IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v38y1995i2-3p173-188.html
   My bibliography  Save this article

Layout design in group technology manufacturing

Author

Listed:
  • Hassan, Mohsen M. D.

Abstract

No abstract is available for this item.

Suggested Citation

  • Hassan, Mohsen M. D., 1995. "Layout design in group technology manufacturing," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 173-188, March.
  • Handle: RePEc:eee:proeco:v:38:y:1995:i:2-3:p:173-188
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(94)00090-W
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kouvelis, P & Chiang, W-C & Kiran, AS, 1992. "A survey of layout issues in flexible manufacturing systems," Omega, Elsevier, vol. 20(3), pages 375-390, May.
    2. Shtub, Avraham, 1988. "Capacity allocation and material flow in planning group technology cells," Engineering Costs and Production Economics, Elsevier, vol. 13(3), pages 217-228, March.
    3. Shtub, Avraham, 1989. "Estimating the effect of conversion to a group technology layout on the cost of material handling," Engineering Costs and Production Economics, Elsevier, vol. 16(2), pages 103-109, April.
    4. Selvam, R. Panneer & Balasubramanian, K. N., 1985. "Algorithmic grouping of operation sequences," Engineering Costs and Production Economics, Elsevier, vol. 9(1-3), pages 125-134, April.
    5. John S. Morris & Richard J. Tersine, 1990. "A Simulation Analysis of Factors Influencing the Attractiveness of Group Technology Cellular Layouts," Management Science, INFORMS, vol. 36(12), pages 1567-1578, December.
    6. Hassan, Mohsen MD & Hogg, Gary L, 1987. "A review of graph theory application to the facilities layout problem," Omega, Elsevier, vol. 15(4), pages 291-300.
    7. Cheng, Chunhung, 1993. "A tree search algorithm for designing a cellular manufacturing system," Omega, Elsevier, vol. 21(4), pages 489-496, July.
    8. Cheng, Ch, 1992. "Algorithms for grouping machine groups in group technology," Omega, Elsevier, vol. 20(4), pages 493-501, July.
    9. Chu, C-H, 1989. "Cluster analysis in manufacturing cellular formation," Omega, Elsevier, vol. 17(3), pages 289-295.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Nearchou, Andreas C., 2006. "Meta-heuristics from nature for the loop layout design problem," International Journal of Production Economics, Elsevier, vol. 101(2), pages 312-328, June.
    2. Ioannou, George, 2006. "Time-phased creation of hybrid manufacturing systems," International Journal of Production Economics, Elsevier, vol. 102(2), pages 183-198, August.
    3. Lee, Shine-Der & Chiang, Chih-Ping, 2002. "Cell formations in the uni-directional loop material handling environment," European Journal of Operational Research, Elsevier, vol. 137(2), pages 401-420, March.
    4. Hassan, Mohsen M. D., 2000. "Toward re-engineering models and algorithms of facility layout," Omega, Elsevier, vol. 28(6), pages 711-723, December.
    5. Bazargan-Lari, Massoud, 1999. "Layout designs in cellular manufacturing," European Journal of Operational Research, Elsevier, vol. 112(2), pages 258-272, January.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hassan, Mohsen M. D., 2000. "Toward re-engineering models and algorithms of facility layout," Omega, Elsevier, vol. 28(6), pages 711-723, December.
    2. Shanker, Ravi & Vrat, Prem, 1998. "Post design modeling for cellular manufacturing system with cost uncertainty," International Journal of Production Economics, Elsevier, vol. 55(1), pages 97-109, June.
    3. Lee, Shine-Der & Chiang, Chih-Ping, 2002. "Cell formations in the uni-directional loop material handling environment," European Journal of Operational Research, Elsevier, vol. 137(2), pages 401-420, March.
    4. Yin, Yong & Yasuda, Kazuhiko, 2006. "Similarity coefficient methods applied to the cell formation problem: A taxonomy and review," International Journal of Production Economics, Elsevier, vol. 101(2), pages 329-352, June.
    5. Berardi, Victor L. & Zhang, Guoqiang & Felix Offodile, O., 1999. "A mathematical programming approach to evaluating alternative machine clusters in cellular manufacturing," International Journal of Production Economics, Elsevier, vol. 58(3), pages 253-264, January.
    6. Dahlbeck, Mirko & Fischer, Anja & Fischer, Frank & Hungerländer, Philipp & Maier, Kerstin, 2023. "Exact approaches for the combined cell layout problem," European Journal of Operational Research, Elsevier, vol. 305(2), pages 530-546.
    7. Chen, Ja-Shen & Heragu, Sunderesh S., 1999. "Stepwise decomposition approaches for large scale cell formation problems," European Journal of Operational Research, Elsevier, vol. 113(1), pages 64-79, February.
    8. D'Angelo, Andrea & Gastaldi, Massimo & Levialdi, Nathan, 2000. "Production variability and shop configuration: An experimental analysis," International Journal of Production Economics, Elsevier, vol. 68(1), pages 43-57, October.
    9. Plaquin, Marie-France & Pierreval, Henri, 2000. "Cell formation using evolutionary algorithms with certain constraints," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 267-278, March.
    10. Logendran, Rasaratnam & Talkington, Diane, 1997. "Analysis of cellular and functional manufacturing systems in the presence of machine breakdown," International Journal of Production Economics, Elsevier, vol. 53(3), pages 239-256, December.
    11. Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
    12. Jing, Hao & Sheng, Lijuan & Luo, Chaorui & Kwak, Choonjong, 2021. "Statistical analysis of family based dispatching rules and preemption," International Journal of Production Economics, Elsevier, vol. 240(C).
    13. Benjaafar, Saifallah, 1996. "Modeling and analysis of machine sharing in manufacturing systems," European Journal of Operational Research, Elsevier, vol. 91(1), pages 56-73, May.
    14. R Bhatnagar & V Saddikuti, 2010. "Models for cellular manufacturing systems design: matching processing requirements and operator capabilities," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 827-839, May.
    15. Shambu, Girish & Suresh, Nallan C., 2000. "Performance of hybrid cellular manufacturing systems: A computer simulation investigation," European Journal of Operational Research, Elsevier, vol. 120(2), pages 436-458, January.
    16. Jensen, John B., 2000. "The impact of resource flexibility and staffing decisions on cellular and departmental shop performance," European Journal of Operational Research, Elsevier, vol. 127(2), pages 279-296, December.
    17. Das, K. & Lashkari, R.S. & Sengupta, S., 2007. "Reliability consideration in the design and analysis of cellular manufacturing systems," International Journal of Production Economics, Elsevier, vol. 105(1), pages 243-262, January.
    18. Shruti Shashikumar & Rakesh D. Raut & Vaibhav S. Narwane & Bhaskar B. Gardas & Balkrishna E. Narkhede & Anjali Awasthi, 2019. "A novel approach to determine the cell formation using heuristics approach," OPSEARCH, Springer;Operational Research Society of India, vol. 56(3), pages 628-656, September.
    19. Gungor, Zulal & Arikan, Feyzan, 2000. "Application of fuzzy decision making in part-machine grouping," International Journal of Production Economics, Elsevier, vol. 63(2), pages 181-193, January.
    20. Jingyang Zhou & Peter E.D. Love & Kok Lay Teo & Hanbin Luo, 2017. "An exact penalty function method for optimising QAP formulation in facility layout problem," International Journal of Production Research, Taylor & Francis Journals, vol. 55(10), pages 2913-2929, May.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:38:y:1995:i:2-3:p:173-188. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.