Achieving cost efficiency through increased inventory leanness: Evidences from oriented strand board (OSB) industry

Author

Listed:
  • Tasdemir, Cagatay
  • Hiziroglu, Salim

Abstract

Impact of inventory leanness on financial performance has been well-documented by scientific community for various industries. However, its application in value-added wood products industry is relatively scarce when compared to other industry segments. The objective of the study was to investigate impact of increased inventory leanness on financial performance of a value-added wood products manufacturer. Outcomes of the study was also expected to contribute to the intersection zone of three research streams, namely Lean Inventory Management, Procurement Lot-Sizing and Demand Forecasting. To achieve stated objectives, research question and hypotheses were constructed around an un-capacitated single item raw material lot-sizing problem in the context of an SME. A six-step systematic optimization approach (SOA) was developed and followed to improve cost efficiency throughout the study. Time series and Regression based demand forecasting coupled with Dynamic and Statistical lot-sizing models to derive the optimal solution to the problem. At the end of exhaustive simulations, an optimized procurement strategy that could achieve 32.87%–60.90% raw material inventory management cost savings depending on desired buffer level was proposed. Consequently, increased inventory leanness led to less costly procurement activities within target supply chain, which indicated enhanced overall financial performance of the firm through proper risk management and mitigation.

Suggested Citation

  • Tasdemir, Cagatay & Hiziroglu, Salim, 2019. "Achieving cost efficiency through increased inventory leanness: Evidences from oriented strand board (OSB) industry," International Journal of Production Economics, Elsevier, vol. 208(C), pages 412-433.
  • Handle: RePEc:eee:proeco:v:208:y:2019:i:c:p:412-433
    DOI: 10.1016/j.ijpe.2018.12.017
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S092552731830495X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2018.12.017?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ford W. Harris, 1990. "How Many Parts to Make at Once," Operations Research, INFORMS, vol. 38(6), pages 947-950, December.
    2. Peter R. Winters, 1960. "Forecasting Sales by Exponentially Weighted Moving Averages," Management Science, INFORMS, vol. 6(3), pages 324-342, April.
    3. Andriolo, Alessandro & Battini, Daria & Grubbström, Robert W. & Persona, Alessandro & Sgarbossa, Fabio, 2014. "A century of evolution from Harris׳s basic lot size model: Survey and research agenda," International Journal of Production Economics, Elsevier, vol. 155(C), pages 16-38.
    4. Luana Bonome Message Costa & Moacir Godinho Filho & Antonio Freitas Rentes & Thiago Moreno Bertani & Ronaldo Mardegan, 2017. "Lean healthcare in developing countries: evidence from Brazilian hospitals," International Journal of Health Planning and Management, Wiley Blackwell, vol. 32(1), pages 99-120, January.
    5. J. Nollet & R. Calvi & E. Audet & M. Cote, 2008. "When Excessive Cost Saving Measurement Drowns the Objectives," Post-Print halshs-00365171, HAL.
    6. Torbjørn H. Netland, 2016. "Critical success factors for implementing lean production: the effect of contingencies," International Journal of Production Research, Taylor & Francis Journals, vol. 54(8), pages 2433-2448, April.
    7. Tiacci, Lorenzo & Saetta, Stefano, 2012. "Demand forecasting, lot sizing and scheduling on a rolling horizon basis," International Journal of Production Economics, Elsevier, vol. 140(2), pages 803-814.
    8. Demeter, Krisztina & Matyusz, Zsolt, 2011. "The impact of lean practices on inventory turnover," International Journal of Production Economics, Elsevier, vol. 133(1), pages 154-163, September.
    9. Nick T. Thomopoulos, 2015. "Demand Forecasting for Inventory Control," Springer Books, Springer, edition 127, number 978-3-319-11976-2, December.
    10. J C Ho & Y-L Chang & A O Solis, 2006. "Two modifications of the least cost per period heuristic for dynamic lot-sizing," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(8), pages 1005-1013, August.
    11. Sarker, Bhaba R. & Jamal, A.M.M. & Mondal, Sanjay, 2008. "Optimal batch sizing in a multi-stage production system with rework consideration," European Journal of Operational Research, Elsevier, vol. 184(3), pages 915-929, February.
    12. Andreas Thorsen & Tao Yao, 2017. "Robust inventory control under demand and lead time uncertainty," Annals of Operations Research, Springer, vol. 257(1), pages 207-236, October.
    13. repec:dau:papers:123456789/2775 is not listed on IDEAS
    14. Holmbom, Martin & Segerstedt, Anders, 2014. "Economic Order Quantities in production: From Harris to Economic Lot Scheduling Problems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 82-90.
    15. Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
    16. Jeunet, Jully & Jonard, Nicolas, 2000. "Measuring the performance of lot-sizing techniques in uncertain environments," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 197-208, March.
    17. Stratton, R. & Warburton, R. D. H., 2003. "The strategic integration of agile and lean supply," International Journal of Production Economics, Elsevier, vol. 85(2), pages 183-198, August.
