental models for ecosystem service assessments: Frameworks, challenges and gaps," Ecosystem Services, Elsevier, vol. 33(PB), pages 110-123.
    20. Vallada, Eva & Ruiz, Rubén, 2010. "Genetic algorithms with path relinking for the minimum tardiness permutation flowshop problem," Omega, Elsevier, vol. 38(1-2), pages 57-67, February.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:63:y:2000:i:2:p:195-205. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.