    18. Nick T. Thomopoulos, 2015. "Demand Forecasting for Inventory Control," Springer Books, in: Demand Forecasting for Inventory Control, edition 127, chapter 1, pages 1-10, Springer.
    19. J. Nollet & R. Calvi & M. Cote, 2008. "When Excessive Cost Saving Measurement Drowns the Objectives," Post-Print halshs-00323711, HAL.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Nicolas Haber & Mario Fargnoli, 2022. "Product-Service Systems for Circular Supply Chain Management: A Functional Approach," Sustainability, MDPI, vol. 14(22), pages 1-19, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Rossi, Tommaso & Pozzi, Rossella & Testa, Mariapaola, 2017. "EOQ-based inventory management in single-machine multi-item systems," Omega, Elsevier, vol. 71(C), pages 106-113.
    2. Kroes, James R. & Manikas, Andrew S. & Gattiker, Thomas F., 2018. "Operational leanness and retail firm performance since 1980," International Journal of Production Economics, Elsevier, vol. 197(C), pages 262-274.
    3. Janssen, Larissa & Diabat, Ali & Sauer, Jürgen & Herrmann, Frank, 2018. "A stochastic micro-periodic age-based inventory replenishment policy for perishable goods," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 445-465.
    4. Julieta MIHAYLOVA, 2023. "An Approach To Modeling The Probable Consumers Demand Of Food Products Using Pearson Distribution System And Johnson Distribution System," Business & Management Compass, University of Economics Varna, issue 3, pages 213-223.
    5. Mohammad Ebrahim Arbabian & Hossein Rikhtehgar Berenji, 2023. "Inventory systems with uncertain supplier capacity: an application to covid-19 testing," Operations Management Research, Springer, vol. 16(1), pages 324-344, March.
    6. Karina Copil & Martin Wörbelauer & Herbert Meyr & Horst Tempelmeier, 2017. "Simultaneous lotsizing and scheduling problems: a classification and review of models," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 1-64, January.
    7. Kajjoune, Oussama & Aouam, Tarik & Zouadi, Tarik & Dairi, Meriem, 2021. "Dynamic lot-sizing with short-term financing and external deposits for a capital-constrained manufacturer," International Journal of Production Economics, Elsevier, vol. 242(C).
    8. Beullens, Patrick, 2014. "Revisiting foundations in lot sizing—Connections between Harris, Crowther, Monahan, and Clark," International Journal of Production Economics, Elsevier, vol. 155(C), pages 68-81.
    9. Vahid Reza Soleymanfar & Ahmad Makui & Ata Allah Taleizadeh & Reza Tavakkoli-Moghaddam, 2022. "Sustainable EOQ and EPQ models for a two-echelon multi-product supply chain with return policy," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 24(4), pages 5317-5343, April.
    10. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    11. Yang, Liu & Li, Haitao & Campbell, James F. & Sweeney, Donald C., 2017. "Integrated multi-period dynamic inventory classification and control," International Journal of Production Economics, Elsevier, vol. 189(C), pages 86-96.
    12. Kian, Ramez & Gürler, Ülkü & Berk, Emre, 2014. "The dynamic lot-sizing problem with convex economic production costs and setups," International Journal of Production Economics, Elsevier, vol. 155(C), pages 361-379.
    13. Robert L. Smith & Rachel Q. Zhang, 1998. "Infinite Horizon Production Planning in Time-Varying Systems with Convex Production and Inventory Costs," Management Science, INFORMS, vol. 44(9), pages 1313-1320, September.
    14. Zheng Shi & Zheng Wen, 2014. "Optimal Sales Discount Decision Model with Fixed Ordered Quantities," Journal of Systems Science and Information, De Gruyter, vol. 2(4), pages 345-357, August.
    15. Folarin B. Oyebolu & Jeroen Lidth de Jeude & Cyrus Siganporia & Suzanne S. Farid & Richard Allmendinger & Juergen Branke, 2017. "A new lot sizing and scheduling heuristic for multi-site biopharmaceutical production," Journal of Heuristics, Springer, vol. 23(4), pages 231-256, August.
    16. Wu, Kan & Yuan, Xue-Ming, 2016. "Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demandAuthor-Name: Zhao, Shi Tao," European Journal of Operational Research, Elsevier, vol. 255(2), pages 364-379.
    17. Saranga, Haritha & Moser, Roger, 2010. "Performance evaluation of purchasing and supply management using value chain DEA approach," European Journal of Operational Research, Elsevier, vol. 207(1), pages 197-205, November.
    18. Sagaert, Yves R. & Kourentzes, Nikolaos & De Vuyst, Stijn & Aghezzaf, El-Houssaine & Desmet, Bram, 2019. "Incorporating macroeconomic leading indicators in tactical capacity planning," International Journal of Production Economics, Elsevier, vol. 209(C), pages 12-19.
    19. Marodin, Giuliano & Frank, Alejandro Germán & Tortorella, Guilherme Luz & Netland, Torbjørn, 2018. "Lean product development and lean manufacturing: Testing moderation effects," International Journal of Production Economics, Elsevier, vol. 203(C), pages 301-310.
    20. Prasert Aengchuan & Busaba Phruksaphanrat, 2018. "Comparison of fuzzy inference system (FIS), FIS with artificial neural networks (FIS + ANN) and FIS with adaptive neuro-fuzzy inference system (FIS + ANFIS) for inventory control," Journal of Intelligent Manufacturing, Springer, vol. 29(4), pages 905-923, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:208:y:2019:i:c:p:412-433. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.